Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource.

Slides:



Advertisements
Similar presentations
Transmission Expansion Planning Policy Committee Scott Cauchois Chair, TEPPC April 29, 2009.
Advertisements

Operating Transfer Capability Policy Committee Report Board of Directors Meeting April 21 & 23, 2004 Thomas A. Delawder OTCPC Chair Western Electricity.
California Transmission Planning Group Presentation to: WECC Transmission Expansion Planning Policy Committee June 16-17, 2010 TANC.
WGA West-wide Renewable Energy Zone (WREZ) Project.
Heidi Pacini Staff Engineer Developing a Draft 2011 Study Program March 10, 2010 SWG Conference Call.
1 Bradley Nickell Director of Transmission Planning 10-Year Regional Transmission Plan WECC Overview September 2011.
Energy Efficiency Assumptions in the WIRAB Low Carbon Case Thomas Carr Western Interstate Energy Board July 30, 2008 Studies Work Group Meeting Portland,
Study Results PC8-PC16 System Stress Tests This slide deck contains results from the 2012 TEPPC Study Program related to the various stress tests performed.
Study Results High Hydro Study Low Hydro Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impacts of low.
Liaison Report CREPC Liaison Report Lou Ann Westerfield Idaho Public Utility Commission Market Interface Committee March 6-7, 2008.
Study Results Southwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Southwest Firmed Resource.
TransWest Express and Gateway South WECC Planning Coordination Committee David Smith, National Grid October 25-26, 2007 Vancouver, B.C.
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Study Results Northwest Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Northwest Firmed Resource.
The Big Picture Discussion with the Wyoming Infrastructure Authority and Joint Minerals Committee Steve Ellenbecker Wyoming Infrastructure Authority.
Study Results Wyoming Firmed Resource Option This slide deck contains results from the 2012 TEPPC Study Program related to the Wyoming Firmed Resource.
Western Interconnection Subregions for PSA Layne Brown Manager, Reliability Assessments.
Montana Energy Summit Transmission Planning Process April 22, 2008.
WECC PCC Meeting Salt Lake City, UT July 16, 2014.
Study Case Results PC06 High NG Price PC07 Low NG Price W ESTERN E LECTRICITY C OORDINATING C OUNCIL.
Incorporating Water into Electricity Planning Doug Larson Executive Director Western Interstate Energy Board WSWC-WGA Water/Energy Workshop April 2, 2013.
Energy Gateway Gateway West Project Gateway South Project
Study Results Drought Scenario Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the impact in the interconection.
Western Wind Integration Study Kevin Porter – Exeter Associates, Inc. Brian Parsons, Michael Milligan, Debbie Lew – NREL DOE Wind Program Peer Review July.
Past Studies and Resource Diversity Western Renewable Energy Zones, a joint initiative of the Western Governor’s Association and the U.S. Department.
1 Bradley Nickell Director of Transmission Planning Incorporation of Water in Transmission Planning April 2, 2013.
Successful Transmission Planning & Development in the West Kelly Barr Manager, Regulatory Affairs & Contracts Salt River Project Phoenix, Arizona June.
California Energy Commission Staff Paper - April 12,20071 Estimating the Generation Resource Mix of Electricity Imports to California – Energy Commission.
CWAG ENERGY CONFERENCE BIG SKY, MT Collaborative Efforts to Find Solutions: A Case Study – The Mountain States Transmission Intertie (MSTI) Presented by.
Sixth Northwest Conservation & Electric Power Plan Draft Wholesale Power Price Forecasts Maury Galbraith Northwest Power and Conservation Council Generating.
California Energy Commission Renewable Energy Transmission Initiative (RETI) Part I Jeffrey D. Byron California Energy Commission Energy Action Plan (EAP)
Cathy S. Woollums Sr. V.P. Environmental MidAmerican Energy Holdings Company NARUC Annual Convention November 12, 2007 U.S. Climate Policy: It Takes a.
Icfi.com © 2006 ICF International. All rights reserved. Wyoming Collector and Transmission System Project – Status Report Presented to: Wyoming Infrastructure.
Study Results High EE/DG/DR Study This slide deck contains results from the 2011 TEPPC Study Program. This study shows the results of an increase of EE/DG/DR.
“DRAFT” RMATS 2008 Base Case (To be presented at the RMATS Stakeholders Meeting) March 17, 2004.
Western Renewable Energy Zone (WREZ) Concept (as of 11/27/07)
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT Thomas Carr Western Interstate Energy Board State-Provincial Steering Committee Update.
1 Wind Integration Study Team (WIST) Report to the Northwest Wind Integration Forum Technical Work Group October 29, 2009 Jeff Miller - ColumbiaGrid Rich.
BC Coordinated Planning Group Development of BCCPG Charter Steering Committee Meeting – Conference Call Friday, May 27, – 2:30pm.
Sixth Northwest Conservation & Electric Power Plan Interim Wholesale Electricity Price and Carbon Dioxide Production Forecasts Maury Galbraith Northwest.
PC21 Coal Retirement Study TAS/TEPPC – Nov W ESTERN E LECTRICITY C OORDINATING C OUNCIL WECC System Adequacy Planning.
RETI 2.0 Objectives The Clean Energy and Pollution Reduction Act of 2015 (Chapter 547, Statutes of 2015) increases the RPS to at least 50 percent of retail.
Northwest Wind Integration Forum Technical Work Group Meeting October 29, 2009.
NW Loss of Load Probability James Gall Power Supply Analyst
PacifiCorp and CAISO Expanding Regional Energy Partnerships
Greg Brinkman Debbie Lew National Renewable Energy Laboratory Golden, Colorado USA Western Wind and Solar Integration Study: February TRC meeting – Transmission.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
Thomas Carr Western Interstate Energy Board ColumbiaGrid Planning Meeting August 1, 2013 Grid Tracker: A web-based tool to analyze historic transmission.
Regional Transmission Expansion Project Staff Council Briefing Tom Kaiserski (MT) Program Manager February 15, 2011 Governor’s Office of Economic Development.
CREPC/WIRAB Meeting April 27, 2016 Salt Lake City, UT Thomas Carr Western Interstate Energy Board Evolution of Grid Planning in the West.
Northern Tier Transmission Group Report to Columbia Grid Planning Committee February 9, 2012 “To ensure efficient, effective, coordinated use & expansion.
PC05 Low Hydro Study Results
PC04 High Hydro Study Results
Studies Work Group Update
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
SPSG Meeting August 17, 2016 Salt Lake City, UT
Keegan Moyer Interim Manager, Transmission Expansion Planning
Tyler Butikofer Associate Engineer II
TAS Quarterly Meeting November 2-3, 2016 Michael Bailey, P.E. WECC
Western Electricity Coordinating Council
Strawman 2017 Study Program Framework: March 22
Planning Committee- Map
Western Electricity Coordinating Council
Study Results PC8-PC16 System Stress Tests
Tyler Butikofer, WECC Tom Carr, WIEB
Study Results California In-State Net-Short California Out-State Net-Short California Out-State Net-Short w SWIP N This slide deck contains results from.
Tyler Butikofer Associate Engineer II
TEPPC Meeting May 6-7, 2015 Salt Lake City, UT
Study Results Drought Scenario Study
Tyler Butikofer Tom Carr
Presentation transcript:

Renewable Energy Transmission Initiative 2.0 Plenary Group Meeting April 18, 2016 Sacramento, CA Thomas Carr Western Interstate Energy Board TEPPC’s Resource Options Cases for RETI 2.0

TEPPC’s “Resource Options Cases” Meeting Purpose: Exploration renewables resources that could help meet California’s long-term greenhouse gas reduction and renewable energy goals TEPPC’s Resource Option Cases Western Electricity Coordinating Council (WECC) Transmission Expansion Planning Policy Committee (TEPPC) performs Interconnection-wide transmission planning In , TEPPC modeled a set of cases assuming 12,000 GWh of renewable energy are added to the grid to meet higher loads and RPS requirements across the West in the study year Known as the 2022 “Resource Options Cases” 2

Data from Western Renewable Energy Zone (WREZ) project 3

Western Transmission Paths 4

Key Paths 5 P49 East of River P45 West of River P66 COI P65 PDCI P8 MT to NW P19 Bridger P27 IPP P18 MT to ID

PC20 Southwest 6

PC20 Southwest transmission Expansion Case Centennial West 7 P49 East of River P45 West of River Centennial West

PC21 Wyoming 8

PC20 Wyoming Transmission 9

PC22 Montana 10

PC20 Montana Transmission Expansion Cases 11 Path 8 Upgrade MISTI- SWIP

PC23 Northwest 12

PC23 Northwest Transmission Expansion Cases 13 BC to WA projects

PC24 Basin 14

PC24 Basin Transmission Expansion Cases 15

PC25 Colorado 16

PC25 Colorado Transmission 17

Synopsis of the cases 18

Summary of cost analysis 19

Questions? Thomas Carr Western Interstate Energy Board