ADS V1.0 RPS Check Tyler Butikofer Associate Engineer II Western Electricity Coordinating Council

2 Brief Review of Process
Collected all generation that complies with RPS goals Allocated the generation to state/providence Calculated RPS requirements for each state/providence Calculated if RPS requirements are met for each state/providence Western Electricity Coordinating Council

3 Renewable Generator Allocation Methodology
BTM-PV is counted toward the RPS goal for all states except California If the unit was also in the 2026 CC, the same allocation was used for the 2028 ADS PCM Units not coming from 2026 CC All units located in CA were allocated to CA All units located in AB were allocated to AB Other units were researched and allocated according to utility websites, power purchase agreements, etc. 158 left after and those units were allocated to the states which they were located in. Western Electricity Coordinating Council

4 Western Electricity Coordinating Council
Energy Requirement The sales forecast assumes a loss of 6% transmission loss from the load forecast. California is an exception in that the BTM-PV forecast is taken out of the sales forecast in addition to the 6% transmission losses. Western Electricity Coordinating Council

5 California Incremental RPS Goal
At the end of 2027, the incremental goal is 45% We assumed 46.67% for 2028 Western Electricity Coordinating Council

6 RPS Summary by Development Status
If the RPS Gap is in parenthesis, the state/providence is exceeding their RPS. If the RPS Gap is not in parenthesis, the state/providence is not meeting their RPS Western Electricity Coordinating Council

7 RPS Summary by Development Status

8 Load Served by State and Type (GWh)
Western Electricity Coordinating Council

9 Load Served by State and Type

10 tbutikofer@wecc.biz 801-819-7604
Questions? Western Electricity Coordinating Council

11 Appendix A Calculating RPS Targets
Western Electricity Coordinating Council

12 RPS Check for RAC/WECC Studies
Thomas Carr Western Interstate Energy Board January 31, 2018 Western Electricity Coordinating Council

13 How to calculate RPS energy targets for states/provinces in the Western Interconnection
General RPS framework Identify key RPS provisions for states/provinces Derive state/provincial loads and sales from BA forecasts Calculate RPS energy targets (GWh) for each state/province

14 General RPS Framework General rule across jurisdictions:
Base (GWh) x Rate (%) = RPS RE (GWh) RPS RE = Target level of renewable energy Base = Sales of electricity by utilities covered by the RPS policy (e.g. IOUs, coops, munis, etc) Rate = Percentage of electricity sales that must be from renewable generation (e.g., wind, solar, geothermal, biomass) Western Electricity Coordinating Council

15 2c. Derive State/Provincial loads and sales from BA forecasts
WECC collects load forecasts from Balancing Areas (BA) Allocate 40 BA load forecasts into 12 states, 2 provinces, MX 9 BAs cover multiple states

16 State/Province Loads and Sales
- Allocate BA load to each state/province - Convert loads to sales assuming 6% T&D loses - Sum across each state/province - California updated by CEC forecast CED Western Electricity Coordinating Council

17 State/Province Loads and Sales cont.

18 9 BAs with footprint over multiple states
Western Electricity Coordinating Council

19 2d. Calculate RPS Targets
Apply policy rules for each jurisdiction Base (GWh) x Rate (%) = RPS RE (GWh)

20 2028 Loads, Sales and RPS Targets
Western Electricity Coordinating Council

21 Appendix B Gathering RPS Units and Allocating to States/Providences
Western Electricity Coordinating Council

22 Western Electricity Coordinating Council
Gathering RPS Units Select all renewable sub-types that apply Biomass DG-BTM Geothermal Hydro RPS (California) Solar PV Solar Thermal Wind Turbine Western Electricity Coordinating Council

23 Determining State/Prov Allocations
If located in Alberta or California, allocated to Alberta or California, respectively If located in other states, looked for Power Purchase Agreements (PPAs) or other data from energy websites or utility websites (reference is sited in workbook) If we couldn’t locate PPAs, the resource was allocated to the state for which it was locate for states with a RPS Western Electricity Coordinating Council