DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf.

Slides:



Advertisements
Similar presentations
M.J. LeVine1STAR HFT meeting, Mar 10, 2010 STAR SSD upgrade M. LeVine, R. Scheetz BNL Ch. Renard, S. Bouvier Subatech H. Matis, J. Thomas LBNL.
Advertisements

“L3” Jeff Landgraf. In July, Hank sent me a message asking if I had any talks for this meeting. “No, but I have some issues that could be discussed.”
HLT Collaboration; High Level Trigger HLT PRR Computer Architecture Volker Lindenstruth Kirchhoff Institute for Physics Chair of Computer.
1 500cm 83cm 248cm TPC DETECTOR 88us 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 1MIP = 4.8 fC = 3 x10 4 e Dynamic : 30 MIP S / N = 30:1 LATERAL.
6 Mar 2002Readout electronics1 Back to the drawing board Paul Dauncey Imperial College Outline: Real system New VFE chip A simple system Some questions.
PXL RDO System Requirements And meeting goals 11/12/2009BNL_CD-1_SENSOR_RDO - LG1.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Front-end electronics for Time Projection Chamber I.Konorov Outlook:  TPC requirements  TPC readout options  Options for TPC FE chips  Prototype TPC.
LHCb Upgrade Overview ALICE, ATLAS, CMS & LHCb joint workshop on DAQ Château de Bossey 13 March 2013 Beat Jost / Cern.
HEP2005, Lisboa July 05 Roberto Campagnolo - CERN 1 HEP2005 International Europhysics Conference on High Energy Physics ( Lisboa-Portugal,
28 August 2002Paul Dauncey1 Readout electronics for the CALICE ECAL and tile HCAL Paul Dauncey Imperial College, University of London, UK For the CALICE-UK.
Readout of TPC with modified ALICE electronics details of current version and pending items ALICE overview New software based on homemade partly existing.
The first testing of the CERC and PCB Version II with cosmic rays Catherine Fry Imperial College London CALICE Meeting, CERN 28 th – 29 th June 2004 Prototype.
4 Dec 2001First ideas for readout/DAQ1 Paul Dauncey Imperial College Contributions from all of UK: result of brainstorming meeting in Birmingham on 13.
Jianchun (JC) Wang, 08/21/99 RICH Electronics and DAQ Chip Carrier Short Cable Transition Board Long Cable Data Board Crate J.C.Wang Syracuse University.
LKr readout: present and future R. Fantechi 30/8/2012.
Possible DAQ Upgrades DAQ1k… DAQ2k… DAQ10k!? Tonko Ljubičić STAR/BNL (for the “3L Group” — Landgraf, LeVine & Ljubičić) (Lange would fit nicely too, )
DDL hardware, DATE training1 Detector Data Link (DDL) DDL hardware Csaba SOOS.
H. MatisTracking Upgrade Review – Dec. 7, SSD Update Howard Matis.
PHENIX upgrade DAQ Status/ HBD FEM experience (so far) The thoughts on the PHENIX DAQ upgrade –Slow download HBD test experience so far –GTM –FEM readout.
Leo Greiner TC_Int1 Sensor and Readout Status of the PIXEL Detector.
S.Vereschagin, Yu.Zanevsky, F.Levchanovskiy S.Chernenko, G.Cheremukhina, S.Zaporozhets, A.Averyanov R&D FOR TPC MPD/NICA READOUT ELECTRONICS Varna, 2013.
Leo Greiner IPHC DAQ Readout for the PIXEL detector for the Heavy Flavor Tracker upgrade at STAR.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Bernardo Mota (CERN PH/ED) 17/05/04ALICE TPC Meeting Progress on the RCU Prototyping Bernardo Mota CERN PH/ED Overview Architecture Trigger and Clock Distribution.
Michal Szelezniak – LBL-IPHC meeting – May 2007 Prototype HFT readout system Telescope prototype based on three Mimostar2 chips.
1 VeLo L1 Read Out Guido Haefeli VeLo Comprehensive Review 27/28 January 2003.
STAR Collaboration Meeting, Nantes Alexandre A. P. Suaide Wayne State University Slide 1 EMC Commissioning for the run Review of last.
Xiangming Sun1PXL Sensor and RDO review – 06/23/2010 STAR XIANGMING SUN LAWRENCE BERKELEY NATIONAL LAB Firmware and Software Architecture for PIXEL L.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
1 DAQ Update MEG Review Meeting, Feb. 17 th 2010.
L. Greiner 1St. Odile CMOS Workshop – September 6-9, 2011 STAR HFT LBNL Leo Greiner, Eric Anderssen, Thorsten Stezelberger, Joe Silber, Xiangming Sun,
HBD electronics status All the ADC and XMIT boards are installed. –Top 3 crates are for the ADC, XMIT boards –Bottom crate is for test pulse boards/future.
D0 Status: 01/14-01/28 u Integrated luminosity s delivered luminosity –week of 01/ pb-1 –week of 01/ pb-1 –luminosity to tape: 40% s major.
Florida Institute of Technology, Melbourne, FL
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
LC Power Distribution & Pulsing Workshop, May 2011 Super-ALTRO Demonstrator Test Results LC Power Distribution & Pulsing Workshop, May nd November.
Links from experiments to DAQ systems Jorgen Christiansen PH-ESE 1.
Leo Greiner IPHC beam test Beam tests at the ALS and RHIC with a Mimostar-2 telescope.
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
STAR Pixel Detector readout prototyping status. LBNL-IPHC-06/ LG22 Talk Outline Quick review of requirements and system design Status at last meeting.
1 Level 1 Pre Processor and Interface L1PPI Guido Haefeli L1 Review 14. June 2002.
TPC electronics Status, Plans, Needs Marcus Larwill April
HBD/TPC Electronics Status Works done to for a)Prototype detector readout b)Understand packing density and heat loading issues c)Address the overall system.
A. KlugeFeb 18, 2015 CRU form factor discussion & HLT FPGA processor part II A.Kluge, Feb 18,
.1PXL READOUT STAR PXL READOUT requirement and one solution Xiangming Sun.
1 19 th January 2009 M. Mager - L. Musa Charge Readout Chip Development & System Level Considerations.
1 Carleton/Montreal Electronics development J.-P Martin (Montreal) Shengli Liu & M. Dixit (Carleton) LC TPC Meeting DESY Hamburg, 4 June 2007.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
The ALICE TPC Readout Control Unit 10th Workshop on Electronics for LHC and future Experiments 13 – 17 September 2004, BOSTON, USA Carmen González Gutierrez.
Overview of TPC Front-end electronics I.Konorov Outline:  TPC prototype development  Readout scheme of the final TPC detector and further developments.
SVD FADC Status Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 5 February 2013.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
FEE for TPC MPD__NICA JINR
A General Purpose Charge Readout Chip for TPC Applications
Electronics Trigger and DAQ CERN meeting summary.
96-channel, 10-bit, 20 MSPS ADC board with Gb Ethernet optical output
AFE II Status First board under test!!.
ALICE – First paper.
Design of Digital Filter Bank and General Purpose Digital Shaper
Large CMS GEM with APV & SRS electronics
PCI BASED READ-OUT RECEIVER CARD IN THE ALICE DAQ SYSTEM
Example of DAQ Trigger issues for the SoLID experiment
The CMS Tracking Readout and Front End Driver Testing
PID meeting Mechanical implementation Electronics architecture
The LHCb Front-end Electronics System Status and Future Development
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Presentation transcript:

DAQ 1000 Tonko Ljubicic, Mike LeVine, Bob Scheetz, John Hammond, Danny Padrazo, Fred Bieser, Jeff Landgraf

Current TPC Electronics Basics 5184 FEEs – Front End Electronics 5184 FEEs – Front End Electronics Analog shaping, tail suppression, ADC. No event buffering. Analog shaping, tail suppression, ADC. No event buffering. 144 RDOs – Readout Boards 144 RDOs – Readout Boards Located on TPC, multiplexes 36 FEE’s to a single fiber. Located on TPC, multiplexes 36 FEE’s to a single fiber. 144 Receiver Boards 144 Receiver Boards Located in VME crates in the DAQ room. Located in VME crates in the DAQ room. Pedestal subtraction, zero suppression, gain corrections, T0 corrections, 2-d cluster finding. Pedestal subtraction, zero suppression, gain corrections, T0 corrections, 2-d cluster finding. Sector Brokers / Event Builders / RCF network Sector Brokers / Event Builders / RCF network Full 10 bit, 512 time-bin, channel data is transferred to the receiver boards for every event.  100 Hz maximum rate 10ms dead time for each event (1% dead / hz taken) 10ms dead time for each event (1% dead / hz taken)

Summary DAQ 1000 is a project to replace the TPC FEE’s, RDO’s, and DAQ with a system capable of 1000hz (Au-Au, central) DAQ 1000 is a project to replace the TPC FEE’s, RDO’s, and DAQ with a system capable of 1000hz (Au-Au, central) Based on ALICE’s Altro/Pasa chips, as well as their DDL links. Based on ALICE’s Altro/Pasa chips, as well as their DDL links.

ALTRO / PASA Chip Order After long delays the chip purchase contract is in place. After long delays the chip purchase contract is in place. Expect delivery by beginning of February Expect delivery by beginning of February We have 120 Altro/Pasa pairs at BNL as an advance from the big order. 72 are required to outfit the entire 36 FEEs needed for a single RDO. We have 120 Altro/Pasa pairs at BNL as an advance from the big order. 72 are required to outfit the entire 36 FEEs needed for a single RDO.

FEE ALTRO/PASA pairs perform pulse shaping, ADC, zero suppression, pedestal subtraction, gain corrections, and tail subtraction on the FEE, before transferring data to DAQ. ALTRO/PASA pairs perform pulse shaping, ADC, zero suppression, pedestal subtraction, gain corrections, and tail subtraction on the FEE, before transferring data to DAQ.  Huge data rate increase even though link speed is comparable  Multi-Event Buffering on ALTRO  Zero dead time as long as throughput remains less than max rate. This allows us to increase the min-bias rate modestly (x 2-5) while rare triggers sample full luminosity. ALTRO/PASA pairs perform pulse shaping, ADC, zero suppression, pedestal subtraction, gain corrections, and tail subtraction on the FEE, before transferring data to DAQ. ALTRO/PASA pairs perform pulse shaping, ADC, zero suppression, pedestal subtraction, gain corrections, and tail subtraction on the FEE, before transferring data to DAQ.  Huge data rate increase even though link speed is comparable  Multi-Event Buffering on ALTRO  Zero dead time as long as throughput remains less than max rate. This allows us to increase the min-bias rate modestly (x 2-5) while rare triggers sample full luminosity.

FEE Prototypes Total of 4 prototype versions so far. Total of 4 prototype versions so far. Noise problems in the first prototype fixed. Noise problems in the first prototype fixed. Currently preparing to fabricate 50 production boards for use in the 2007 run. Currently preparing to fabricate 50 production boards for use in the 2007 run.

4 FEE’s installed in TPC during 2005 Pedestal / Laser / Real Data Hits Demonstrated that we understand the operating modes of the ALTRO chip Pedestal subtractionPedestal subtraction Exponential Tail SubtractionExponential Tail Subtraction

RDO First prototype was a daughter card to be used with a Microtronics FPGA development board. First prototype was a daughter card to be used with a Microtronics FPGA development board. Second prototype now fabricated: full sized for insertion in TPC Second prototype now fabricated: full sized for insertion in TPC

Non-TPC upgrades A PCI network card to receive the standard STAR GLINK fiber protocol is being developed. A PCI network card to receive the standard STAR GLINK fiber protocol is being developed. The card makes use of the fact that the commercial DDL interconnect we are using incorporates the fiber interface in a separate daughter card, so only the daughter card needs to be adapted. The card makes use of the fact that the commercial DDL interconnect we are using incorporates the fiber interface in a separate daughter card, so only the daughter card needs to be adapted. The card makes it possible move existing detectors from custom VME boards to cheap/fast PC’s. The card makes it possible move existing detectors from custom VME boards to cheap/fast PC’s. BTOW, ETOW, BSMD, ESMD, SSD, TOF are good candidates. BTOW, ETOW, BSMD, ESMD, SSD, TOF are good candidates.

Other hardware RDO power supplies RDO power supplies Current supplies are +/- 8V Current supplies are +/- 8V RDO needs only 5V RDO needs only 5V It would be possible to reduce the heat load by replacing the power supplies for a cost of $70k. It would be possible to reduce the heat load by replacing the power supplies for a cost of $70k. Configuration / Slow controls Configuration / Slow controls DDL link is bi-directional, so configuration of FEE’s/RDO’s is performed through DAQ interface. DDL link is bi-directional, so configuration of FEE’s/RDO’s is performed through DAQ interface. Slow controls will still operate power supply switches. Slow controls will still operate power supply switches.

Event Building Plan to move to Gb ethernet network rather than myrinet. Plan to move to Gb ethernet network rather than myrinet. PC’s rather than VME custom receiver boards for lower cost / higher reliability / better performance / easier repair. PC’s rather than VME custom receiver boards for lower cost / higher reliability / better performance / easier repair. One sector per PC is the likely scenario (6 PCI cards). One sector per PC is the likely scenario (6 PCI cards). Push architecture which will have some repercussions on data format. (I will provide readers which should make this transparent to the offline code) Push architecture which will have some repercussions on data format. (I will provide readers which should make this transparent to the offline code)

Schedule 2007 Run – 1 RDO with full complement of 36 FEE’s installed by late November 2006 with existing manpower shutdown through end of 2008 Run – Exact schedule depends on 2007 run experience. 2 EEs, 4 techs 2 EEs, 4 techs PCB fab, assembly, inspection, 1 st level testing, and final testing and acceptance for boards Shutdown – 2 EEs, 4 techs Removal of existing TPC electronics, installation of new FEEs, RDOs, cabling, & modifications of power supplies 2009 Run – First full physics run with DAQ1000

Differences From Existing Electronics Digital tail suppression  we control parameters Digital tail suppression  we control parameters More simplistic zero suppression algorithm (Altro hit is adc>th for n time-bins, STAR ASIC has 2 sets of threshold/duration pairs) More simplistic zero suppression algorithm (Altro hit is adc>th for n time-bins, STAR ASIC has 2 sets of threshold/duration pairs) Out of hit data available (even if negative values after pedestal subtraction) Out of hit data available (even if negative values after pedestal subtraction) More complicated options for pedestal subtraction More complicated options for pedestal subtraction Moving average out-of-event baseline correction. Moving average out-of-event baseline correction. Moving average in-event pedestal correction Moving average in-event pedestal correction Digitization on Altro is constant into a circular buffer, so can potentially read out data previous to the gated grid opening &/or without the gated grid opening. (however still need a trigger) Digitization on Altro is constant into a circular buffer, so can potentially read out data previous to the gated grid opening &/or without the gated grid opening. (however still need a trigger)

Summary DAQ 1000 on schedule for full roll out in 2009 DAQ 1000 on schedule for full roll out in full RDO planned for full RDO planned for 2007