1 paul drumm; Date; Title …project report …more comments paul drumm february 2005.

Slides:



Advertisements
Similar presentations
Report from MICE project teams Proposed MICE organogram: revised Revised request for resources for financial year 2003/04 Review of iMICE schedules – status.
Advertisements

MICE: Hall Infrastructure Chris Nelson CEng CM15 8 th June 2006.
AFC engineering group meeting on the 26 th of Jan 2004 MICE Absorber Focus Coil work schedule for the next 6 months By Wing Lau, Oxford.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
MICE Collaboration meeting at CERN March 28 – April 1, 2004 MICE Cooling Channel --- AFC Module work group report Wing Lau – Oxford.
Paul drumm daq&c-ws august/september Cooling Channel.
1 paul drumm; ; FAC-PR MICE Project Status Funding Agency Committee 19 th September 2005.
March 2003 Paul Drumm MICE Collaboration Meeting, CERN 1 Beam Line & Installation Plans Paul Drumm CLRC Rutherford Appleton Laboratory.
Paul drumm; 1 st December 2004; PM&TB Report 1 Project Management & Technical Board Reports.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
MICE Project Report Paul Drumm ~ Sunday August 1 st 2004.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
MICE CMPB 3-Feb-2006 Alain Blondel 1 Status of MICE.
Paul drumm; 3rd December 2004; AFC MM 1 Why? Goal: Ultimate (CCLRC defined) Safety & Design Review –How do we get there? We need a Process –What is needed?
UK Funding PPRP Meeting on Monday 30 th June Accepted need for urgent work this year –no discussion on this –but also no indication of the level of funds.
Proposal for a Constitution for MICE A Plan for Discussion P Dornan G Gregoire Y Nagashima A Sessler.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
1 paul drumm; ; FAC-PR MICE Project Status Report to the Funding Agency Committee 19 th September 2005 Paul Drumm MICE Project Manager.
MICE Collaboration meeting RAL 21 – 24 Oct 2005 Summary of Design & Safety review progress By Wing Lau – Oxford University.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Paul Drumm 25 March 2004 MICE at Project Report CERN Collaboration Meeting 29 March 2004.
MICE Collaboration Meeting Harbin, China 13 – 17 January 2009 Integration Issues By Wing Lau, Oxford University.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
May 12, 2004 TJR1 Effects of Upstream ParticleID Counters on MICE Good-Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
Main progress on Design & Safety Review: EmCAL -- Received the revised TRD write up from Ludovico Design & Safety Audit sheets need to be revised to correspond.
MICE TECHNICAL UPDATE & ISIS/RAL PLANS. Belgium Italy Japan The Netherlands Russian Federation Switzerland UK USA Acknowledge.
MICE Status (with a UK slant) Paul Drumm, MICE Collaboration UK-NF June 2003.
Project manager report paul drumm CM16 October 2006.
MICE Collaboration Meeting Frascati 26 – 29 June 2005 Work Group report On Design & Safety Review.
1 pd, PAC 2005 MICE Muon Ionisation Cooling Experiment Paul Drumm Rutherford Appleton Laboratory 19 th May 2005.
MICE collaboration meeting Alain Blondel 27 – Welcome to the 10th MICE collaboration meeting. 1.Global neutrino factory situation 2.Possible.
Alain Blondel – introduction MICE CM Collaboration meeting June 2007 at RAL Complete review of the project Organization of efforts towards.
U.S. Muon Accelerator Program: MICE Milestones & Resource-Loaded Schedule M. A. Palmer, Director October 31, 2012.
MICE collaboration meeting Alain Blondel october MICE collaboration meeting 13 at RAL News The international context Goals of the meeting.
1 MICE Collaboration meeting at Berkeley 9 – 12 February 2005 Integrated Design & Safety Review Presented by Wing Lau & Paul Drumm.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MCTF 8/17/06 A. Bross MTA Activities and Plans MCTF August 17, 2006 A. Bross.
MICE Status & Plans MICE-UK paul drumm 15 th September 2004.
John Womersley Welcome Director of Particle Physics, CCLRC International Scoping Study Meeting, RAL April 2006.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE: The International Muon Ionisation Cooling Experiment MOPLT106 Abstract The provision of intense stored muon beams would allow the properties of neutrinos.
Design & Safety Review Work Group meeting 10 March 2005 Progress update Wing Lau, Oxford.
Hall clearance completed Revisiting Water & Cryo Plant Prepare for shutdown ’04 –beam tube –Contract hole cutting Negotiating with DF to help target work.
Paul Drumm, cm10, 27 Oct 2004 MICE Project Report Paul Drumm Collaboration Meeting 10 Rutherford Appleton Laboratory October 2004.
MICE Project Report Alan Bross (for Paul Drumm). Project Issues ● Key dates: – ISIS Synchrotron start-up scheduled for 1st August ● Shielded area around.
MICE CMPB Alain Blondel 1 Highlights on MICE.
MICE FAC open session Alain Blondel 1   MICE The International Muon Ionization Cooling Experiment.
MICE VC Alain Blondel MICE News 9 March 2005 we did not succeed in preparing a good enough I3 proposal for EU on neutrinos. Problems were.
1 MICE PID Group Meeting 11 May 2005 Update on Design & Safety Review Presented by Wing Lau.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
MICE CM39 St Catherine’s, Oxford, 26 June 2014 Paul Soler Instrumentation Global Commissioning Plan.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
MICE CM20 Alain Blondel 10 February The International Muon Ionization Cooling Experiment MICE CM20 Spokesmouse remarks.
WBS ? Proposed by IPRP … –Preparation for a review –MICE Costs & Time Scales need to be more accurate & Justified –Technical Leaders arranged by technology.
ch/~bdl/lepc/lepc.ppt 1 MICE Status and Plans Rikard Sandström Université de Geneve International Scoping Study CERN,
1 Status of infrastructure MICE Collaboration Meeting, Frascati, June 26-29, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation.
Malcolm Ellis – Brunel University – 8th April The International Muon Ionization Cooling Experiment.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
1 How the Muon Ionization Cooling Experiment Found a Home MICE hall at RAL in Spring
1 MICE UK meeting at RAL 05 May 2005 Integrated Design & Safety Review Presented by.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
MICE VC Alain Blondel, April MICE exectutive board met on 1 April 2004 after the collaboration meeting and remarked the very large amount of.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
Status of the MICE Construction Project
The Muon Ionization Cooling Experiment: Controls and Monitoring
Controls & Monitoring in MICE
Presentation transcript:

1 paul drumm; Date; Title …project report …more comments paul drumm february 2005

paul drumm; Date; Title 2 Money Good fortunes… –UK funds almost within reach –Funds in US Things to look forward to… –Developments in US / MRI –Development in EU / INFN bid / EU bid…

paul drumm; Date; Title 3 UK Funding Progress Almost ready to… –PPARC Council Meeting 22nd Feb. –CCLRC Council Meeting 23rd Feb. –RC-UK Council Meeting 24 th Feb. –Funding statement end March? –General Election in May? Immediate Actions: –Sign PSI MoU! –Tender for solenoid cryogenic system

paul drumm; Date; Title 4 UK Organisation MICE Joint Project Board –Becomes ? We’ll find out when we get there! MICE-UK Project reporting (to pparc/cclrc) –Function: Track spend & progress, raise issues MICE-UK open meetings –Bi-monthly, in person ( ) –Nomadic –Show & Tell (open to all, but no video or phone)

paul drumm; Date; Title 5 Technical Progress Layout of hall, cooling channel & Instrumentation – the full picture –Link from Speakers Bureau –Page maintained at Oxford (Stephanie) –High resolution Very good for presentations; Information; Consistency ;  Good level of engineering detail is available  Already showing benefits…  urge to keep current  urge collaboration to use

paul drumm; Date; Title 6 Technical Issues for CM Develop more: –Hydrogen System R&D plan –Absorber System R&D plan –Force management –Staging & Optics –Stage II Solenoid – configuration & Shielding  –Responsibilities – political Detector Shield; which design? Cost – Engineering – weight O(70%)… Radiation Shield; design part of tracker responsibility Decide? –Tracker Validation –Design & Safety Review (audit) Process Consider: –Spectrometer solenoid for beam characterisation Consequences of shielding & access to …

paul drumm; Date; Title 7 Phase 1 spectrometer Cherenkov ToF ECal Vac seal? iron Engineering consequences of staging; differences to phase 3…

paul drumm; Date; Title 8 Design & Safety Working Group Ultimate Goal –Achieve Readiness and –Permission to Operate –Means ensuring a safe well engineered MICE –And proving it… Task delegated to Wing & Group… –Applies to all MICE hardware Detailed examination of Safety & Design ditto Operating and Fault procedures Demonstrate a robust appreciation of issues: –safety, design, interfaces –More later…

paul drumm; Date; Title 9 Technical Reference Document On the web – still being revised/updated –One stop source of parameters –Working towards design & safety review will mean additions and expansions of the information contained there… –The baseline, current activities and changes will be highlighted on the web page….

paul drumm; Date; Title 10 TRD…

paul drumm; Date; Title 11 Building… the First steps… Towards “phase 1” –Progress on tracker (KEK Tests) –Progress on Muon Beam Line –Target, target test (benchmark) proposal –General engineering –Shielding “Phase 2” issues –R&D – hydrogen & absorber; RF Power –Cooling channel;