E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009.

Slides:



Advertisements
Similar presentations
BE/CO Changes in LS1 to the Software Development Infrastructure and Widely Used Libraries Chris Roderick, Greg Kruk, Katarina Sigerud, Luigi Gallerani,
Advertisements

1 Commissioning ABT Equipment in the LHC Jan Uythoven ABT TCM 13/01/2015.
SOFTWARE PACKAGES Status and commissioning plans D.Jacquet with input from : V.Baggiolini, J.C.Bau, M.Buttner, S.Deghaye, G.Kruk, C.Roderick, K.Sigerud,
Post Mortem Workshop - discussion1 17/1/2007 HWC Requirements GMPMA  Concentrate on pre-beam requirements Post-quench analysis ([semi-] automatic) Integrity.
BE-CO work for the TS Nov 8 Nov 11P.Charrue - BE/CO - LBOC1.
Implementation Review1 Moving Pre-Archive Pipeline Processing March 14, 2003 Forrest Hamilton/OPUS Ops.
FileSecure Implementation Training Patch Management Version 1.1.
Wojciech Sliwinski for BE-CO group Special thanks to: E.Hatziangeli, K.Sigerud, P.Charrue, V.Baggiolini, M.Sobczak, M.Arruat, F.Ehm LHC Beam Commissioning.
E. Hatziangeli – LHC Beam Commissioning meeting - 17th March 2009.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Distributed BI Systems BLM, BPM, BTV and BRAN Laurette Ponce & Fabio Follin Thanks to: Anthony Rey, Enrico Bravin, Rhodri Jones, Bernd Dehning, Mariusz.
V. Kain, G.H. Hemelsoet AB/OP1Nov 08, 2007 LHC Injection System V.Kain, G.H. Hemelsoet, AB/OP Input from: E. Carlier, B. Goddard, J. Wenninger What do.
CCC Commissioning Django Manglunki, AB/OP PS-SPS Days 18/1/2006.
Controls Issues Injection beam2 test meeting 28 th Aug 2008 Eugenia Hatziangeli Input from J. Lewis, M. Sobzak, JJ Gras, C. Roderick, M.Pace, N. Stapley,
“we believe the reason why the first bunch is more intense than the following 3 is that it's on that one that the SPS RF loops are locked” Philippe & Django.
Wojciech Sliwinski for the BE-CO Middleware team: Wojciech Buczak, Joel Lauener Radoslaw Orecki, Ilia Yastrebov, Vitaliy Rapp (GSI)
T HE BE/CO T ESTBED AND ITS USE FOR TIMING AND SOFTWARE VALIDATION 22 June BE-CO-HT Jean-Claude BAU.
LHC BLM Software revue June BLM Software components Handled by BI Software section –Expert GUIs  Not discussed today –Real-Time software  Topic.
Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE  Questions? RADE Applications EN-ICE-MTA.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
FGC Upgrades in the SPS V. Kain, S. Cettour Cave, S. Page, J.C. Bau, OP/SPS April
Controls Renovations and End of Life (EoL) plan of major components of the controls infrastructure Eugenia Hatziangeli.
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
CERN Raul Murillo Garcia BE-CO LS1 review – TE-EPC feedback BE-CO LS1 review TE-EPC feedback Raul Murillo Garcia on behalf of TE-EPC Daniel Calcoen Stephen.
RBAC Content: LHC Operational Mode Piquet Roles RBAC Strict LHC Operational mode and CMW Acknowledgements: Pierre C., Wojtek S., Stephen P., Lars J., Verena.
Nominal Workflow = Outline of my Talk Monitor Installation HWC Procedure Documentation Manufacturing & Test Folder Instantiation – NC Handling Getting.
Real time performance estimates of the LHC BPM and BLM system SL/BI.
LHC Machine Checkout & Dry Runs Strategy Acknowledgements: R.Alemany, R.Giachino M. Albert LHC Beam Operation Workshop June 2014.
Post ACCOR until LS2: End of Life for CMW products CO3 meeting, 25th June 2015 Wojciech Sliwinski for the BE-CO Middleware team.
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Last night Lhc closed 15:00 Beam on Ti 8 /Ti2 Prepulse check synchronisation ok with LHCb /RF 17:00 Open Point 4 PC’s and RF 19:00 LBDS energy tracking.
Technical Stop feed-down P.Charrue on behalf of the BE Controls Group 5th September 2011P.Charrue - 8h30 meeting1.
V. Kain – eLTC – 7March08 1 V.Kain, S. Gysin, G. Kruk, M. Lamont, J. Netzel, A. Rey, W. Sliwinski, M. Sobczak, J. Wenninger LSA & Safety - RBAC, MCS Roled.
22/09/05CO Review: FESA IssuesJJ Gras [AB-BDI-SW] 1/18 AB-CO Review FESA  The Functionality  The Tools  The Documentation  The Support  Maintenance.
Outline of 2014/2015 plans V. Kain, M. Lamont, J. Wenninger 6/18/2013Optics Measurement and Correction Review
LS1 – View from Applications BE-CO LS1 review – 1 December 2015 Greg Kruk on behalf of the Applications section.
– Machine Controls Coordinators (MCC): team and role – Overview of renovations during LS1 – Proposal for after-LS1 Commissioning organization ACCOR PROJECT.
LBOCM. ZerlauthMarch 06 th 2012 Acknowledgements : B.Todd, C.Martin, I.Romera, E.Carlier, J.Wenninger, C.Zamantzas, S.Redaelli et al. 1v0 MPS Commissioning.
The Dashboard The Working Conditions The Common Chapters State What’s Next.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Industrial Control Engineering Session 1 Introduction  What is RADE  Technology  Palette  Tools  Template  Combined Example  How to get RADE 
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
CS section activities Industrial controls Luca Arnaudon David Glenat David Landre Slawomir Totos Ruben Lorenzo-Ortega Digital hardware John Molendijk.
Emergency dump update 2. M. Solfaroli – 23/10/2015 Goal 2 GENERAL STRATEGY Force open the BIS loop Generate an internal fault in the LBDS Scrape the beam.
MPE Workshop 14/12/2010 Post Mortem Project Status and Plans Arkadiusz Gorzawski (on behalf of the PMA team)
AB-CO Exploitation 2006 & Beyond Presented at AB/CO Review 20Sept05 C.H.Sicard (based on the work of Exploitation WG)
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
H2LC The Hitchhiker's guide to LSA Core Rule #1 Don’t panic.
LHC Beam Commissioning Meeting V. Kain & R. Alemany
A monitoring system for the beam-based feedbacks in the LHC
DRY RUNS 2015 Status and program of the Dry Runs in 2015
Bubble Chamber Schedule – 2017
Summary of first LHC logging DB meeting
Injectors BLM system: PS Ring installation at EYETS
Instrumentation for SPS 2006 restart
Middleware – ls1 progress and planning BE-CO Tc, 30th september 2013
J. Uythoven for the MPE-MI & MS Teams
Saturday 21st April 00:33 Interlock during ramp on BLM HV
eLTC - Controls Summary
What did we learn with beam in 2008
LEIR & ITE BPMs COMMISSIONING STEPS.
Distributed BI Systems
Dry Run 0 Week 13: BI test of...everything circulating beam: all fixed displays and BI applications OP directories for 2009, concentrators running Need.
LHC dry-runs (BE-BI view)
LHC BLM Software audit June 2008.
New page for summary of test status
LHC Systems Providing Post-Mortem Data
Status of the BI Work Package in the LIU-PSB frame
Monday 152 bunch operation summary
Presentation transcript:

E. Hatziangeli – LHC Beam Commissioning meeting - 3 rd March 2009

FESA Pro ver operational CMW Two areas going on in parallel: Deployment of the new directory server DS Deployment of the new RBAC features New directory server DS pro ver. RDA is 2.7 (C++ &Java) rel. Dec 2008 – This version provides support for the new DS, with transparent failover to the old service (transition ver.) – All users should have upgraded to this till end April Final pro RDA: 2.8 (C++ &Java) + RBAC 3.0 (C++) – Monday 16 th Mar End Apr: Switch off old directory service Issues: Clients using older versions should update Need two ½ day slots in the CCC schedule to test [RDA 2.8 and RBAC 3.0] CO will organize the test with Eq. Groups (FESA) and OP (applications) MCS Functional tests due to new RBAC ver=> wk 12 E. Hatziangeli - LBC - 3rd March 2009

Timing will be available for wk 14 CO dedicated testing for ½ day to Install and test the last modifications requested by OP (telegram layout) Make internal checks of the timing chain Verify the behavior of the central timing with the LHC timing application Pending Issues Energy distribution works E. Hatziangeli - LBC - 3rd March 2009

Logging & SDDS FESA changes identified RF all low level parameters BT: MK direct + XPOC: complete refactoring of FE SW organization (Verena) MUGEF migration to FESA by S. Page BI tune + beam orbit Collimators SDDS space required 40GB/day => for 10m continuous operation with all data online => 12TB close to our SLC5/64bit CPUs limits Problematic similar to LHC experiments -> IT Concentrators BLM concentrators New features requested by BI people + internal system ameliorations done – testing now and. Next: expand the set of running sums (now 8/12) and test the MDB throughput The system is working 24/7 as BI often perform test BPM concentrators No changes from 2008 version Need to test the whole chain (along with Verena's app) + verify how passing big chunks of data over in SDDS works in long period of time (Verena will trigger this) E. Hatziangeli - LBC - 3rd March 2009

PM and XPOC integration Dec 2008: proof-of-concept prototype of moving the XPOC analysis modules into the PM framework W12: ready to demo the first “real” version of the XPOC server based on the PM framework in play-back-mode with data recorded last year Start April: up-and-running operationally when the Kicker people will start pulsing again E. Hatziangeli - LBC - 3rd March 2009

HWC of the MKQA and AC dipole systems is planned in wk18-19 (just after SPS startup) Meeting this week – actions are in place (J.Uythoven our link) E. Hatziangeli - LBC - 3rd March 2009