Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct. 2014 T. Tsuboyama (KEK) 2 Oct. 2014.

Slides:



Advertisements
Similar presentations
The Intermediate Silicon Layers detector OUTLINE ISL inside CDFII Why the ISL? Conceptual Design Ladders and Spaceframe Rasnik Online Alignment System.
Advertisements

Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Summary of the SVD session 19 March 2009 T. Tsuboyama (KEK)
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
TP4-ENERSOL-TD/PV double function
H. MAINAUD DURAND on behalf of the CLIC active pre-alignement team with 3D views and data from Hubert Gerwig, Richard Rosing and Juha Kemppinen Pre-alignment.
Lab 3 - Centering. Centering; or the smart way to align centered optical elements and systems This lab will make use of concepts used in the previous.
Prepared by Mahmoud F. Elbatta Ahmad Alyazgi Amjad Alaskary Akram abo Twahina Roshdi tambora.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
IBL Mock Up IBL Mock Up MANUFACTURING 2011/04/29 François-Xavier NUIRY Maxence CURDY Andrea CATINACCIO CERN PH/DT/PO 1.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD IR Mechanics 7 th B2GM.
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
Exploring the Microscope
SVD Mechanics 21th B2GM Florian Buchsteiner (HEPHY Vienna)
1 Mechanics news from KEK S.Tanaka (KEK) SVD/PXD meeting SVD parallel session.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
1 Belle II IR 2 Shuji Tanaka KEK Joint Belle II & superB Background meeting 2012//Feb/ 8-9th 1.
Kyoto camera upgrade H. Hayano, (Y. Iwashita, K. Watanabe, Y. Kikuchi)
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Actuator 2 – Provides rotation about the roll direction. Actuator 1 – Provides rotation about the pitch direction Figure 2: The Linear Actuator model Abstract.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
The Belle II Silicon Vertex Detector Florian Buchsteiner (HEPHY Vienna)
Assembly Procedure ALICE Outer Barrel Stave 14 Module 2 Cold Plates 1 StaveMarco Kraan Paul Kuijer.
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
1 Beam pipe and VXD mockup status at KEK S.Tanaka (KEK) SVD/PXD meeting.
Lav meeting F. Raffaelli INFN – Sezione di Pisa C. Capoccia LNF, A. Cecchetti INFN – Sezione di Frascati CERN, Dec13 th, Feet friction studies. -Installation.
We have to fix the design of the flanges on the 1 st horn frame to which the target support beams are attached.
Tasks and time scale T. Tsuboyama (KEK). DSSD production Test production by Micron and SINTEF (Talk by M. Valentan) HPK decided to restart DSSD business.
SiD Vertex Detector Mechanical R&D (May Apply to Other Concepts) Bill Cooper Fermilab.
Tomelleri S.r.l. ® Copyright 2007 © ASTRONOMY AND RESEARCH July 23rd 2008 VST Meeting1.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
2010/12/14 Caltech Massimo Benettoni FDIRC FBox (almost) ready for production Box design finalized (as possible) Gives precise Fblock positioning wrt guiding.
Comments on ladder structure 5 Feb Toru Tsuboyama.
SVD assembly S.Tanaka. Outline SVD assembly work is individual with Beam pipe, heavy metal shield and PXD system. –Assembly work will be done on two assembly.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
4.4 Size of a Horizontal Boring Machine:  Conventionally, the size of a horizontal boring machine is specified by the spindle diameter in mm.  The spindle.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Integration Prototype1 BaBar Integration as a Prototype for SuperB Bill Wisniewski SuperB Workshop at LNF 6 April 2011.
SVD IR mechanics status S.Tanaka SVD mechanics session.
SVD QCG Report F.Forti. Outline Sep 09, 2015QCG Report, F.Forti2 view/Detector/SVD/SvdQCQAGrou p.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly 10 Sept C. Irmler (HEPHY Vienna) 8 th Belle II VXD Workshop OS5.905.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
Mechanics Status VXD Mechanics Meeting F.Buchsteiner (HEPHY Vienna) 07 September 2015.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
Mechanical QA of DSSD 2013/2/5 The University of Tokyo High Energy physics Aihara-lab Nobuhiro Shimizu 1.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
Four OTRs for ATF2 OTR History Current OTR setup New OTR design.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
BM&N STS ladders assembly in VLHEP
Florian Buchsteiner (HEPHY Vienna)
Lab 3 - Centering.
9 September 2015 VXD Mechanics Summary Markus Friedl (HEPHY Vienna)
Markus Friedl (HEPHY Vienna)
Update on the SVD construction
7th Belle II VXD Workshop, Prague
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Discussion items SVD mechanics session.
Very preliminary draft
Katsuro Nakamura Sep. 10, 2015 VXD meeting
LumiCal mechanical design, integration with LDC and laser alignment
FRESCA2 Update on the dipole design and new calculations
Comments to the SVD4 structure
Presentation transcript:

Ladder Mount R&D T. Tsuboyama (KEK) 2 Oct T. Tsuboyama (KEK) 2 Oct. 2014

The design concept The ladder mount table is designed and prepared by KEK engineers who produced the SVD1/SVD2 ladder mount system. A web page is prepared. – The SVD support system (end flanges, CFRP cones and end rings) are fixed to a sold bar ( ∅ 50mm stainless steel). The bar is supported by bearing pillow boxes. The angle of the SVD support is fixed using an index plate. The ladders are mounted to end rings using a mechanical arm. 2 Ottobre 2014Ladder Mount Procedure2

The design concept The SVD structure and ladders will be handled with hands not by motors. The SVD structure is supported with a bar and rotated by hands and angle is fixed with an index plate. The ladder mount arm is operated with hands. Ladder mount arm mechanism just keeps the weight of the ladder. The most dangerous step: pushing Koeshi pins into the end-ring precision holes, will be done carefully. Sato san is still busy in ladder assembly and we should wait some while. 2 Ottobre 2014Ladder Mount Procedure3

The ladder mount table Bearing rail Linear rail SVD Microscope Rotary encoder Ladder mount arm Index plate (hidden in this view) 2 Ottobre 2014 S. Koike Ladder Mount Procedure4

The ladder mount table Longitudinal movement Focus Height CCD camera 2 Ottobre 2014Ladder Mount Procedure5

Measurement Functionality The Belle SVD1 and SVD2 had simpler mechanics and the precision of SVD was guaranteed with the parts machining. In Belle2 SVD, the dimension is larger and the structure is complex. – We had to compromise the mechanics precision. – Instead we measure the structure shape and the position of DSSD sensors on the ladder mount stage. A ladder mount table with Measurement Functionality is designed by S. Koike. 2 Ottobre 2014Ladder Mount Procedure6

Measurement target The DSSD sensors HPK and Micron) have four alignment marks on four corners The ORIGAMI and Airex sheet have apertures to observe the alignment marks directly. 2 Ottobre 2014Ladder Mount Procedure7

The survey of the linear guide The straightness of the long rail determines the total precision of this system. The measurement was done using an auto level and a theodolite. 2 Ottobre 2014Ladder Mount Procedure8

Result The rail is curved about 100 μm in horizontal at the center. I found it is not easy to correct the shape of rails. The corrections should be applied in the measurement data. Displacement in the vertical direction Displacement in the Horizontal direction 2 Ottobre 2014Ladder Mount Procedure9

The support bar and the bearing The SVD support bar should be set to the center of the rotation axis. The surface was measured using a dial gauge. Axis Adjuster screws Dial Gauge Connection bar 2 Ottobre 2014 The connection ring for the end flanges. Ladder Mount Procedure10

The axis adjustment capability I found the axis is set well and circularity of ±30 μm is observed. It means, the axis can be adjusted precisely enough. 2 Ottobre 2014Ladder Mount Procedure11

Measurement details Principle: – Stepping motors are only used in the measurement system for fine pitch movement. Motor drivers Longitudinal (10um) Focusing (2um) Height (1um) Position measurement Longitudinal Focusing Height Rotation angle Focus detection CCD video camera Brightness control 2 Ottobre 2014Ladder Mount Procedure12

The CCD camera The camera / lens has a high resolution. Lighting is done through the object lens. The same DSSD is seen from different angle. When the DSSD is tilted, the roughness of the surface is emphasized. Barrel sensor (camera is normal position) Slant Sensor (camera is in tilted position) 2 Ottobre 2014Ladder Mount Procedure13

Quantify the focus point Calculation of roughness. R is small when the focus is poor: the neighboring pixels have similar brightness. R is large if focus is sharp: the neighboring pixels have different brightness. 2 Ottobre 2014Ladder Mount Procedure14

Examples A part of the slant DSSD is observed. closer to camera Focus point Farther Date time motor position X, Y, Z Date readout Height Focus Longi. Angle Roughness value calculated in the square region 2 Ottobre 2014Ladder Mount Procedure15

Examples A part of the slant DSSD is observed. closer to cameraFocus pointFarther Roughness value calculated in the square region Date time motor position X, Y, Z Date readout Height Focus Longi. Angle 2 Ottobre 2014Ladder Mount Procedure16

We can tell the position of focus quantitatively to 1-2 μm precision. Reproducibility: better than our eyes. 2 Ottobre 2014Ladder Mount Procedure17

Ladder mount practice 2 Ottobre 2014 The end ring mock up Ladder mount arm (linear rail) X-Y-Z adjuster Ladder grabbing tool Ladder Mount Procedure18

Ladder mount practice We expect Sato san design the ladder mount mechanism, however, he is still busy in the ladder assembly. The design of the ladder mount arm is not done yet. I did a ladder mount practice using the ladder grabbing tool made in HEPHY. The grabbing tool is fixed to the ladder mount arm using clamps. I first tried mounting a layer 5 ladder. Then tested L4. 2 Ottobre 2014Ladder Mount Procedure19

Layer 5 Ladder mount with cables is possible 2 Ottobre 2014Ladder Mount Procedure20

Layer 5 a 2 Ottobre 2014Ladder Mount Procedure21

Layer 5 The layer 5 backward connector block at the final position. 2 Ottobre 2014Ladder Mount Procedure22

Layer 4 I was told that Layer 5 is trivial and Layer 4 seems to be impossible and I think more about Layer4. The Layer 4 ladder mounting is difficult because of the tight space for the cable connectors. I was told that Layer 5 is trivial and Layer 4 seems to be impossible and I think more about Layer4. The Layer 4 ladder mounting is difficult because of the tight space for the cable connectors. 2 Ottobre 2014Ladder Mount Procedure23

Layer 4 I glued receptacles to the hybrid of Layer 4 modk up ladder and connected the cables. The hybrid cables interfere with the end ring layer 5. 2 Ottobre 2014Ladder Mount Procedure24

Layer 4 Fortunately, the real situation is better because the picture in the last page was taken with “dummy cables”. The real hybrid cables are quite flexible. 2 Ottobre 2014Ladder Mount Procedure25

Layer 4 Even four cables are stacked, the test ladder mount with four real hybrid cables was easily done. 2 Ottobre 2014Ladder Mount Procedure26

Layer 4 Test ladder mount with four real hybrid cables 2 Ottobre 2014Ladder Mount Procedure27

Layer 4 The ladder did not reach to the final position. The forward ladder grabbing tool hit the Cone (dummy) before the mount blocks are completely pushed to the end ring. 2 Ottobre 2014Ladder Mount Procedure28

Towards the start of ladder mount Determination of VXD construction strategy: – Compatibility of the SVD system in with the VXD structure. Completion of ladder mount tools – ladder mount stage production – Ladder grabbing tool – Related Software and manual – Verification of the functionality Completion of the support structure. – Procurement of end rings – Gluing end flange, CFRP and end ring and measurement – The methods of assembly are not confirmed. Iteration may be necessary. 2 Ottobre 2014Ladder Mount Procedure29

Towards the start of ladder mount Lots of undetermined items should be decided – CO2 tube treatments: Installation to Origami, strain relief… – Electric test and necessary hardware APVDAQ or FADC Power supply FOS fiber verification after mounting – CO2 cooling facility – Resource share with ladder assembly sites Especially Human resource – ….. 2 Ottobre 2014Ladder Mount Procedure30

Summary The ladder mount table production is in progress. Linear rail is measured. There is ~100 μm displacement in horizontal. To be confirmed. Position measurement can be done down to a few μm. Ladder arm and grabbing mechanism has not been designed. Many thanks. The ladder grabbing arm prepared by HEPHY was fixed to the ladder mount arm and test ladder mount is tried. It looks we can connect cables before we start the ladder mount in all layers, thanks to the flexibility of the cable. Ladder mount in 2015 Summer requires lots of remaining issues solved and completed before 2015 B2GM. 2 Ottobre 2014Ladder Mount Procedure31