Transportation System Comments Santolina Level ‘A’ Master Plan.

Slides:



Advertisements
Similar presentations
Public Involvement Open Houses Develop Problem Statement Review plans, policies, regulations, and standards Identify and assess Alternate Mobility.
Advertisements

Project Description and Needs Lincoln Way Widening Addition of a center-turn lane and safety improvements to the grade and horizontal alignment. Needs.
January 23, El Dorado County Development Projects 1.Carson Creek (D1) 2. Blackstone/Valley View (D2) 3. El Dorado Hills Business Park (D3) 4. Clarksville.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Route 29 Western Bypass: Background and Timeline May 13, 2014 John Lynch, P.E. Culpeper District Administrator.
1 Support Graphics for Traffic and Circulation Princeton Junction Redevelopment Area Township of West Windsor September 8, 2008 Urbitran | DMJM Harris.
Tax Increment Financing Town Center Project Midwest City, OK.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Background Why Plan For Transportation? Facts You Should Know Expectations Projects and Costs Conclusions/ Next Steps.
New I-65 Interchange at Worthsville Road Welcome!.
Newport South Beach Peninsula Refinement Plan. Newport South Beach Peninsula Located on the south side of the mouth of the Yaquina Bay and the crossing.
US Highway 17 (Center Street) Sidewalk Feasibility Study Town of Pierson, Florida.
South Coast Rail Project February 28, 2014 Stoughton Town Hall.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
Transportation Border Working Group Montreal October 22 and 23, 2013 CBSA Project Update.
Board of County Commissioners November 8, Recommendation Project Background and Location Traffic Analysis Comparison of Alternatives Public Meeting.
Highway Functional Classification PEAR Workshop September 2009 Spencer Stevens, Planning Office Joe Hausman, Office of Highway Information Ed Christopher,
 FRLP Proposed Boundary Line Adjustment: Confluence Virginia What life have you if you have not life together? There is no life.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT City Council June 3, 2014.
The Roads Ahead Leroy D. Alloway, Director Community Development.
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
1 Item 11: Review of Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Chapter 1: Highway Functions
Alachua County Future Traffic Circulation Corridors Map Project July 10 th, 2007.
Presentation to ***(group) on ***(date) 1.  Cities - 11  Highway districts – 3  Ada and Canyon Counties  School districts – 2  Valley Regional Transit.
Community Development Department ISLAND WALK MASTER PLANNED DEVELOPMENT APPLICATION #2648.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
TRANSPORT The Cambridge Futures response to the Draft Structure Plan Dr Tony Hargreaves, Cambridge Futures.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Neighborhood Commercial on 5601 North Pine Hills Road Small Scale Land Use Amendment Application for.
A Proposed I-5 Loop Design Option Riverfront For People Portland, Oregon January 16, 2004 Riverfront For People Portland, Oregon January 16, 2004.
Highway Functional Classification Chapter 16 Dr. TALEB M. AL-ROUSAN.
RPS Modeling Results Presentation to RPS Policy Committee Brian Gregor Transportation Planning Analysis Unit June 6,
DRAFT What If… The Washington Region Grew Differently? Public Forum on Alternative Transportation and Land-Use Scenarios National Capital Region.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
Freeway Congestion In The Washington Region Presentation to National Capital Region Transportation Planning Board February 15, 2006 Item # 9.
Community Development Department GRAND HAVEN DEVELOPMENT OF REGIONAL IMPACT Planning & Land Development Regulation Board May 21, 2014.
I-70 Second Tier Environmental Studies SIU #7 Presentation to TEAM September 16, 2004.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) NOVEMBER 27, 2012 Craig Coffey, County Administrator 1.
Sustainable Transportation Design Project: Proposed Changes to Belmont/Morrison Couplet By: Bryan Blanc, Marisa DeMull, Andy Kading.
Park Lane ZOM Location Map. Park Lane ZOM Aerial.
Traffic Flow Parameters Surface Street Application.
Comprehensive Plan Planning for the Future of East Bethel City Council / Planning and Zoning Commission Public Hearing – March 8, 2006.
8/7/02 Dane County Vandewalle & Associates Strand Associates William O’Connor Roadway Concept Select Link Traffic Modeling August 7, 2002.
The Fargo/Moorhead Area Interstate Operations Study Opportunities and Planned Activities Presentation for the Mn/DOT Travel Demand Modeling Coordinating.
Policy for New/Modified Access to Controlled Access Facilities.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
Community Development Department COUNTRY CLUB HARBOR SINGLE FAMILY RESIDENTIAL-2 AND PARKS & GREENWAYS ZONING DISTRICTS REZONING APPLICATION #2511.
Planning Commission Public Hearing: SUB Proposed 6-lot Subdivision at Bland Circle December 2, 2015.
General Tab Project, Cost Schedule, and Work Limits Roadway Character
Transportation Projects City Council Workshop May 14, 2013.
MED SR 18 Corridor Project MED PID October 13, 2015.
VOLUSIA TRANSPORTATION PLANNING ORGANIZATION (TPO) OCTOBER 23, 2012 Craig Coffey, County Administrator 1.
East-West Corridor Connectivity Study – Study Recommendations November 17, 2009.
Prepared by: Alex Fisch Planning Services Division.
Secondary & Cumulative Effects Analysis Training Program Module 1: How to Determine Which Resources Should be Considered in a SCEA How to identify what.
1 Gables Gateway. 2 1.Comprehensive Plan Text Amendment 2.Comprehensive Plan Map Amendment 3.Zoning Code Text Amendment 4.Change in Zoning 5.MXD3 Mixed.
County Road 19(Manning Road) & County Road 22 Improvements Environmental Study/ Preliminary Design Report November 2008.
1 CPA Request to expand the Oaks Mall Activity Center and change land use to Mixed Use 87 acres 8000 Block of W Newberry Rd.
Thoroughfare Plan Update
City of New Braunfels Regional Transportation Planning Garry Ford, P.E., PTOE City Engineer June 13, 2017.
32 Transportation Midway City 2016 General Plan
Presentation to NZTA /AT
Acton Extension Update
FRLP Proposed Boundary Line Adjustment: Confluence Virginia
115-Unit Mixed-Use Project (711 E
Dakota County Board Of Commissioners August 6, 2019
Presentation transcript:

Transportation System Comments Santolina Level ‘A’ Master Plan

Level A Transportation Master Plan – Two Phases Total Area – Approximately 13,800 acres 2035 Proposed, ~ 21 years from now – Population – 39,405 – 16,019 DU’s, 25,508 jobs J/H ratio = 1.59 – Land Area – 4409 acres plus 3134 acres open space , full build ~ years from now – Population – 93,309 – 37,930 DU’s, 75,006 jobs J/H ratio = 1.98 – Land Area – 10,628 acres plus 3134 acres open space

Shelly Rd. Atrisco Vista PdV Dennis Chavez 118th St. Gibson Gun Club

Town Center Urban Center Shelly Rd. PdV 118 th St. Dennis Chavez Gibson Atrisco Vista Gun Club

Phasing 2035 Travel Demand Model prepared by BHI for WALH based on projected acres developed, population, DU’s, and jobs. If any of these parameters change over the next 21 years, subsequent re-modeling will be needed to accurately reflect travel demands. This must occur during the Level ‘B’ submittal process if there is substantial deviation from the Level ‘A’ plan.

Phasing (cont.) Prior to the 2035 horizon key changes may occur in transportation system - conversion of two-way frontage along I-40 to one-way, and Shelly Rd. interchange/overpass Analysis of key components of the Santolina Transportation System at each Level ‘B’ submittal must occur to keep abreast of any changes in the initial modeling projections.

Layout Urban Center – Shouldn’t be separated by major arterials – Two major arterials split Urban Center into four quadrants – Dennis Chavez/Atrisco Vista intersection may become grade separated interchange -- not the type of roadway connection that adds to the character of an Urban Center. PdN/Coors - SPUI

Layout (cont.) Two lane frontage road (cont.) – Additional east west access added to serve commercial/industrial/residential access for areas just south of I-40 (Town Center, Business Park, and possibly Industrial Tracts).

Layout (cont.) Properties along frontage road, some parcels are part of Santolina and some owned by others, should be accessed via a roadway network located to the south. Language should be added to the Plan to utilize the existing 60 foot easements for connection to the south roadway network to reduce the number of driveways along the frontage road and new southerly arterial.

Layout (cont.) NMDOT – Does not support the use of the frontage road for primary access to the development. – No plans are in place for conversion of two-way frontage on both sides of I-40 to one-way. – No plans are in place for an interchange or overpass at Shelly Road. – Dennis Chavez/Paseo del Volcan ‘Loop’ alignment may not meet regional transportation network objectives.

118 th St. Interchange w/ I-40 Assumed in Santolina transportation model and in 2035 MTP Footprint on the north side of I-40 for this interchange is not shown in Westland Sector Plan adopted by the COA in October, 2012 Need clarification on this, 118 th St. Interchange included in the Santolina Transportation Analysis

Access Management The developer has agreed to include an Access Management Plan similar to the NMDOT’s criteria to maintain and assure adequate access spacing along the major roadways within Santolina. Initial 2 lane roadways, when widened to 4/6 lane facilities, some businesses will lose their full access. Include language addressing this in access management section of plan.

Rights-of-Way Complete Streets, Figure 4, page 7 – Principal Arterial w/ Transit – 186’ ROW – Principal Arterial – 158’ ROW – Minor Arterial – 136’ ROW – Collectors – Level B plans – Grade Separated Interchange or areas near escarpment may need more ROW ROW dedication – at Level C: subdivision, site development plan

BHI Model of 2035 Traffic Flow Levels of Congestion Morning Peak J/H ratio of 1.59

BHI Model of 2035 Traffic Flow Levels of Congestion J/H ratio of 1.59 PM Peak

BHI

Funding Initial 2 lane roadways will be constructed by the developer, and “… additional lanes, based on actual demand … will be eligible for … local gov’t capital programming, ….” (Santolina Level ‘A’ Transportation Master Plan, p. 8) Financial responsibilities outlined in the Development Agreement ~$195 million in capital project needs for roads remain unfunded County-wide.

Changes to Level ‘A’ Transportation Master Plan Discussed with Proposed Resolution  Additional east-west arterial, south of frontage road  Illustrative concept graphic depicting roadway network that preserves adequate access spacing along major roadways  Jobs to housing ratio status with each level ‘B’ submittal  Coordination will occur with Rio Metro/ABQ Ride to ensure future needs of transit are considered early in development process

Changes to Level ‘A’ Transportation Master Plan Discussed with Proposed Resolution (cont.)  Clarify plans for 118 th St. interchange, conflicting information, need confirmation that interchange is planned at this location or where it is planned  Roadway widening and loss of full access for affected businesses

Changes to Level ‘A’ Transportation Master Plan (cont.) Discussed but no proposed resolution  Dennis Chavez, Paseo del Volcan alignment – is this consistent with regional transportation model? As growth patterns develop, there is a need to accommodate connectivity to the west of Shelly Road and to accommodate connectivity to the south of the Gun Club alignment  Urban Center Layout – may lead to development as four, separate and independent Urban Centers  Potential Atrisco Vista/Dennis Chavez interchange

Changes to Level ‘A’ Transportation Master Plan (cont.) Discussed but no proposed resolution (cont.)  Funding responsibilities in the Level ‘A’ Transportation Plan need to correspond to those items in the Development Agreement.