Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS.

Slides:



Advertisements
Similar presentations
Work Orders Throughout this slide show there will be hyperlinks (highlighted in blue). Follow the hyperlinks to navigate to the specified Topic or Figure.
Advertisements

CREATING A PAYMENT REQUEST FOR VENDOR IN SYSTEM
MY NCBI (module 4.5).
Empowering the Education Community to Improve Student Performance through the Intelligent Use of Practical Data EdGate Training: Part 3 - SchoolNotes.
AIMSweb Progress Monitor Online User Training
GALVESTON COUNTY, TX P-CARD TRAINING GALVESTON COUNTY.
PantherSoft Financials Smart Internal Billing. Agenda  Benefits  Security and User Roles  Definitions  Workflow  Defining/Modifying Items  Creating.
EvalS Application User Guide version September 17, 2011.
A student instruction guide to using. Why PASS-PORT? Speed User Friendly Cost Effective.
JJCO Online System MANUAL for Associate Editors. Table of Contents 1.Log In 2.Main Menu 3.Associate Editor Dashboard 4.Checking MS 5.Reviewer Selection.
WELCOME TO SKYWARD EMPLOYEE ACCESS Step 1
Exit Microsoft Outlook Skills Using Categories for Sorting, Filtering and Creating Group Oklahoma Department of Corrections Training Administration.
My Schedule Planner My Schedule Planner is a web-based schedule planner for use by students and advisors. It takes the guess work out of planning schedules.
How to Use This Punch-out Training Guide
ADP E-Time Basic User Tutorial Non-Webclocking Employee
Inventory Throughout this slide show there will be hyperlinks (highlighted in blue) follow the hyperlinks to navigate to the specified Topic or Figure.
Processing Department Time Entry Human Resources.
EProcurement Job Aid Requisitions & Receipts. Table of Contents Creating a Requisition Define Requisition Vendor.
Supplier Invoicing North America
Office 2003 Advanced Concepts and Techniques M i c r o s o f t Outlook Project 2 Scheduling Management and Instant Messaging Using Outlook.
Blackbaud Web Purchasing Training Session 1. Agenda What is Blackbaud Web Purchasing? How to login to Blackbaud Web Purchasing Create a purchase requisition.
Toll Free: Project Manager Tutorial.
The Registration Experience Student Registration via Self-Service.
Create / Edit Competence Assessment Role: Employee.
101 P C O L S Recommended Role: New and Existing Resource Managers How to Redeem a Resource Manager Token in AIM I N T E R A C T I V E T U T O R I A L.
Using the Supplier Relationship Management (SRM) CDW-G Punch-out Catalog.
 First time student activates their google account, they need to go to an internet browser and go to  drive.google.com/a/students.macon.k12.nc.usdrive.google.com/a/students.macon.k12.nc.us.
Slide 1 of 19 Welcome to GSA’s Vendor and Customer Self Service (VCSS) course Section 7: Correspondence Navigation This presentation is compliant with.
Blackbaud Web Purchasing Training Session 1. Agenda What is Blackbaud Web Purchasing? How to login to Blackbaud Web Purchasing Create a purchase requisition.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. WORD 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 22 Macros.
Washington Campus Compact New Time Log Database Note to users: You should use Internet Explorer to use this database. In other programs (i.e. Firefox)
Introduction to the WebBoard Terry Dennis. The WebBoard - Our Connection The WebBoard URL is
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
1.Getting Started 2.Modifying Design 3.Page 4.News 5.Events 6.Photo Gallery 7.Newsletter Index Training 15 th Mar., 2011.
1 Office 2007 & AppleOne Timecard Training March 19, 2009.
State of Kansas Travel Authorizations Statewide Management, Accounting and Reporting Tool Entering a Travel Authorization Navigation: Employee Self Service.
System for Administration, Training, and Educational Resources for NASA SATERN Overview for Users December 2009.
Surplus Forum March 31 – 9 to 11 am Agenda – Frequently Asked Questions – Updates, Rules, and Policies – Billing Report – Pickups and Deliveries – Disposal.
Henrico County Public Schools School-Home Communication Tool
Page 1 Non-Payroll Cost Transfer Enhancements Last update January 24, 2008 What are the some of the new enhancements of the Non-Payroll Cost Transfer?
NEW FOR 2009 Faster, Easier, Friendlier. Before you start Any student, staff, or faculty member can file an accident/incident report. Accident reporting.
MAXIMO Creating Workorders 12/1/06
SATERN for Supervisors Updated: December Session Objectives At the end of the session, participants will be able to:  Describe SATERN  Log in.
Confidential Web Ordering Overview. Confidential LOG ON:   Enter your login name &
Online Catalog Tutorial. Introduction Welcome to the Online Catalog Tutorial. This is the place to find answers to all of your online shopping questions.
January 2006Colby College ITS Setting Up Course Pages.
CPS-Student Response System Dottie Betts ITRT June 2009.
START Electronic Field Book Goal Installing Field Book Program on the PDA.
3M Partners and Suppliers Click to edit Master title style USER GUIDE Supplier eInvoicing USER GUIDE The 3M beX environment: Day-to-day use.
Invoices and Service Invoices Training Presentation for Raytheon Supply Chain Platform (RSCP) April 2016.
© 2008 MediServe, Inc. All Rights Reserved.MediServe Confidential 1 Guided Practice Exercises Systems Training Charting October 2009.
ACCESSING AND UTILIZING THE PROVIDER PORTAL MEDICAL AUTHORIZATION UNIT 1.
Invoices Training Presentation for Supply Chain Platform: BAE Systems May 2015.
Melissa Wagner & Jaime Patel
PantherSoft Financials Smart Internal Billing
To add a new requisition, enter an 'a' here
How to Redeem a Resource Manager Token in AIM
Hiring Center An Inside Look… Your inside look at the hiring center.
Parts.cat.com Client training 2016.
Absence Management (formerly AESOP) Training for Staff Members
Applying for a contractor’s license online
INfOR Work Request and Work Order Quick Entry Process 12/01/16
ePAR - Job Attribute Change
Applying for a contractor’s license online
This presentation document has been prepared by Vault Intelligence Limited (“Vault") and is intended for off line demonstration, presentation and educational.
Request Form You gain access to the Request Form from your intranet set-up by your IT dept. Or the internet via either our desktop launcher icon. Or a.
Approving Time in Kronos Manager/Supervisor Reference Guide
To modify a requisition, enter the requisition number and click OK or press enter. You can enter sign to return to the last requisition you were.
Presentation transcript:

Create a New Work Order Corrective Maintenance Created by: Tony Bertram-Maxadmin-CHS

From the Start Center, click on New Work Order icon in the Quick Insert application

The application open’s with a Work Order number already inserted into the box. Type in a short description of the work to be performed

Click on the Long Description box to enter a full text edit of the work to be performed or a full explanation of the work needed to be done

2. Enter only information that can help the worker know what possible tools and materials he/she may need to carry to the work as an initial evaluation of what is to be done 1. Provide as much info as possible 3. Click OK when finished entering description

Click on the detailed menu arrow by Location WAPPR

On any detailed menu, select the option that you want to search by. Click on Select Value

1. The Select Value box opens and from here we either use the browse next/previous page arrows 2. Or type in a location and press enter on the keyboard

1. Select from the list or browse using next/previous page 2. Select TK-91

Select Menu arrow Asset

1. Select Value icon

1. Only the first 500 assets can be found using the browse next page arrows 2. Type in a description i.e.. TANK TANK

Use the next page arrow to scroll through assets

Select the Asset number

Select Classification menu arrow and Go To Classifications

Type in the item to classify

If this is the item you wanted to classify the WO to select return with value, if not click on List and do another item search

1. Select Work Type

Select code for Work Type

Select GL Account search icon

Type in a description or use the next page scroll arrows

Select the Zone that the work is being performed for

Select the appropriate charge to

Select the account

Select OK

Type in the department, Zone/Facility and Unit/Bldg. Select the search icon for Failure Class

Select the Failure Class of the Asset, use scroll next or type in a description

Select Code once found

Enter the Maintenance Planner’s Name

1. Check the boxes as appropriate for the WO to track 2. Select Menu for Job Plan and select Go To Job Plans

Select All Records or select Bookmarks All records displayed Choose the plan that is appropriate

If this is a plan you want to use for the work, select return with value

Select Menu for Safety Plan

Select Go To Safety Plans

Click on the search, then all records

If the plan you want to use is here select it. If not, you can create a safety plan in the Plans Tab on the Work Order Once selected, the plan info will show and select return with value to place the plan on the work order

Select Priority code, Priority Justification and Risk Assessment Use select value

Select Target Start Date

Set the Target Start Date, for training set to September 1 st at 08:00 Use the next month arrow and set time to 08:00

Now do the same for the Target Finish. Maximo requires these to be set before the WO can be saved

Set month to September using the next month arrow Set time to 4:30 PM

1. Set the duration of work, the time in hours to complete the task 2. If this wo is from a service request enter the request number 3. Select if wo can be interrupted

Select who report the work

1. Click select value 2. This select value screen will appear. Select the person who reported the work

1. Select menu 2. Select Value

Identifies for whom this work order has been created. For example, if someone did not have access to a computer, another user could create the work order on behalf of that person.

Select Supervisor

Select the Supervisor

Select Lead/Craft

Select Value

Type in persons name or scroll menu to next page

Select Value

Click on the Plans Tab

One task has already been inserted from the Plans that were selected on the work order screen. If another task needs to be created, click on the new row button and input the required information.

1. Type in a description of the task Repair crack in Coil 2. Click on the long description box and enter a more detailed description of the work

Click OK when finished

Enter estimated duration of work

Select any value for inspector, MP, MV and date that is needed

Select Value

Use the next page arrows to scroll or type in a persons name and press enter on keyboard

Click on the persons name to add them to the task

Click on the Labor Tab

1. One Craft has already been added from the Plan selected for the work order 2. To Add another Labor, click on new row and select the required information

Use the select menu arrows to select the right info

Select Craft

Once all information is entered, select the Materials Tab

Here a circuit Breaker Lockout kit has already been selected, to add other materials select new row A new row has already been opened, use the select menus to find and enter the materials needed

Recommend select go to item master

Several ways to search for materials, simplest is to type in a description on the item and press enter Gloves Below is the search results, click on an item to open it’s location

Once you have verified that this is the material or item you wanted, click on return with value

Fill in Quantity and Storeroom

Go To Storerooms

Select the arrow by search and select all records Tip: Once you find a storeroom that you will use frequently, bookmark it for future use

Select the storeroom

Click return with value

1. If a select person is to be issued the materials, check direct issue and Issue to 2. Click on Services Tab

1. Clicking on Select Standard Services will open this window, usually not used in work order creation 3. Click the Tools Tab 2. Click cancel

Click on New Row to add tools needed

1. Select the task that the tool is needed for

Select which task the tool is for

Select Value

Select the tool that is required

1. You may also want to use the Go To Tools option 2. The Tools record opens and from here select search and all records to see a list of available tools

1. In this training presentation there is only the one tool listed, in the production environment there should be more 2. Click on the tool to open the tool description 3. Once you have verified that this is the correct tool needed for the work, click on return with value

1. Check the quantity and enter how many of this tool will be needed. Some require more than one of the same tool 2. For some tools you may needed to track the hours that the tool is in use. This would be for tools requiring maintenance on an hour meter and Maximo will track this items hours and keep the record up- to-date 3. If more tools are needed for this task or another task, click on new row to search for the tools

Click on the related records tab

1. Select any related work orders or tickets that are associated with this work 2. Click on Actuals Tab

3. Click on Safety Plan Tab 1. The actuals tab is used for keeping track of the actual resources that were used for this work. Labor hours, Materials, Services (could have required any outside contractor that was not initially planned for) and Tools 2. When completing the work order, be sure to fill in the information here so that Maximo can track the cost of this work

Click New Row under Hazards and Precautions

1. Select any Hazard, Hazardous Materials and Lock Out/Tag Out that may be related to the work assignment. Use the tabs to move through the Safety Plan 2. Click on select menu

Select Value

Select the Hazard For training there is only the one hazard listed, in production there are more to choose from

Click on the Hazardous Materials Tab

To add a hazardous material click on new row 1. Use the select menus to add a hazardous material to the work order and describe each. 2. Search for the type of hazard

Once all hazardous materials have been identified, click on the Lock Out/Tag Out Tab Lock Out and Tag Out of equipment is not just a requirement, it is the core value of any safety program. Click on new row to add requirements for this work.

Here we list hazard that requires lock out or tag out and we use the select menu arrows to select the hazards

1. You use the same method to select the values as before, do this for each hazard 2. List the Tag Outs for the Hazard above, click new row

Just as before use the select value arrows to select the values for tagging out items

After selecting all Hazards, Tag Outs and Lock Outs, Click on the Log Tab

1. Here we list notes for the work that is being done, notes maybe to notify others of some problem, a record that needs to be completed, a tool requirement that may not be in the system or any other note that may be of interest to future work on this equipment

Click on the Communications Tab

1. You use the Create Communication action to send messages about a record via . When you create a communication, you can use a communication template created in the Communication Templates application, or you can create a free-form communication. You can view any inbound or outbound communications associated with a record in the Communications Log on the Log tab. For more information about communication templates, refer to the Communication Templates in help. 2. Click Failure Reporting Tab

1. You use the Failure Reporting tab to record and view asset and location problems, causes, and remedies. This data enables you to identify trends and isolate probable causes of breakdowns. You can enter remarks in the Remarks box that will aid in future resolutions of problems associated with the root cause of this failure 2. To change the failure code you must first delete the failure code from the work order page and then select a new code here. 3. After going through each step in creating this work order and proving the information required for the system to track the progress, labor, materials and cost, clickk on the Save icon to save the work order.

The record has now been saved, if you have approval authority, approve the work

1. Click on the select arrow 2. Click on Approved

Approving the work on any section of the work order will also approve the task created for the work

1. All work info entered and approved. The work is now pending scheduling by the work scheduler. At any point in creating a work order and you get stuck on something, looking for