Option 2b Template Example Phillip Grissom – Southern Nuclear Based on Vogtle (more or less) 2012-10-19.

Slides:



Advertisements
Similar presentations
Westinghouse Owners Group Risk-Informed Repair and Replacement – Implementation of 10 CFR Twelfth International Conference on Nuclear Engineering.
Advertisements

US CMS DOE/NSF Review: May 8-10, US CMS Cost & Schedule Mark Reichanadter US CMS Project Engineer DOE/NSF Review 8 May 2001.
Problem Accurately monitor releases from the RWST (for fuel failure conditions) Why?
San Onofre Unit-3 RFO-15 Rejectable PT indication in an Alloy-52 CEDM overlay repair weld 1.
1 Component Design Basis Inspection (CDBI) Graydon Strong 6/17/14.
Vermont Yankee Presentation to VSNAP 7/17/13 VY/Entergy Fukushima Response Update Bernard Buteau.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Don Wells Hess Corporation
1.6 FIRE MODELING IN SUPPORT OF FIRE PRA An Educational Program to Improve the Level of Teaching Risk-Informed, Performance- based Fire Protection Engineering.
Project Management Process. Project Complexity means that: a team of people are needed to supply expertise the work needs to be broken into manageable.
Calculate Point of Indifference Between Two Cost Scenarios
1 Generic Safety Issue (GSI) 191 Pressurized Water Reactor (PWR) Sump Performance Presented by: Donnie Harrison Office of Nuclear Reactor Regulation Presented.
Operated by Los Alamos National Security, LLC for the U.S. Department of Energy’s NNSA Risk-Informed GSI-191 Slide 1 South Texas Project Elements of Risk.
Debris Effects in Long-Term Post-LOCA PWR Cooling
Date (Arial 16pt) Title of the event – (Arial 28pt bold) Subtitle for event – (Arial 28pt) Internal models Gareth Truran Head of Department, London Markets.
MPMP Power Supply 1 Nuclear Power Update for The Society of American Military Engineers September 15, 2010.
GSI-191 Status and Lessons Learned Presented by: Donnie Harrison Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Presented at:
PWR Owners Group Post-Accident Chemical Effects Work NEI Chemistry Meeting, January 26, 2012.
The New Reactor Program Process, Progress, and Plans (And a Peek Over the Horizon) December 2, 2009 David B. Matthews, Director Division of New Reactor.
Westinghouse Perspective on New Reactor Sumps
November, 2000 Slide 1 Project Services Division RISK MANAGEMENT Project Services Division Presentation By: Adam Malkhassian November, 2000.
A Proposed Risk Management Regulatory Framework Commissioner George Apostolakis Presented at the Organization of Agreement States 2012 Annual Meeting Milwaukee,
Risk-Informed In- Service Inspection (RI-ISI) Ching Guey.
GSI-191 RESOLUTION OPTIONS
IS 556 Enterprise Project Management 1IS 556 -Spring 2008 Lecture 2 Apr 7, 2008 //48.
CHLE Update STP October Team Lead Meeting 11/29/2012 Janet Leavitt, Ph.D. 1.
Project Life Cycle.
1 MTAC eVS®/PTS User Group Thursday November 10, 2011.
Waste Isolation Pilot Plant Program Status National Governors’ Association Meeting May 17, 2002 Alton D. Harris, III.
NARUC SUMMER COMMITTEE MEETINGS Committee on Water Agenda California Regulatory Initiatives Case History – California American Water B. Kent Turner – President.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
NWPP Multiple-Award Technical Support Contract (eff. 08/2005) Unit 9 Unit 9 “Modifying the Task Order”
New Reactor Licensing R. William Borchardt Director, Office of New Reactors US NRC February 19, 2008.
API 17N Subsea Production System Reliability and Technical Risk Management Don Wells Hess Corporation.
Proposed ASB Actuarial Standard of Practice on Statements of Actuarial Opinion Regarding Property/Casualty Loss and Loss Adjustment Expense Reserves Status.
API 17N Subsea Production System Reliability, Integrity, and Technical Risk Management Don Wells Hess Corporation.
"... To design the control system that effectively matches the plant requires an understanding of the plant rivaling that of the plant's designers, operators,
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Probabilistic Risk Assessment Program Workshop Information.
Project Management Requirements Prof. Ralph Locurcio, PE Dr. Troy Nguyen, PE.
Don Resio, Senior Scientist, US Army ERDC-CHL Data Needs for Coastal Storm Surge Estimation IbTrACS Meeting Honolulu, HI April 12, 2011.
LTP and FSS Plan Project Status Overview Presented by Bill Barley September 28, 2015.
Next Generation Nuclear Plant Licensing Strategy William D. Reckley NRC/NRO/ARP March 12, 2009.
ECCS Operability Determination Jim Andrachek Fellow Engineer Westinghouse Electric Company.
IAEA Training Course on Safety Assessment of NPPs to Assist Decision Making Diablo Canyon NPP Maintenance Rule Program Workshop Information IAEA Workshop.
Option 2a Template Example Phillip Grissom – Southern Nuclear Based on Farley (more or less)
Closure Option 1 GSI-191 Workshop October 18-19,2012.
Vendor Date VALU Monthly Project Review (VMPR) Project Name/IN #
Standard Design Process Overview
Workshop on Risk informed decision making on nuclear power plant safety January 2011 SNRC, Kyiv, Ukraine Benefits and limitations of RIDM by Géza.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
1 PG&E’s Humboldt Bay (HBPP) & Diablo Canyon (DCPP) Power Plants Decommissioning process and replacement power April 14, 2011 Loren Sharp.
SNC Severe Accident Management NEI Workshop 4/5/12 David Gambrell – Director, Severe Accident Management
Response to NRC Information Requests for NTTF Recommendation 9.3 Sue Perkins-Grew Director, Emergency Preparedness NEI.
Defense-in-Depth and Mitigative Measures
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
SNC/SCANA – New Build Configuration Management
South Carolina Perspective on Part 61 Proposed Revisions
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
Pressurized Water Reactor Owners Group
Plant Vogtle Units 3 and 4 Alex Thirkell.
Moving Forward From Fukushima Near-Term Task Force EP Recommendations
Bypass Testing Paul Leonard.
Adding Nuclear Power to the Grid
Timeline of Key Events B&W Safety Assessment Indicates Head Inspection Being Performed, Sources of Leaks Identified, No Other Inspections Required D-B.
Knowing When to Stop: An Examination of Methods to Minimize the False Negative Risk of Automated Abort Triggers RAM XI Training Summit October 2018 Patrick.
Pressurized Water Reactor Owners Group
PWR Sump Performance (GSI-191) Industry Workshop
RESOLUTION OF GENERIC SAFETY ISSUE 191
Risk-Informing In-Vessel Effects
RESOLUTION OF GENERIC SAFETY ISSUE 191
Presentation transcript:

Option 2b Template Example Phillip Grissom – Southern Nuclear Based on Vogtle (more or less)

Plant Information  Westinghouse 4-Loop PWR  99.97% Nukon insulation  ~ 20 ft 3 of Interam fire barrier in ZOI  120 lbs Latent Debris (2x sampled amount)  GEH Stacked Disk Strainers 765 ft 2 per each of 2 RHR trains, separate CS strainers (2)  TSP Buffer

GSI-191 Status  Strainer Head Loss and In-vessel issues remain open  Assuming Original 2007 Bypass Test (193 FA) – 111 gm/FA, very conservative but not rev’d by NRC  Previous chemical effects testing provided very promising results, but not accepted by NRC  Completed Laser scan of entire containment for insulation replacement contingency –both Units Dose = 1083 mrem for 1 unit

GSI-191 Closure Decision  Essentially 100% Nukon high fiber plant 1.Replace all insulation with RMI & implement extensive & stringent containment cleanliness program – Option 1 2.Replace most insulation with RMI, follow PWROG program, additional modification for debris bypass filter, and testing for reduced chemical effects, transport, head loss and bypass – Option 2a or 3 3.Full Risk Informed (Vogtle and STP are very similar for this issue) - Option 2b

GSI-191 Closure Decision – Option 2b  Believe we could solve deterministically for Vogtle, but NRC approval and test results have some uncertainty  Fully risk informed solution, with ample testing and analysis to get best estimate results is very promising and provides insurance for very low probability event  Anticipate re-performing plant specific transport, head loss, bypass and fuel testing for DBE conditions as well as lesser events  Planning for modification to add debris bypass filter

Key Testing Anticipated  Chemical Effects for multiple break sizes and range of important parameters  Debris bypass filter – proof of concept testing  Strainer bypass – multiple scenarios  Strainer head loss – multiple scenarios  Debris transport, head loss, strainer bypass at DBE conditions  PWROG testing for BAP with fiber, Fuel  Fuel tests with Vogtle fuel type & source term?

Key Analysis Anticipated  LOCA frequency for each break location  System/containment response analysis for multiple break sizes and locations – expect similar results as STP  Boric Acid Precipitation with fiber  CASA Grande modification for Vogtle test results and analysis results  Sensitivity Studies

GSI-191 Schedule – Option 2b 10/12 1/13 4/137/1310/1310/14 1/15 4/157/1510/15 1/14 4/147/14 1/16 4/167/1610/16 1/17 4/177/1710/17 PWROG Integrated Program WCAP SE Industry Program Clock Start U1 Outages U2 Outages Modification Timeline Work Order Planning U1 Mod Design Vendor Dwgs Design Readiness Review Specification and PO for Engineered Items Analysis & Testing, Conceptual Design STP Integrated Program STP RAI’s & NRC Issue SE STP Program Vogtle RI Submittal Vogtle Complete RI Actions U2 Mod Complete Laser Scan for measurements Discuss Plan with NRC Schedule to NRC Vogtle RAI’s and SE Vogtle Final Submittal 3 rd Outage

Template Considerations  Vogtle has completed measurements for contingency insulation replacement on both units  Vogtle has Level 2 PRA in good shape  Vogtle has started 3D-CAD model and RELAP5/MELCOR model for RI Option 2b  Insufficient time (because of 18 month cycle and RFO timing) to complete insulation removal by 3 rd RFO after 1/1/2013 (April 2016 vs. 1/1/2019) if RI path not viable

Proposed Variance with Template  Complete any PRA justified necessary insulation replacements or remediation, or other identified plant changes during the next refueling outage, following issuance of an SE for the risk-informed resolution LAR for Vogtle 1& 2.  If it is determined during the risk-informed process that this option is not viable, Vogtle will complete a deterministic resolution path by January 1, 2019.