The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds.

Slides:



Advertisements
Similar presentations
1 CLIENT CONSULTANT AGREEMENT. 2 Negotiations Types of Consulting Contracts Standard Form of Contract Form of Contract General Conditions Special Conditions.
Advertisements

PROJECT STUDY AREA Route Selection. Stage 1 Environmental Assessment Guidelines to underpin the effectiveness of the National Roads Project Management.
Michael Egan Head of Corporate Affairs National Roads Authority Development and Implementation of the National Roads Programme in Ireland
Formats envisaged in the Common Provisions Regulation for major projects Third Meeting of the Expert Group on Delegated and Implementing Acts for the ESI.
The Cohesion Fund: Programming and link to the Structural Funds Annual Meeting of ISPA Partners 2003: From ISPA to Cohesion Fund and Structural Funds Angela.
Project Development Process (PDP) Structures. PDP – Three Project Levels Major Project ~ 14 Steps Major Project ~ 14 Steps Minor Project ~ 10 Steps Minor.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
Constructionsite Construction Procedure Ron Gatepain.
MANAGING MOTORWAYS CONSTRUCTION IN CROATIAN MOTORWAYS Goran Legac Construction Department Croatian Motorways, Ltd. Zagreb,
Contractor Safety Management
USAID Africa Bureau EIA Procedures for Sub-Projects
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Construction Procedure. Identifying potential site Initial site appraisal Initial feasibility study Discussion with statutory bodies Detailed feasibility.
Spring 2008, King Saud University Engineering Administration Dr. Khalid Al-Gahtani 1 What is a Project? “A Project is a one-shot, time-limited, goal- directed,
ZHRC/HTI Financial Management Training
Peter Defranceschi ICLEI - Local Governments for Sustainability An Introduction European Commission GPP Training Toolkit.
Regional Accreditation Workshop For Latin America & Caribbean Region Panama City, Panama th Nov, 2011.
PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova.
PUBLIC PROCUREMENT OPERATIONS Dr. Fred Mugambi Mwirigi JKUAT 1.
EARTO – working group on quality issues – 2 nd session Anneli Karttunen, Quality Manager VTT Technical Research Centre of Finland This presentation.
Major project development in the Framework of CF and ERDF funds JASPERS - a technical support facility Presented at an InterAct Danube Region Strategy.
Current Design and Implementation Challenges of Road Projects on the Coastland Ron Rahaman Chief Roads and Bridges Officer Ministry of Public Works Works.
Project Monitoring and Evaluation in the GMS 7-18 May 2012, Mekong Institute, Khon Kaen Project Monitoring and Evaluation for Road Construction in Lao.
An Introduction to World Bank Organization and Operations Jean-Charles Crochet Senior Transport Economist World Bank.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
WIPO Pilot Project - Assisting Member States to Create an Adequate Innovation Infrastructure to Support University – Industry Collaboration.
1 DPW Presentation to the Portfolio Committees on Correctional Services and Public Works Kimberley Correctional Centre 24 November 2010.
BASICS IN IRRIGATION ENGINEERING 2.1. Planning Irrigation systems 2.2. soil-plant-water relation – over view 2.3. Crop water requirement 2.4. Base, delta.
HR 08 IB SPP 02 TWINNING PROJECT “ENHANCEMENT OF CAPACITY FOR EFFECTIVE MANAGEMENT OF EU COHESION POLICY FUNDS” 1 The most significant results of Component.
Annual Conference October 2011 Water Services Training Group 15 th Annual Conference Water Services in Ireland – Organisational modernisation and new challenges.
I N S T R U M E N T E S T R U C T U R A L E I N R O M A N I A Infrastructure Development in Romania Workshop.
TAOYUAN ENVIRONMENTAL SCIENCE & TECHNOLOGY PARK BUSINESS INVITATION SEMINAR PRESENTATION OF PREFERENTIAL MEASURE & COUNSELING ENVIRONMENTAL PROTECTION.
THE PROJECT CYCLE By Dr. Peter Quartey (ISSER, Univ. of Ghana)
Environmental Management Plan (EMP) Required for: Full EIA based on Palestinian EIA Policy Category A projects based on World Bank Policy.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
Projects spanning over two programming periods Department for Programme and Project Preparation Beatrix Horváth, Deputy Head of Department Budapest, 5.
Chapter 3 Strategic Information Systems Planning.
PPSD in specific sectors in Bulgaria - Regional Plans for Development National Programme for Ports Development (2006 – 2015) Vania Grigorova, Jacquelina.
PUBLIC PROCUREMENT INFORMATION TECHNOLOGIES IN THE REPUBLIC OF TAJIKISTAN PUBLIC PROCUREMENT AGENCY UNDER THE GOVERNMENT OF THE REPUBLIC OF TAJIKISTAN.
Progress with Priority Environmental Infrastructure Investment Projects in Croatia PEIP Regional Meeting - 26 th November 2007 Brussels MINISTRY OF ENVIRONMENTAL.
SEA in the Czech Republic Prague, 24 September 2008.
P ublic Sector Development Project Preparation, Approval and Revision Process Mantu Kumar Biswas Joint Chief Ministry of Water Resources Bangladesh Secretariat.
Environmental Protection and Permitting Nurhan IZAIRI Minister of Environment and Physical Planning Republic of Macedonia CONSTRUCTION PERMITS FOR A COMPETITIVE.
PPP Legal & Regulatory Framework. PPP Policy In July 2008 GOK approved the PPP policy directive through which: PPPs are identified as a method for investing.
Initial eligibility assessment and ex-post monitoring of State aid in EU funds co-financed projects.
Project Scoping. Project Scoping – learning objective Who should complete the Project Initiation Package (PIP)? How is PDP Path used in scoping? Task.
ARC 807: Professional Practice and Procedure Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 807: Professional Practice.
CENF CIVIL ENGINEERING : - DESIGN TENDER AND ESTIMATED COSTS John Osborne GS/SE 19 July 2013.
HNSciCloud Pre-Commercial Procurement Project Procurement Framework and Schedule Dante Gregorio CERN 26 January
EVALUATION OF THE SEE SARMa Project. Content Project management structure Internal evaluation External evaluation Evaluation report.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
UNIVERSITY OF DAR ES SALAAM t Selection and Employment of Consultants Negotiations with Consultants; Monitoring Performance of Consultants; Resolving Disputes.
DG ENV Environmental assessment procedures for energy infrastructure projects of common interest (PCIs)
Lecturer: Lina Vladimirovna Zhornyak, associated professor.
Inter-American Development Bank BIMILACI 2007 QUALITY PROCUREMENT Third Party Review May 2007 Project Procurement Division.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
European Structural and Investment Funds for railways in Poland November 2015 Wolfgang Munch, Deputy Head of Unit DG Regional and Urban Policy.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
City of Ottawa, NCHCA & CEO 2017 Education Series
MONEY, FRAUD AND THE POLITICIAN
Reconstruction site Investigation, Planning, Scheduling, Estimating and Design Eng. Fahmi Tarazi.
1 2 3 PRE-MINING APPLICATION PHASE MINING PHASE
WGARM Appraisal Decision Assistance Phase 1, Dec. 2002
EIA TRAINING RESOURCE MANUAL FOR SOUTH EASTERN EUROPE
GPP Training Toolkit An Introduction European Commission
Management Verifications & Sampling Methods
United Nations Voluntary Fund on Disability (UNVFD)
PROJECT MANAGEMENT WORKSHOP
TOTAL COST CONTROL ON CONSTRUCTION PROJECTS
Presentation transcript:

The realisation of the projects: "sine qua non" condition for the absorption of the EU Funds

The equation of the development: Before accession fkh p N Financial resources Know-how (Administrative and technical capacity) Projects NeedsNeeds

The equation of the development: After accession Fkh p N Financial resources Know-how (Administrative and technical capacity) Projects NeedsNeeds

What does it means "technical capacity" to realise projects Administration Appropriate legal framework Technical know how Managerial know how Necessary human resources Necessary administrative structures Private sector Technical equipment Technical know-how Necessary structures

What should be done by the administration?  Define the project  Plan its realisation  Manage all preparatory phases  Realise or supervise the realisation of the project  Approval/reception of the realised works Maturity Execution These are obligatory stages which if not taken into account from the beginning will be revenged

FROM FINANCING DECISION TO PROJECT COMPLETION  WHAT HAS TO BE DONE  WHEN (with which sequence)  HOW LONG IT WILL TAKE

MAIN PHASES DURING THE LIFE OF AN INFRASTRUCTURE PROJECT PREPARATORY ACTIONS PHASE 8 TO 12 MONTHS DEFINITION OF THE PROJECT NATIONAL/ REGIONAL PLANNING APPROVALS DECISION FOR REALISING THE PROJECTS DESIGN TENDERING & DESIGN PHASE 20 TO 46 MONTHS WORKS TENDER & CONSTRUCTION PHASE 23 TO 38 MONTHS LAND EXPROPRIATION (7 TO 24 MONTHS) WORKS TENDER (5 TO 8 MONTHS) CONSTRUCTION (18 TO 30 MONTHS) DESIGN TENDER STAGE I : INITIAL STAGE OF DESIGN- PREPARATORY STUDIES STAGE II: PRELIMINARY DESIGN AND EIA APPROVAL STAGE III: FINAL DESIGN STAGE IV: FINAL DESIGN OF SPECIAL WORKS STAGE V: TENDER DOCUMENTS AND LAND EXPROPRIATION DIAGRAM BUDGETARY APPROVALS TOTAL : 51 TO 96 MONTHS i.e 4.2 TO 8.0 YEARS

FOCUS ON THE DESIGN INDICATIVE TIME SCHEDULE OF DESIGN TENDERING AND DESIGN PHASE FOR A REGIONAL ROAD PROJECT ESTIMATED MINIMUM, MEAN AND MAXIMUM DURATION

4 TH STAGE OF DESIGN –FINAL DESIGN OF SPECIAL STRUCTURES DESIGN TENDER STAGE SEQUENCE OF DESIGN STAGES AND APPROVALS FOR A REGIONAL ROAD PROJECT 1 ST STAGE OF DESIGN - PREPARATORY STUDIES AND PRELIMINARY ROAD ALLIGNMENT AWARD OF DESIGN CONTRACT PREPARATORY GEOMETRIC DESIGN AND ALLIGNMENT LOCATION OF JUNCTIONS PRELIMINARY GEOLOGICAL ASSESSMENT TRAFFIC ASSESSMENT STUDY COST BENEFIT STUDYTRAFFIC STUDY APPROVAL OF PROJECT LOCATION AND PRELIMINARY ENVIRONMENTAL APPRAISAL PRELIMINARY ENVIRONMENTAL APPRAISAL 2 ND STAGE OF DESIGN – PRELIMINARY DESIGN ROAD PRELIMINARY GEOMETRIC DESIGN ALLIGNMENT STUDY FINAL GEOLOGICAL STUDY TERRAIN SURVEYING INCEPTION DESIGN OF CULVERTS, BRIDGES AND RETAINING WALL DESIGN ENVIRONMENTAL IMPACT ASSESSMENT APPROVAL OF ENVIRONMENTAL IMPACT ASSESSMENT ESTABLISHMENT OF ENVIRONMENTAL TERMS SECOND STAGE APPROVALSECOND STAGE APPROVAL PRELIMINARY DRIANAGE DESIGN FIRST STAGE APPROVALFIRST STAGE APPROVAL APPROVALS BY OTHER AUTHORITIES DELIVERABLES BY THE DESIGNER - CONSULTANT APPROVAL BY THE PROJECT MANAGING AUTHORITY RESPONSIBILITIES: PROGRAMME OF GEOTECHNICAL INVESTIGATIONS C B PUBLICATION OF ENVIRONMENTAL IMPACT ASSESSMENT LAND EXPROPRIATION PROCEDURES 3 D STAGE OF DESIGN - FINAL DESIGN ROAD FINAL GEOMETRIC DESIGN AND ALLIGNMENT STUDY FINAL DRAINAGE DESIGN GEOTECHNICAL STUDY ROAD EQUIPMENT DESIGN SIGNAGE AND MARKING ENVIRONMENTAL ARCHITECTURE AND IRRIGATION PLAN PRELIMINARY DESIGN OF CULVERTS, BRIDGES AND RETAINING WALLS FINAL DESIGN OF CULVERTS, BRIDGES AND RETAINING WALL DESIGN APPROVALAPPROVAL 5 TH STAGE OF DESIGN - TENDER DOCUMENTS LAND EXPROPRIATION DIAGRAM SPECIAL CONDITIONS OF CONTRACT GENERAL CONDITIONS OF CONTRACT TECHNICAL DRAWINGS DOCUMENTS TECHNICAL SPECS PRICED BILL OF QUANTITIES – BREAKDOWN OF COST LIGHTING AND E/M DESIGN INITIATION OF WORKS TENDER LAND EXPROPRIATION PROCEDURES DESIGN TENDER PREPARATION DESIGN TENDER PUBLICATION RESPONSE TO DESIGN TENDER EVALUATION OF TENDERS DESIGNATION OF PREFERED TENDERER APPEAL PROCEDURES D A THIRD STAGEAPPROVALTHIRD STAGEAPPROVAL FOURTH STAGE APPROVAL E

DESIGN TENDER STAGE AWARD OF DESIGN CONTRACT DESIGN TENDER PREPARATION DESIGN TENDER PUBLICATION RESPONSE TO DESIGN TENDER EVALUATION OF TENDERS DESIGNATION OF PREFERED TENDERER APPEAL PROCEDURES DESIGN TENDER STAGE

1 ST STAGE OF DESIGN - PREPARATORY STUDIES AND PRELIMINARY ROAD ALLIGNMENT AWARD OF DESIGN CONTRACT PREPARATORY GEOMETRIC DESIGN AND ALLIGNMENT LOCATION OF JUNCTIONS PRELIMINARY GEOLOGICAL ASSESSMENT TRAFFIC ASSESSMENT STUDY COST BENEFIT STUDYTRAFFIC STUDY APPROVAL OF PROJECT LOCATION AND PRELIMINARY ENVIRONMENTAL APPRAISAL PRELIMINARY ENVIRONMENTAL APPRAISAL 2 ND STAGE OF DESIGN – PRELIMINARY DESIGN ROAD PRELIMINARY GEOMETRIC DESIGN ALLIGNMENT STUDY FINAL GEOLOGICAL STUDY TERRAIN SURVEYING INCEPTION DESIGN OF CULVERTS, BRIDGES AND RETAINING WALL DESIGN ENVIRONMENTAL IMPACT ASSESSMENT APPROVAL OF ENVIRONMENTAL IMPACT ASSESSMENT ESTABLISHMENT OF ENVIRONMENTAL TERMS SECOND STAGE APPROVALSECOND STAGE APPROVAL PRELIMINARY DRIANAGE DESIGN FIRST STAGE APPROVALFIRST STAGE APPROVAL APPROVALS BY OTHER AUTHORITIES DELIVERABLES BY THE DESIGNER - CONSULTANT APPROVAL BY THE PROJECT MANAGING AUTHORITY RESPONSIBILITIES: PROGRAMME OF GEOTECHNICAL INVESTIGATIONS CB PUBLICATION OF ENVIRONMENTAL IMPACT ASSESSMENT 1st AND 2nd STAGE : PREPARATORY STUDIES, PRELIMINARY DESIGN AND EIA STUDY, EIA APPROVAL

4 TH STAGE OF DESIGN –FINAL DESIGN OF SPECIAL STRUCTURES SECOND STAGE APPROVAL SECOND STAGE APPROVAL LAND EXPROPRIATION PROCEDURES 3 D STAGE OF DESIGN - FINAL DESIGN ROAD FINAL GEOMETRIC DESIGN AND ALLIGNMENT STUDY FINAL DRAINAGE DESIGN GEOTECHNICAL STUDY ROAD EQUIPMENT DESIGN SIGNAGE AND MARKING ENVIRONMENTAL ARCHITECTURE AND IRRIGATION PLAN PRELIMINARY DESIGN OF CULVERTS, BRIDGES AND RETAINING WALLS FINAL DESIGN OF CULVERTS, BRIDGES AND RETAINING WALL DESIGN APPROVALAPPROVAL 5 TH STAGE OF DESIGN - TENDER DOCUMENTS LAND EXPROPRIATION DIAGRAM SPECIAL CONDITIONS OF CONTRACT GENERAL CONDITIONS OF CONTRACT TECHNICAL DRAWINGS DOCUMENTS TECHNICAL SPECS PRICED BILL OF QUANTITIES – BREAKDOWN OF COST LIGHTING AND E/M DESIGN INITIATION OF WORKS TENDER LAND EXPROPRIATION PROCEDURES THIRD STAGEAPPROVALTHIRD STAGEAPPROVAL FOURTH STAGE APPROVAL 3, 4 TH AND 5 TH STAGE : FINAL DESIGN, TENDER DOCUMENTS, LAND EXPROPRIATION DIAGRAM D E APPROVALS BY OTHER AUTHORITIES DELIVERABLES BY THE DESIGNER - CONSULTANT APPROVAL BY THE PROJECT MANAGING AUTHORITY RESPONSIBILITIES:

SUMMARY - CONCLUSIONS  The design procurement and design process phase is a critical period for the success of the project and is an integral part of the project pipeline  The time required for design phase and works procurement must not be underestimated  The correct sequence of preparatory stages leads to better and more effective projects who are realized on time