1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education.

Slides:



Advertisements
Similar presentations
Connoizor Enabling Performance for Businesses through Software Website: Contact:
Advertisements

©2003 Rolls-Royce plc The information in this document is the property of Rolls-Royce plc and may not be copied or communicated to a third party, or used.
Budget Management. 57 Budget Management Budget Development Good scheduling skills and abilities Understanding of the project scope Well developed WBS.
1 What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
Monitoring and Control Earned Value Management (EVM)
CSSE Oct.2008 Monitoring and reporting project status Chapter 10, pages
Irwin/McGraw-Hill ©The McGraw-Hill Companies, 2000 Chapter 13 Progress and Performance Measurement and Evaluation.
Chapter 10: Monitoring and Controlling Change
Degree and Graduation Seminar Cost Management
Section 4.0 Project Implementation. Factors that Ensure Success  Update the project plan  Stay within scope  Authorized change implementation  Providing.
Earned Value Project Management: a powerful tool for software projects
Project Cost Management J.-S. Chou, P.E., Ph.D.. 2 Learning Objectives  Explain basic project cost management principles, concepts, and terms.  Discuss.
Project Management Process Project Description Team Mission/ Assignment Major Milestones Boundaries Team Identification Measures of Success Roles & Responsibilities.
Progress and Performance Measurement and Evaluation CHAPTER THIRTEEN Student Version Copyright © 2011 by The McGraw-Hill Companies, Inc. All rights reserved.
Project Management 6e..
EARNED VALUE MANAGEMENT SYSTEM A Project Performance Tool
Earned Value Analysis by John Cornman. Introduction “Earned Value Analysis” is an industry standard way to measure a project’s progress, forecast its.
PowerPoint Presentation by Charlie Cook THE MANAGERIAL PROCESS Clifford F. Gray Eric W. Larson Progress and Performance Measurement and Evaluation Chapter.
Project Management Methodology Project monitoring and control.
Chapter 13: Progress and Performance Measurement and Evaluation
Conducted By: Dr. Madhu Fernando, PMP, DBA, MEng. MGT PROJECT MANAGEMENT LESSON 5 AND 6: PROJECT PLANNING – TIME AND COST PLANNING AND MANAGEMENT.
1 of 24 Earned Value Management.
Project Cost Management
Microsoft Project Association Building an EV System using MS Project (and Excel) Kirsty C. McLean, MBA, PMP Project Controller, Photonics Division General.
EARNED VALUE MANAGEMENT (EVM)
Earned Value Management System (EVMS). Given: –total budget of $100,000 –12 month effort –produce 20 units Status: –spent to date: $64,000 –time elapsed:
Management & Development of Complex Projects Course Code MS Project Management Earned Value Concepts Lecture # 19.
UU Master Class Earned Value 17 July Earned Value Contents What is Earned Value / Earned Value Analysis Why and where is it used A brief history.
EARNED VALUE MANAGEMENT (EVM) TUTORIALS
Learning PMP Formulas the Easy Way
Evaluating EVM January 13, EVM Issues and Opportunities ▪ EVM Basics ▪ EVM Issues ▪ EVM ETC and EAC Calculations ▪ EVM Cost and Schedule Value Calculations.
Introduction To Earned Value November 14, Definition Earned Value is a method for measuring project performance. It compares the amount of work.
Department of CS & Eng. MSSE Program, © Fissure 1 SOFTWARE PROJECT MANAGEMENT COURSE Executing, Monitoring and Controlling Session #7.
Earned Value Analysis Tracking Project Progress. Introduction | Components | Project Scenario | Values | Calculations | Forecasts | Summary l What Is.
Where Module 04 : Knowing Where the Project Is 1.
1 Earned value analysis Planned value (PV) or Budgeted cost of work scheduled (BCWS) – original estimate of the effort/cost to complete a task (compare.
PMP Study Guide Chapter 11: Controlling Work Results.
EARNED VALUE MANAGEMENT & ORACLE PRIMAVERA P6 TREY MILLER, MBA, PMP ORACLE PRIMAVERA P6 EPPM CERTIFIED IMPLEMENTATION SPECIALIST GLOBAL PROJECT MANAGEMENT,
EVM – Do You Really Know What the Numbers Mean? Booz | Allen |Hamilton Seth Huckabee EVP, PMP, PMI-SP.
EARNED VALUE  Earned Value Management Systems  Earned Value Analysis.
0 Earned Value Management. 1  What is it?  Where did it come from?  What’s so special about it?  How do you do it?  What is an EVMS?
Information Technology Project Management, Seventh Edition Note: See the text itself for full citations.
What Is It ? Why Do I Need It ? How Do I Do It? Earned Value Analysis.
October 11, EARNED VALUE AND PERFORMANCE MANAGEMENT.
Agenda ‒ Cost Management ‒ Cost Budgeting ‒ Cost Control Learning Goals 1.Cost Control 2.Earned Value Management.
Project Management 1 Project Control. Project Management 2 Topics Project Control Status Reporting Earned Value Analysis.
Earned Value Analysis by Miles M. Hamby, PhD Copyright©2014 Miles M
“PMP® Exam Prep” Earned Value Management
TOPIC-8B- PROJECT COST CONTROL
CHAPTER:7 Project Cost Management
Earned Value Management
Chapter 7: Project Cost Management
Project evaluation and control
5. Cost resources & PLAN DURATION
Earned Value Management
Project Cost Management
EVM 202—Lesson 7 Tools Analysis Case Study
Earned Value Management
EVM 202—Lesson 7 Tools Analysis Case Study
An Introduction to Earned Value Performance Measurement
Monitoring and Reporting Project Progress
Earned Value Measures Planned Value (PV) Earned Value (EV)
فرآيند كنترل پروژه.
Project Evaluation and Control
5. Cost resources & PLAN DURATION
MGT 605: CH-13 Progress and Performance Measurement and Evaluation
5. Project PLAN & cost estimation
Managing Project Work, Scope, Schedules, and Cost
Project Evaluation and Control
Where We Are Now. Where We Are Now Structure of a Project Monitoring Information System Creating a project monitoring system involves determining:
Presentation transcript:

1 Understanding Earned Value in Under an Hour Breakout Session # A11 Name: Wayne Brantley, MS Ed, PMP, ITIL Senior Director of Professional Education Villanova University Online Date: July 30, 2012 Time: 11:15 – 12:30

Earned Value and The DaVinci Code 2 2

3 3

Tradition Academic Excellence Online Convenience Serving the Nation’s Leading Universities Associate’s Bachelor’s Master’s Certificates 4 Tradition Academic Excellence Online Convenience Serving the Nation’s Leading Universities Associate’s Bachelor’s Master’s Certificates 4

5 Professional Education Online Contract Management Six Sigma Project Management ITIL Business Intelligence IS Security Business Analysis Human Resources ROI Methodology Leadership For more information, please call or visit

Agenda 6 6 Establish the link between the requirements and the performance measurement baseline Understand what the Earned Value calculations are measuring Explain Earned Value as an easy to use tool for project performance measurement

Why Do We Need Earned Value? 7 7 Approximately 70% of projects are: Over budget Behind schedule 52% of all projects finish at 189% of their initial budget *Standish Group: Chaos Report

What is Earned Value Analysis? 8 8 “Earned Value Analysis” is: An industry standard way to: Measure a project’s progress Forecast it’s completion date and final cost Provide schedule and budget variances along the way

What is Earned Value Analysis? 9 9 EV compares: The PLANNED amount of work (PV) that has actually been COMPLETED (EV) and how much the work ACTUALLY COST (AC)

What EV Tells You 10 Where you are on schedule Where you are on budget Where you are on work accomplished

Reasons to Know Earned Value! 11 Legislation: GPRA; 1993 FASA, Title V; 1994 Clinger-Cohen Act; 1996 And Let’s Not Forget OMB! (Circular A-11, Part 7) "Agencies must use a performance based acquisition management system, based on ANSI/EIA Standard 748, to measure achievement of the cost, schedule, and performance goals."

12 Earned Value Management Thresholds Federal Agency EVM Threshold EVMS Threshold DoD, NASA$20-$50 millionEVMS required DoD, NASAGreater than $50 million EVMS implementation & process must be verified GSAGreater than $20 million EVMS required; implementation & process must be verified DoEGreater than $20 million EVMS required EPAGreater than $5 millionEVMS required FAAGreater than $10 million EVMS required

Six Essential Elements to Implementing an Earned Value Management System 13 1.Good requirements 2.A detailed WBS 3.Good estimates for durations 4.Good estimates for budgets 5.A good schedule 6.A performance measurement baseline

How is learning Earned Value like eating an elephant? 14 One bite at a time

What You Need to Know 15  Scope, Requirements, and the WBS  Understand the link between requirements and the WBS  Scheduling  Understand the development of a schedule and time estimates  Budgeting  Understand how cost estimates are developed  Earned Value  Identify how earned value calculations are accomplished  Reporting  Know how earned value (EV) can be used to measure project progress

Understand the link between requirements and the WBS 16

Understanding the link between requirements and the WBS 17 Where do we start in order to gather requirements? Request for Proposal Statement of Work Contract Project Charter Any others?

The Project Charter 18 What should be in a Project Charter? 1.Sponsor authorization and signs-off 2.Project Manager assigned Other considerations? Requirements Business need Project purpose Milestones Stakeholder influences Functional organizations Assumptions and constraints Summary budget

19

Obtaining Good Requirements 20 Why are good requirements essential? SCOPE

Obtaining Good Requirements 21 How do you obtain good requirements? Take time to do it Ask the right people the right questions Draw a picture Build a model Build a little Check and re-check

Dilbert Looks at Requirements 22

Understanding the link between requirements and the WBS 23  What is a WBS?  “A deliverable-oriented hierarchical decomposition of the work to be executed by the project team to accomplish the project objectives and create the required deliverables.”

Understanding the link between requirements and the WBS 24  Why is a WBS so important?  How low do you go?  Project (1.0)  Deliverables (1.1, 1.2, 1.3, …..)  Tasks (1.1.1, 1.1.2, 1.1.3, …….)  Activities ( , ,…….)  Why an 80 - hour rule?

Scheduling - Understand the development of a schedule 25

Dilbert Looks at Scheduling 26

Scheduling 27 What do we have at this point? Requirements WBS Who would you go to determine what must be done and in what order? What tools are available for scheduling? What do scheduling and a game of chess have in common?

28

Most Powerful Scheduling Tool 29

Scheduling 30 Critical scheduling questions What comes first? What comes second? Any restrictions? Any constraints?

 Get good estimates  Who would you ask?  Know how good  +/- some variance  +75/-25%  +25/-10%  +10/-5%  Think of optimistic, most likely, and pessimistic  PERT = O + 4 (ML) + P / 6 Optimistic Most Likely Pessimistic X = PERT Duration Estimating

STARTSTART FINISHFINISH days ES 7 EF 9 LF 9 LS days ES 1 EF 6 LF 6 LS days ES 3 EF 4 LF 10 LS days ES 1 EF 2 LF 8 LS days ES 10 EF 15 LF 15 LS days ES 5 EF 9 LF 15 LS days ES 3 EF 4 LF 18 LS days ES 16 EF 18 LF 18 LS 16 Blue denotes the critical path Early Schedule Late Schedule Project duration = 18 days Develop a Schedule

33 The Gantt Chart View Task 1.1.1Days Days Days Days Days Days Days Days 16 - End Days

Budgeting - Understand how cost estimates are developed 34

Dilbert Looks at Budgeting 35

Budgeting 36 What do you have at this point? Requirements WBS Schedule Where do your cost estimates come from? Where should they come from? What are the differences?

37 The Gantt Chart View - Cost at $10,000/day per task Task 1.1.1Days Days Days Days Days Days Days Days 16 - End Days

DaysTaskTotalCumulative Total =$20, =$20,000$40, =$30,000$70, =$30,000$100, =$20,000$120, =$20,000$140, =$20,000$160, =$20,000$180, =$20,000$200, =$10,000$210, =$10,000$220, =$10,000$230, =$10,000$240, =$10,000$250, =$10,000$260, =$10,000$270, =$10,000$280, =$10,000 $290,000 Building the cumulative cost curve $10,000/day each task

Days $200k = PV $290k $200k $100k $50k BAC = $290k PV The Cumulative Cost Curve

Earned Value – Identify how earned value calculations are accomplished 40

 Budget at completion is $290k  Why at day 9 (half of 18 days) are we at $200k and not $145k (half of $290k)?  Why is the cost curve not linear?  How does this correlate to EV? Spending Rates Spending Rates

Tying in the Cumulative Cost Curve and EV Planned Value (PV) = Planned costs for the planned work to be done at a particular time (BCWS) Earned Value (EV) = The percentage of the planned work that was accomplished (BCWP) Actual Costs (AC) = Amount spent on the work that was accomplished (ACWP) Budget At Completion (BAC) = Total of all planned costs

 BAC = The $290k that is the total costs of all work to be done  PV (BCWS) = The $200k is amount spent through Day 9  EV (BCWP) = The % assessed of the work done  AC (ACWP) = The actual costs spent on the work done Tying in the Cumulative Cost Curve and EV

 Variance Analysis  Cost Variance (CV) = Earned Value (EV) – Actual Costs (AC)  Schedule Variance (SV) = Earned Value – Planned Value (PV) Earned Value  Performance Indices  Cost Performance Index (CPI) = Earned Value / Actual Costs  Schedule Performance Index (SPI) = Earned Value / Planned Value

 SV = EV – PV or BCWP - BCWS  SPI = EV / PV or BCWP / BCWS  CV = EV – AC or BCWP - ACWP  CPI = EV / AC or BCWP / ACWP  EAC = BAC / CPI Earned Value

Reporting – Know how earned value (EV) can be used to measure project progress 46

Dilbert Looks at EV Meetings 47

Dilbert Looks at EV Meetings 48 Earned Value

 Notice all formulas are dependent on EV (BCWP)  Typical variance is planned – actual dollars spent  or in earned value language PV – AC  We are determining the percent of the work that was completed (= EV) based on what we planned to do (= PV)  EV shows you what you did versus what you said you would do Earned Value

 The Math!  We know the following: BAC = $290k Day 9 PV – what is it? Planned Value (PV) to spend is $200k  If at day 9 we have accomplished 80% of the scheduled work we can calculate the EV. What is it? Earned Value (EV) is $160k = 80% of PV ($200k)  Accounting tells us we have spent $175,000 – what does this tell us? The Actual Cost (AC) is $175k Earned Value

 You can now identify and calculate the following PV (BCWS), EV (BCWP), AC (ACWP) CV CPI SV SPI EAC Earned Value

Identify and calculate the following  PV, EV, AC =  PV = $200k, EV = $160k, and AC = $175k  CV = EV - AC 160k-175k = -$15k (Over Budget) Rule of thumb = negative is BAD!  CPI = EV / AC 160k/175k = $.91 or 91% Earned Value – Answers

 How are we doing?  It depends –  What was an acceptable variance? Earned Value – Answers

Identify and calculate the following  SV = EV - PV 160k - 200k = -$40k (Behind Schedule)  SPI = EV / PV 160k / 200k = $.80 or 80%  How are we doing?  How about as compared to CPI? Earned Value – Answers

PV = $200k, EV = $160k, AC = $175k, BAC = $290k EAC = BAC / CPI = 290k/.91 = $318k Earned Value – Answers

Days $200k = PV $290k $200k $100k $50k BAC = $290k PV Forecasting EAC = $318k ETC VAC

EAC = BAC / CPI = $290k /.91 = $318k ETC = EAC – EV = $318k - $160k = $158K VAC = BAC – EAC = $290k - $318k = -$28k TCPI = (BAC – EV) / (BAC – AC) = $290k - $160k / $290k - $175k $130k / $115k = 1.13 Forecasting

Requirements WBS Schedule Time Estimates Forward and Backward Passes Budget Cumulative Cost Curve Earned Value

Contact Information Wayne Brantley, PMP, MS Ed Ext. 509 For information on Villanova University’s online offerings go to: or call Questions !