Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.

Slides:



Advertisements
Similar presentations
ISO New England Demand Resource Measurement & Verification Standards Manual Overview April 11, 2007 NAESB Development of DSM/EE Business Practices Washington,
Advertisements

Simplified VO M&V Protocols Approved May 4 th, Simplified VO M&V Protocol can be applied to distribution systems with Residential and Small Commercial.
A Comparison of Measure Avoided Cost Calculations using Utility TOU Load Shapes and DEER Hourly Measure Savings 14 March 2006.
Time-of-Use and Critical Peak Pricing
Portable Classroom Controls Project Chuck Collins RCM Meeting April 27, 2007.
A Two-Level Electricity Demand Model Hausman, Kinnucan, and Mcfadden.
Save Energy and Money PNM Energy Efficiency Programs
Pentair Water Pool & Spa Pool Pump Rebate Programs
Mechanical Engineering Department ME 322 Operation and Management of Power Plants Prof. Osama A El Masry Prof. Osama El Masry Load Curves.
Automated Demand Response Pilot 2005/2004 Load Impact Results and Recommendations Final Report © 2005 Rocky Mountain Institute (RMI) Research & Consulting.
Experience you can trust Statewide Multifamily Rebate Program: Findings & Recommendations CALMAC Meeting Pacific Energy Center October 17, 2007.
BPA Guidelines for Measurement & Verification of Energy Efficiency Measures Presented at Brown Bag Session November 29, 2006.
Booster System Basics: Constant Speed Systems
MENG 547 LECTURE 3 By Dr. O Phillips Agboola. C OMMERCIAL & INDUSTRIAL BUILDING ENERGY AUDIT Why do we audit Commercial/Industrial buildings Important.
The Bottom Line In Energy Cost Reduction Energy Automation Systems, Inc. EASI.
Connecticut Energy Efficiency Incentive Program Overview of Program February 2010 DPUC-Approved Energy Efficiency Incentives for Connecticut Electric Users.
Evaluation of Energy Savings for Strip Curtains Presented To RTF Scott Moore PECI Sr. Engineer June 2, 2009.
Electrical Billing and Rates MAE406 Energy Conservation in Industry Stephen Terry.
SINTEF Energy Research 1 Remodece meeting January 2007 Nicolai Feilberg.
EDISON INTERNATIONAL® SM Internal Use Only Page 1 Commercial Variable Speed Swimming Pool Pump Jason Wang Cal TF Work Paper Presentation October 23, 2014.
Utility Analysis. Baseline Electricity Analysis  Understanding and documenting current energy use is called developing a baseline. Developing a baseline:
Grocery Measure: LEDs for Reach-In Display Cases Regional Technical Forum July 21 st, 2015 Mohit Singh-Chhabra.
Overview – Non-coincident Peak Demand
Industrial Pump Motor VFDs: Provisional Standard Protocol Christian Douglass Regional Technical Forum 5/12/2015.
PRESENTED BY Toshiba International: Mike Tharp Hupp Electric Motors: Dave Patterson.
Dairy Milking Machine Vacuum Pump VFD Savings Calculator Follow-up from the last RTF meeting with more field data Regional Technical Forum December 7,
1 Quality Control Review of E3 Calculator Inputs Comparison to DEER Database Brian Horii Energy and Environmental Economics, Inc. November 16, 2006.
Night Covers on Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
DNV GL © 2014 SAFER, SMARTER, GREENER DNV GL © 2014 HVAC_3 Quality Maintenance 1 Research Plan.
© 2001 The Gas Company. All copyright and trademark rights reserved. High Efficiency Unit Heaters Workpaper Presentation Prepared for Cal TF Presentation.
Retrofit Doors to Open Vertical Cases Provisional UES Proposal Presentation to the Regional Technical Forum August 30,
ERCOT 2003 UFE ANALYSIS By William Boswell & Carl Raish AEIC Load Research Conference July 13, 2005.
Facilities Management and Design
C OMMERCIAL S HOWERHEAD M ETERING S TUDY April 5, 2011 Regional Technical Forum Presented by: Michael Baker SBW Consulting, Inc.
Capacity Impacts of Energy Efficiency What We Know and What We Don’t Know March 11, 2014.
1 EE Evaluation Report on 2009 Bridge Funding Period California Public Utilities Commission November 22, 2010 Energy Division Energy Efficiency Evaluation.
DHP for Houses with Electric FAF Research Plan: Revisions Adam Hadley, Ben Hannas, Bob Davis, My Ton R&E Subcommittee February 25, 2015.
EnergySmart Grocer Program Evaluation Findings Summary PWP, Inc.
MBCx Projects – Programs, Process, and Results Soda, Tan, Shields and Wurster David Jump, Ph.D., P.E., Matt Denny, P.E. Quantum Energy Services & Technologies,
Results from the California Energy Efficiency Potential Study – Existing Residential and Commercial Jean Shelton July 27, 2006 San Francisco, California.
B O N N E V I L L E P O W E R A D M I N I S T R A T I O N Smart Power Strips in Commercial Office Applications RTF October 4, 2011.
Strip Curtains for Refrigerated Walk-in Boxes Michele Friedrich, PE – Sr. Engineer Eric Mullendore – Energy Analyst PECI 8/3/2010.
“Do Green” Two Options: Prescriptive Custom Prescriptive- -Must be running a MODULATING ROTARY SCREW AIR COMPRESSOR -Must be 75 Horsepower or Less Custom-
July 26, 2014 Refrigeration Subcommittee Proposed Revision of Refrigeration Provisional Data Requirements.
BPA M&V Protocols Overview of BPA M&V Protocols and Relationship to RTF Guidelines for Savings and Standard Savings Estimation Protocols.
Code Officials and the Code Process.  To design the interior of the building in conjunction with codes, standards and federal regulations required in.
Serves Local Distribution Companies Manages Small Business Lighting for 18 LDCs Largest evaluator of Retrofit Programs - 26 LDCs TRC tool and support.
Load Research Status Presentation to the Load Research/Forecasting Working Group June 3rd, 2010.
Electric / Gas / Water MAESTRO Evaluation Showcase July 26-27, 2006 Project Manager: Pierre Landry, SCE Lead Consultants: Mike Rufo, Itron; Keith Rothenburg,
NEEA DEI Study Data Analysis Plan October 28, 2005 RLW Analytics, Inc. Roger L. Wright, Chairman, and Principal Consultant.
New Construction Studies Performed by: MAESTRO/CALMAC Evaluation Showcase ● Pacific Energy Center ● July 26-27, 2006 EM&V of the Statewide Savings By Design.
Utilities’ Update on Energy Savings Assistance Program Studies Ordered in D LIOB Meeting August 21, 2013 Sacramento, California.
Week 6 The Energy Walk Through. Possible elements of a walk through Understand on-site information collection and listing of essential data for collection.
Electric / Gas / Water Summary of Final Evaluation Report Prepared by: John Cavalli, Itron Beatrice Mayo, PG&E July 27, Express Efficiency Program.
Week 7 Utility Data Analysis. Essential Elements Identify sources for obtaining utility data: paper form, electronically or from the internet Review utility.
Variable Load on Power Stations
Thayer J. Hendrickson.  Demand-Side Management is the idea of strategically controlling the customer’s electrical loads in order to reduce its maximum.
Energy Conservation What are the Society’s Conservation Goals: GOAL #1: 20% Portfolio Energy Reduction by 2020 GOAL #2: 20% Portfolio Water Reduction by.
Multifamily Programs Focused Impact Evaluation March 10,
Turning Energy Data into Operations Intelligence Presented to: FMA September 17, 2013.
Regional Energy Networks Impact Evaluation Research Plan July 20,
Seminar On Energy Audit Submitted To: Submitted By:
Workshop Presentation
Mid Semester UEB Energy Analysis of a Wastewater Treatment Plant by using Artificial Neural Network Presented by: Dr. Nor Azuana Ramli Electrical Engineering.
State Allocation Board Hearing Solar Energy and Energy Efficiency Project Options for California Schools Mark Johnson, Energy Solutions Manager - Schools.
Behavior Modification Report with Peak Reduction Component
PG&E EV Fleet Program.
PG&E EV Fleet Program.
Presentation transcript:

Metering and Measuring of Multi-Family Pool Pumps, Phase 1 March 10, 2016 Presented by Dan Mort & Sasha Baroiant ADM Associates, Inc.

State-Wide Study 2 Collect data for Utilities to develop Workpapers SCE SDG&E PG&E SCG

Measurement Types by Utility 3 Type 1: SCE Pre and Post Site Visits and Measurements Type 2: SDG&E and SCG Baseline or Post-only Measurements Type 3: PG&E Baseline and Post Measurements with new VSD installed while at the site (one visit)

Number of Sample Pools by Utility 4 SCESCGSDG&EPG&E*Total Target Actual

Sampling Strategy by Utility 5 SCE – Identify candidate sites by working with implementation contractors of the Multi-Family Energy Efficiency Rebate (MFEER) Program SDG&E – Random cold calling + working with pool maintenance contractors SCG – Carry over from SCE + random calls in targeted areas PG&E – Develop sampling strategy based on climate zones and MF pool populations

Data Analysis Methodology Overview 6 Construction of pump energy usages Method 1: Spot kW measurements coupled with on/off schedule from sundial timer or VSD pump menu Method 2: Couple motor Amp time series data with power factors, voltages Calibration of data to true-kW spot measurements Construction of savings estimates for SCE pump retrofits Create annual load profiles for baseline and VFD pump Subtract post from pre annual usages to obtain annual savings Subtract post from pre peak demands to obtain peak demand estimates Savings estimates for SCG, SDG&E from one-time measurements Apply relative savings from SCE study to baseline (or VFD) annual usages

Energy Usage from Spot Measurements 7 ADM field engineers conducted spot measurements on each pump with a “true-RMS kW” power meter. Single-speed pumps require just one spot measurement VSD pumps require power measurements at various RPM settings Amps, Volts, Power Factor, and kW were recorded The spot kW measurements are then coupled with pump operation schedules Single-speed pumps can have a seven-day schedule, with a potential seasonal change in operation In practice, most pumps had identical daily schedule throughout the year VFD pumps usually have two or three separate RPM settings in their operation schedules We create an annual hourly schedule for each pump base on site visit documentation Couple kW from spot measurements with pump schedules to obtain annual hourly kW profile

Energy Usage from Metering Amps 8 ADM field engineers logged pool pump amps at 5-minute intervals Loggers were installed prior to pump change out, and left to log VFD pump Average “pre” and “post” monitoring periods were 38 days and 25 days, respectively The amp data were converted to kW using voltages and power factors We used a two step process for this: 1.Use average on-site voltages from one-time measurements, and a pump Amp vs. Power Factor curve to map Amps to kW 2.Calibrate the result from step 1 to actual spot-measurement kW values

Energy Usage from Metering Amps 9 The plot to the right has ~200 separate measurements on ~50 VSD pumps. The distribution is fairly homogeneous and easy to model because most of the pumps had identical motors Both active contractors for the SCE program tended to show a strong preference for the same line of pool pumps We believe that our results are representative of potential savings from VSD pumps Motor efficiencies are fairly confined to a reasonably homogeneous range Significant savings come from flow reductions, and are, to first order, independent of VSD pump make/model

How do the Two Methods Compare? 10 Whenever possible, we calculated pump energy usages by using both methods We use metering data when available, but use the spot measurements as a check For the baseline period, metering resulted in 7.7% higher estimated energy usage than spot measurements (delta was 7.7%, with a standard error of 3.4%) Most common reason for the difference is that base pump schedule indicated less than 24 hour operation, but metering showed 24/7 operation For the post-installation period, metering resulted in 0.7% lower estimated energy usage than spot measurements (delta was 0.7%, standard error 1.7%) Main reason for better agreement for VSDs is that their schedules are easier to verify

Construction of Savings Profiles for SCE 11 We create annual 8760-hour schedules by replicating the weekly schedule, as obtained from reading the pump schedules or from the metered pump loads (after converting to average kW for each hour of the week) Energy savings are the difference between the sums of the baseline and VFD annual usages Demand reductions are the savings on weekdays, between 2PM and 5PM

Energy Savings vs. Baseline Horsepower 12 The plot to the right shows data from 52 pool pumps, installed in 51 different pools The energy savings are not particularly sensitive to baseline horsepower, except at the high and low extremes The plot to the right shows that the relative savings (as % of baseline usage) are not strongly dependent of baseline horsepower

Construction of Savings for SDG&E and SCG 13

Is the savings factor from SCE applicable? 14 The plot to the right shows the annual pump energy usage vs. nameplate horsepower from SCE and SDG&E single-speed pumps The similarity of the two distributions indicates that it is likely that SDG&E would experience comparable savings from VSD pump retrofits

Energy Savings Load Profile 15

Savings 16 IOU Energy Savings, kWh Demand Reduction, kW Energy Savings, % Demand Reduction, % SCE6, %33.1% SDG&E6, %31.7% SCG9, %37.0% Average6, %33.0%

Pool Lighting 17 IOU Average In-Pool Lighting, Watts Average Pool Area Lighting, Watts Pool Lighting Hours Annual In- Pool Lighting Energy Use, kWh Annual Pool Area Lighting Energy Use, kWh SCE314104,0971,30342 SCG553-4,2162,264- SDG&E ,7961,054590

Pool Lighting Type 18 DescriptionLamp TypeSCESCGSDG&E Number of Pools in Sample with In-Pool Lighting LED3110 Incandescent36410 Halogen210 HPS200 Other701

Public Pool Safety 19 Multi-Family pools fall into the classification of public pools Title-24 defines the characteristics and capabilities of the equipment at the time a pool is installed or a remodel that triggers a building inspection Title-22 defines the maintenance and water quality of public pools There are gray areas when interpreting the codes

County EH&S Surveys 20 Phone surveys conducted with inspectors from 10 counties Public pools are inspected by local County Environmental Health and Safety Departments Public pools are inspected from 1-3 times per year Counties indicated openness to energy and demand saving equipment provided that the use was not in direct conflict with public pool code enforcement. About a third of responses said they would not allow the flow rate to vary during hours the pool is open to the public.

County EH&S Surveys 21 About a third of responses said there is only one interpretation of the code No special allowance is provided for reducing flow during utility peak demand periods Pool water turnover rates are only checked and enforced during the plan check stage of construction Typically inspectors only look to see if the flowmeter is working and do not calculate turnover rate

Questions & Answers 22 Thank You