SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016.

Slides:



Advertisements
Similar presentations
Gas Consumer Forum Project Nexus xoserve update 27th July 2009
Advertisements

July 2003 Structure of Electricity Distribution Charges Welcome and Introduction Charles Gallacher Deputy Director, Scotland.
David Halldearn, ERGEG Conference on Implementing the 3 rd Package 11 th December 2008 Implementating the 3rd Package: An ERGEG Consultation paper.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
The Australian Energy Regulator QLD Electricity distribution determination 2015–2020 Meeting with FNQ consumers/stakeholders 15 January 2014.
The Australian Energy Regulator SA electricity distribution determination 2015–2020 Framework and approach Presentation to the Energy Consumers’ Council.
Madrid, 1 st April 2008 Proposal for the commercialisation of existing and committed capacity at the cross border point of Larrau between France and Spain.
The Australian Energy Regulator TasNetworks Public Forum Revenue Proposal 1 July 2014 to 30 June July 2014.
Doc.: IEEE /0028r1 Submission January 2011 Bruce Kraemer, MarvellSlide 1 Smart Grid Update – January 2011 Date: 2011-January-10 Abstract: NIST.
Page 1 Structure of the Code Don Thomson, Working Group Chair and IESBA Member IESBA CAG Meeting April 10, 2013 New York.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
Energy Networks Association RIIO-ED1 Update for Suppliers December 2012.
Market Operations Standing Committee of the IMO Market Operations Standing Committee October 22, 2003.
The EU’s Third Energy Package European Code Development UNC Transmission W/S - 4 th December 2008.
Page 1 Future Strategy and Work Plan IESBA CAG Meeting September 11, 2013 New York Ken Siong, IESBA Technical Director.
Work Related to Senate Bill 2202 (effective January 1, 2001)
Madrid Forum 6-7 November 2008 Implementating the 3rd Energy Package: An ERGEG Consultation paper Lord Mogg, ERGEG chairman.
Page 1 | Proprietary and Copyrighted Information Structure of the Code Don Thomson, Task Force Chair IESBA Meeting New York, USA September 15-16, 2015.
COMET Working Group Progress Report. Purpose of Report Provide Team Updates Potential Future Voting Items Draft Competitive Meter Ownership Timeline.
Market Operations Standing Committee March 5, 2003.
Market Evolution Program. 2 Topics Overview of the Market Evolution Program Consultation Plan for Phase 1 Overview of the Market Evolution Program Consultation.
Transition Plan Network Operations Model Change Requests 5/26/2010.
SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 11 March 2016.
SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.
Power of Choice (PoC) Program Overview
EXECUTIVE forum DATE: MON 29 MAY 2017 TIME: 1:30 PM– 2.30 PM (AEST)
B2B Working Group Workshop
Power of choice – embedded networks information session
Power of choice executive forum
B2B Working Group Meeting
PROGRAM CONSULTATIVE FORUM Meeting pack
Power of Choice – Program Consultative Forum (Poc-PCF) Meeting pack
EXECUTIVE forum DATE: 15 DECEMBER 2016 TIME: AM – PM
PROGRAM CONSULTATIVE FORUM Meeting pack
Causer Pays Workshop 20 March 2017.
WIND And Solar ENERGY CONVERSION MODEL GUIDELINES Consultation update – September 2016 Presented by Marcelle Gannon.
66 items – 70% of circulated products
Retail Market Subcommittee Update to TAC
B2B Working Group 30 November, 2016
New transparency guidelines
FlorenceForum November 2008
Power of choice (POC) Executive Forum
IGG Agenda 17th December 2009 Minutes from Previous IGG Meeting
POC Procedures Working Group (POC-pWG)
ESB Networks AIP Programme
PROGRAM CONSULTATIVE FORUM Meeting pack
PROGRAM CONSULTATIVE FORUM Meeting pack
POWER OF CHOICE PROGRAM CONSULTATIVE FORUM
POC Procedures Working Group (POC-PWG) Work package 3 (As Built)
EXECUTIVE FORUM 8a Meeting pack
Five-Minute Settlement Program: Information Session 1
Five-Minute Settlement Program: Executive Forum 1
Five-Minute Settlement Program: Program Consultative Forum 1
Update on European Network Codes
PROGRAM CONSULTATIVE FORUM Meeting pack
EXECUTIVE forum DATE: 27 MARCH 2017 TIME: 2.00 PM – 3.30 PM (AEDT)
Five-Minute Settlement Program: Program Consultative Forum 4
4th Quarter 2015 Thursday, October 15, :00 to 3:30 p.m. EST
Five-Minute Settlement Program: Executive Forum 3
Five-Minute Settlement Program: Executive Forum 2
5MS Systems Working Group
Changes to Reserve Level Declaration Guidelines
Five-Minute Settlement Program: Information Session 2
IGG Agenda 29th June 2011 Minutes from Previous IGG Meeting
Power of Choice (PoC) Program Overview
Five-Minute Settlement Program: Program Consultative Forum 6
Smart Grid Update – January 2011
Future Strategy and Work Plan
Scene setter European Commission DG Environment
Public Protector South Africa Deputy Public Protector of South Africa
Presentation transcript:

SLIDE 1 POC PROCEDURES WORKING GROUP (POC-PWG) 14 January 2016

SLIDE 2 AGENDA SLIDE 1.Background 2.What we need to do? 3.How are we going to do it? 4.Process 5.Workshop discussion topics 6.Close and questions

SLIDE 3 1. BACKGROUND On 26 November 2015, the AEMC made a final rule that will open up competition in metering services. On 17 December 2015, the AEMC made a final rule to reduce the barriers to embedded network customers accessing retail market offers. The new arrangements, which will commence on 1 December 2017, have required changes to the National Electricity Rules (NER) and the National Electricity Retail Rules (NERR). The changes to the NER require that AEMO and the IEC amend existing procedures and that AEMO create new procedures.

SLIDE 4 BACKGROUND The final rule determinations for MC and EN require AEMO and the IEC to review and update their procedures in accordance with the following timelines: o By 1 September 2016, amend and publish:  Metrology Procedures  MP and MDP Service Level Procedures  Meter Churn Procedures  MSATS Procedures  NMI Standing Data Schedule  RoLR Procedures  B2B Procedures o By 1 September 2016, establish and publish:  Network Device Procedures  Minimum Services Specification  Emergency Priority Procedures Other documents including registration and accreditation procedures are required by 1 March 2017.

SLIDE 5 BACKGROUND The meter replacement process rule change is at draft determination stage: o May require additional changes to procedures shortly before the commencement of formal consultation o Impact to procedure changes will be considered upon the publication of the AEMC’s final determination Specific review of the objection codes in MSATS: o AEMC customer switching review o COAG Energy Council request to AEMO to review objection codes and MSATS procedures o Competition in metering rule demands review of objection codes, regardless of COAG request AEMO procedure framework design: o Consolidate and clarify o Remove duplication and format consistently o Meet the requirements of the NER o Structured to create flexibility in the future

SLIDE 6 BACKGROUND Procedure Framework

SLIDE 7 2. WHAT WE NEED TO DO? By 22 April 2016, AEMO needs to commence formal consultation on procedures for MC and EN to be published by 1 September 2016 Review objection codes in MSATS Make the procedures technically accurate and compliant with the NER Future input in subsequent stages during the process

SLIDE 8 3. HOW ARE WE GOING TO DO IT? At the December workshop we discussed the format of future workshops Outcomes were: o Smaller, more focused working groups based on themes/topics o AEMO discussion papers supported by AEMO SMEs o Stakeholder input on technical procedures/matters Workshops will not be: o Information / training sessions o Formal consultation (at this stage) o Related to changes beyond MC / EN / MRP (e.g. SMP rule change)

SLIDE 9 4. PROCESS Focused on the matters where AEMO needs further input from stakeholders: o Some changes are straight forward (e.g. Metering Coordinator replacing the Responsible Person) o Input needed on items that are not so clear Flexibility: o Timing restrictions (1 st round consultation by 22 April) o Meter replacement process final determination o May identify topics for further discussion as we go along AEMO and stakeholders will need to be flexible during this process

SLIDE WORKSHOP DISCUSSION TOPICS Session 1 o Identification of type 4 metering  Current type 4  Small customer type 4  Type 4A o Validation and substitution for type 4 o Sample metering o Network device management requirements o Emergency priority requirements o Meter churn

SLIDE WORKSHOP DISCUSSION TOPICS Session 2 o MSATS requirements  Including objection code review o B2B requirements  Including life support Session 3 o Metering business processes The agendas of these and subsequent sessions will evolve over time based on progress and topics that come up in discussion.

SLIDE CLOSE AND QUESTIONS Questions? Next steps: The next workshop is scheduled for 3-4 February 2016 Future workshops are in Industry Calendar Contact: