Presentation is loading. Please wait.

Presentation is loading. Please wait.

SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL.

Similar presentations


Presentation on theme: "SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL."— Presentation transcript:

1 SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL

2 SLIDE 2 Power of Choice – Metering Competition AGENDA 1.10:00-10:05 Attendance and apologies 2.10:05-10:10 Confirm agenda 3.10:10-10:15 Purpose of meeting 4.10:15-10:30 Supporting materials – Issues Log 5.10:30-11:30 Supporting materials - Role Mapping 6.11:30-12:30 Supporting materials - Process flows for services 7.12:30-1:00Lunch break 8.1:00-2:00 Supporting materials - Process flows for services 9.2:00-3:00 Service level procedures: Meter Data Provider Services 10.3:00-3:30 Metrology Procedure: Part B 11.3:30-3:45 MDFF 12.3:45-4:00 Next steps & Close meeting TimeAgenda Item

3 SLIDE 3 Power of Choice – Metering Competition 3. PURPOSE OF MEETING Objective of the 2 nd workshop o Ongoing review the first set of papers developed as part of the early preparation and drafting being done prior to receipt of the Final Determination for the Metering Competition Rule change o Items for discussion today are:  Issues Log  Role mapping  High level process flows for services  Review of change marked: Service level procedures: Meter Data Provider Services Metrology Procedure: Part B MDFF Power of Choice – Metering Competition

4 SLIDE 4 Power of Choice – Metering Competition 4. ROLE MAPPING Role Appointments & Commercial Agreements o Updated diagrams o Clarifications : “Another person”, “Appoint”, order of priority, “large customer” o Practical scenarios – Role changes Appointment requirements for distribution connection points o Updated diagrams o Clarifications o Practical scenarios – VIC AMI Meters, Type 5/6 Meters

5 SLIDE 5 Power of Choice – Metering Competition TRANSACTION MODEL Current transaction model presented Suggestions for alternate models captured Process mapping to help determine efficient approach prior to final determination.

6 SLIDE 6 Power of Choice – Metering Competition REMAINING QUESTIONS/FEEDBACK Can an obligation on the MC under rule be passed on to a service provider? At some point we need to consider what will happen when the DB undertakes a site visit for a faulty type 5/6 meter. It is unlikely that the MC will have sufficient afterhours people on call (who can reach each site) - customers cannot be left off supply (e.g. especially life support, sensitive load etc.) – so what will happen? Diagram 3 should recognise billing process between MC and the DNSP/Other Authorised Parties for services

7 SLIDE 7 Power of Choice – Metering Competition 7. PROCESS FLOWS FOR SERVICES Business process maps for the following services have been updated based on the participant feedback collected during and after the previous workshop: o New Connections (Not NSW) o New Connections (NSW) o Manual Re-energisation and De-energisation o Remote Reconnection and Disconnection This is only a draft version of the process maps to stimulate discussion in the workshop to be able to identify changes to roles and retail market business processes as a consequence of the MC rule change. Other business process maps will be updated and developed for discussion in the upcoming workshops (i.e. Abolishment, Meter Change, etc.) Power of Choice – Metering Competition

8 SLIDE 8 6. LUNCH BREAK

9 SLIDE 9 Power of Choice – Metering Competition SERVICE LEVEL PROCEDURE MDP Review analysis on: o Exemption requirements o Reversion of meters type 4A to type 4

10 SLIDE 10 Power of Choice – Metering Competition 9. METROLOGY PROCEDURE: PART B Discuss issues raised by participants in the previous workshop as the following: o Consider if registration, substitution and validation provisions for current type 4 is still valid for mass market type 4 o Clarify issue with sample meter requirements Power of Choice – Metering Competition

11 SLIDE 11 Power of Choice – Metering Competition 10. MDFF Summary of changes on MDFF file: o Section 4.3.4 – section title changed. o Section 5.3 - NMI data details record (200) – change in “Definition” column for RegisterID field. Field is required for type 4A and type 5 meters. o Section 5.6 - B2B details record (500) – change in “Definition” column for IndexRead field. Field is required for small customers with type 4A, 4 or 5 metering installations. Power of Choice – Metering Competition

12 SLIDE 12 Power of Choice – Metering Competition 10. NEXT STEPS Additional workshops are being planned in the months of October and November this year. The proposed dates of those workshops are as follows: o 22 October o 26 November DISCUSSION ITEM - Scope and agenda for subsequent workshops to be discussed Power of Choice – Metering Competition


Download ppt "SLIDE 1 Power Of Choice Metering Competition Pre-Final Rule Determination Workshop #2 24 th September 2015 FINAL."

Similar presentations


Ads by Google