Presentation is loading. Please wait.

Presentation is loading. Please wait.

B2B Working Group Workshop

Similar presentations


Presentation on theme: "B2B Working Group Workshop"— Presentation transcript:

1 B2B Working Group Workshop
22 September :00 – 16:00 Presented BY Chris Cormack

2 Agenda In Attendance Update on progress and confirmation of timeline and IEC sign-off process for start of consultation. Review two new supplied transactions: NMI inquiry Pre-installation query Documents, document structure and drafting points Technical Specification document and any technical issues Notified Party transactions MSATs changes required to support B2B procedures Clarify Customer details notification with respect to Life Support Prospective retailer service orders Any other feedback

3 In attendance AEMO: Chris Cormack – Procedure Lead, Andrew Suwignjo – SME, Paul Le Favi – SME, Jackie Krizmanic- SME, Matt Stuchbury - BA. Retailer reps:, Mark Riley – AGL Energy, Mara Tenis – Lumo/Red Energy, Karly Train – Energy Australia, Aakash Sembey – Simply Distributor reps: David Woods – SA Power Networks, Brett McLean – United Energy, David Sales –TasNetworks, Anna Russo – Endeavour Energy Metering or Third Party reps: Paul Greenwood – Vector, Charles Coulson – Metropolis Metering, Helen Vassos– Active Stream, Shaun Cuppitt – Acumen Apologies: nil.

4 UpDATE and NEXT STEPS 22 September todays workshop 27 September – draft procedure review 4 October – draft procedure Final review 7 October – endorsement to proceed to IEC for approval to consult 10 October – Initial Draft procedures sent to IEC 17 October – IEC Meeting 20 October – Initial Consultation starts 25 November – Initial Consultation ends 23 December – Draft procedures Consultation starts 20 January – Draft procedures Consultation ends 6 March – Publish final procedures

5 Pre-installation Query and NMI Inquiry transaction
Review information provided by participants: NMI Inquiry – supplied by Brett McLean. The group defined a similar transaction in Adds and Alts discussion Meter Installation query – are these sufficiently different to warrant a different transaction? Pre-Installation query – supplied by Shaun Cupitt For review.

6 Documents and drafting
Four key Procedures updates: Service Order Process 3.0 – see next page for full Service Order communications. Customer Site Details Notification 3.0 – Customer Details Notification including new Life Support Customer Details Block, Custer Details Request, Customer Details Reconciliation, Site Details Notification. Data Process 3.0 – formally Meter Data process includes PMD, VMD and MDN as well as the provision of data for transactions – Pre-Installation query, Meter Installation query and NMI inquiry. One Way Notification 3.0 – Network Tariff Notification, Meter Fault Notice, Planned Interruption notification and Notice of Metering Works Other documents Technical Specification 3.0 – incorporates all technical information in one document Business Rules Guide – a new document that can be used by participants to guide the use of procedures (IEC document not B2B procedure) Glossary update for B2B terminology – this is an update to the Retail Procedures Glossary and Framework for key terms from B2B procedures ROLR Procedure Part B – once B2B procedures are close to being finalised this will be updated

7 service order LIST Including hierarchy
Supply Service Works Allocate NMI Tariff Change Supply Connection Supply Alteration Supply Abolishment RE-Energisation De-Energisation Remote Remove Fuse Turn off main switch and sticker Main switch seal Technical disconnect Meter Isolation Supply Isolation Disconnection at pole top, pillar box or pit Recipient discretion Special Read Check Read Final Read On Demand Metering Service Works Meter Exchange Meter Install Move Meter Meter Reconfiguration Remove Meter Install Controlled Load Install Hot Water Change Time Switch Meter Investigation – Inspect Meter Investigation – Test Meter Investigation – Tamper Miscellaneous Service Request

8 Drafting Principles for new B2b Procedures
AEMO’s current style guide No replication of legal requirements Legal and regulatory context consolidated in Retail Electricity Market Procedures – Glossary and Framework Common terms defined in Retail Electricity Market Procedures Glossary and Framework) Long terms will be abbreviated where the abbreviations are commonly used

9 Drafting Principles for new B2b Procedures
The content of each procedure will reflect the subject matter of that procedure and not be replicated Redundant or anachronistic material either redrafted or deleted Procedures will be consolidated where appropriate Other changes based on the drafting principles are intended to rationalise, not change the substance of the obligations or rights of the parties to which the procedures apply

10 Technical specification Questions
Schema change: Will there be a mandatory schema change 1st December 2017? Transactional interactions between participants and the B2B/SMP hub: Will participants be able to use their current/preferred method of transacting with the hub? Will the hub transform messages into the preferred transactional method for each participant? Will there be instantaneous transactions? ITWG Commencement When will the ITWG for the SMP commence?

11 Agenda items added by the group
Notified Party transactions Brett McLean MSATs changes required to support B2B procedures Anna Russo Clarify Customer details notification with respect to Life Support General Discussion – see over Prospective retailer service orders Mara Tenis Any other items

12 Customer site details notification incorporating Life support
New Process flow allows participants to use other means of communication – as agreed between Initiator and Recipient – which could be phone or . However, there is still an expectation that a CDN will be sent by an Initiator.

13 Life Support Details block
If Life Support Flag is checked Y (Mandatory Field in in CDN) then the following fields become available: Field Format : USAGE Definition/Comments LifeSupportContactName PERSONNAME M Should be the name of the person who is the specific contact for the management of Life Support and Life Support Equipment for the connection point. LSPostalAddress ADDRESS Must be the customer’s postal address for Life Support notifications. An aseXML compliant structured address or unstructured address must be provided. The data provided must be the one considered by the Current FRMP to be the one most suitable for use as a postal address for contacting the customer. The postal address, if provided in an unstructured format, must be complete such as to comply with Australia Post presentation standards. . LSPhoneNumber1 TELEPHONE R Must be the phone number of the person who is the specific contact for the management of Life Support notification for each connection point. LSPhoneNumber2 Must be the phone number of the person who is the specific contact for the management of Life Support notifications for each connection point. LS Address VARCHAR(40) M/N Address should be provided if recorded by Initiator LifeSupportEvidence VARCHAR(1) Y or N values only.   ConcessionDetails Concession Details should be provided if recorded by Initiator. Must be provided if LifeSupportEvidence = Y SiteAddress Must be the site address for the location of the Life Support Equipment. An aseXML compliant structured address or unstructured address must be provided. Must be provided if LifeSupportEvidence = Y Life Support Equipment Must be provided if LifeSupport Evidence = Y.  List of Equipment (To be added here) PatientName Should be the name of the person who uses LifeSupport Equipment.. Must be provided if LifeSupportEvidence = Y

14 NEXT STEPs Next Workshop 27 September


Download ppt "B2B Working Group Workshop"

Similar presentations


Ads by Google