R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks 5.5.

Slides:



Advertisements
Similar presentations
Bob MichaelsParity Collab. Mtg. May 17, `07 Integrating Compton DAQ and Analysis Bob Michaels with Reminder about Nov 2006 Results Specification of new.
Advertisements

May 17th 2007 Happex Collaboration Meeting 1 Compton polarimeter Electron detector upgrade and status PREX/Happex Collaboration Meeting May 17 th 2007.
Compton integrating method Beam test summary PREX/Happex Collaboration Meeting Alexandre Camsonne.
Group Meeting 03/02/2004. Format of Weekly Group Meeting  Daily chore  Research report: electronic presentation required  Journal report.
Hall A Gmp / DVCS Fall preparation September 16 th 2014 Hall A meeting Alexandre Camsonne 1.
MICE CM15 June 2006Jean-Sébastien GraulichSlide 1 DAQ Status o Detector DAQ Test bench in Geneva o Preparing for Test Beam o FE electronics tests o Detector.
MICE CM Berkeley 9-12 Feb February 2005 Edda Gschwendtner 1 Control/Monitoring and DAQ for PIDs Edda Gschwendtner.
VC Sept 2005Jean-Sébastien Graulich Report on DAQ Workshop Jean-Sebastien Graulich, Univ. Genève o Introduction o Monitoring and Control o Detector DAQ.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Hall D Trigger and Data Rates Elliott Wolin Hall D Electronics Review Jefferson Lab 23-Jul-2003.
Hall A 12 GeV DVCS Status report December 16th 2013 Hall A collaboration meeting Alexandre Camsonne.
SBS/A1n DAQ status Alexandre Camsonne August 28 th 2012.
Hall A meeting October 15 th 2013 Alexandre Camsonne.
Hall A DAQ status and upgrade plans Alexandre Camsonne Hall A Jefferson Laboratory Hall A collaboration meeting June 10 th 2011.
Operated by Los Alamos National Security, LLC for NNSA U N C L A S S I F I E D LDAQ – the New Lujan Center Data Acquisition Application Frans Trouw, Gary.
14 Sep 2005DAQ - Paul Dauncey1 Tech Board: DAQ/Online Status Paul Dauncey Imperial College London.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
L3 DAQ the past, the present, and your future Doug Chapin for the L3DAQ group DAQ Shifters Meeting 26 Mar 2002.
S. Brambilla, “Recent DAQ integration test at L.N.L May 2008” 7 th AGATA Week, Uppsala, 8-11 July th AGATA Week Uppsala, 8-11 July 2008 Recent.
David Abbott - JLAB DAQ group Embedded-Linux Readout Controllers (Hardware Evaluation)
Summary talk of Session 6 - Electronics and Interfacing to AD DAQ - Mechanics for the Demonstrator for the AD ancillary detector integration team: for.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Background Physicist in Particle Physics. Data Acquisition and Triggering systems. Specialising in Embedded and Real-Time Software. Since 2000 Project.
Lead Fluoride Calorimeter for Deeply Virtual Compton Scattering in Hall A Alexandre Camsonne Hall A Jefferson Laboratory October 31 st 2008.
March running preparation Alexandre Camsonne Hall A meeting February 28 th 2014.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
David Abbott - Jefferson Lab DAQ group Data Acquisition Development at JLAB.
Serial Data Link on Advanced TCA Back Plane M. Nomachi and S. Ajimura Osaka University, Japan CAMAC – FASTBUS – VME / Compact PCI What ’ s next?
Fast Fault Finder A Machine Protection Component.
GlueX electronics Collaboration Meeting December, 2003 Paul Smith.
Hall A DAQ meeting January 12 th Summary summary GMp /DVCS BCM / Unser Raster Summary Compton EDTM F1 TDC Halo monitor Gas Cerenkov SBS Fastbus.
MOLLER DAQ Aug 2015 meeting Team : R. Michaels, P. M. King, M. Gericke, K. Kumar R. Michaels, MOLLER Meeting, Aug, 2015.
GLAST LAT Project CERN Testbeam WorkShop, Pisa, 20 March 2006 David Smith & Denis Dumora VME DAQ 1 The Bordeaux Data Acquisition system
SoLID review DAQ recommendations Alexandre Camsonne.
SoLiD/PVDIS DAQ Alexandre Camsonne. DAQ limitations Electronics Data transfer.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
CM19 Vassil Verguilov DAQ Status  Progress  DAQ  Next steps  Summary.
Electronics for HPS Proposal September 20, 2010 S. Boyarinov 1 HPS DAQ Overview Sergey Boyarinov JLAB June 17, 2014.
SBS/A1n Fast DAQ Alexandre Camsonne October 19 th 2012.
1 Electronics Status Trigger and DAQ run successfully in RUN2006 for the first time Trigger communication to DRS boards via trigger bus Trigger firmware.
Guirao - Frascati 2002Read-out of high-speed S-LINK data via a buffered PCI card 1 Read-out of High Speed S-LINK Data Via a Buffered PCI Card A. Guirao.
APEX DAQ rate capability April 19 th 2015 Alexandre Camsonne.
HPS TDAQ Review Sergey Boyarinov, Ben Raydo JLAB June 18, 2014.
SBS / A1n DAQ Alexandre Camsonne 02/27/2013. APV25 Standard VME access ok : can configure board Check address assignment in VME64X crate Need to debug.
Level-1 Trigger Commissioning Status A.Somov Jefferson Lab Collaboration Meeting, May 10, 2010.
Hall–D Level-1 Trigger Commissioning Part II A.Somov, H.Dong Jefferson Lab 12 GeV Trigger Workshop, July 8, 2010  Play Back Test Vector in Hall-D commissioning.
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
DAQ Speed and Run2 Estimates April 3, Summary of FADC Development for Faster Performance NameReadoutTrigger ScalersScaler S1 (helicity gated), S2.
DAQ Selection Discussion DAQ Subgroup Phone Conference Christopher Crawford
Super BigBite DAQ & Trigger Jens-Ole Hansen Hall A Collaboration Meeting 16 December 2009.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Sep14, 2015.
DAQ and Trigger for HPS run Sergey Boyarinov JLAB July 11, Requirements and available test results 2. DAQ status 3. Trigger system status and upgrades.
Overview of E906 Electronics, Readouts, and DAQ System E906 DAQ workshop Ting-Hua Chang (7/6 – 7/7/2009)
Gu Minhao, DAQ group Experimental Center of IHEP February 2011
Software for Testing the New Injector BLM Electronics
ELENA scrapers ELENA status for BI – electronics and software
Counting Mode DAQ for Compton
Iwaki System Readout Board User’s Guide
PADME L0 Trigger Processor
Data Acquisition (DAQ) Status
Hall A Compton Electron detector overview
Read-out of High Speed S-LINK Data Via a Buffered PCI Card
VETROC for Edet DAQ Bob Michaels (presenting) Scott Barcus Alexandre Camsonne Ben Raydo and the GRINCH group (Todd Averett et. al.) Compton Meeting.
Example of DAQ Trigger issues for the SoLID experiment
Alexandre Camsonne September 12th 2015 SoLID collaboration meeting
August 19th 2013 Alexandre Camsonne
ZDD status BESIII Collaboration Meeting, September 2012
DAQ for SBS GEM SBS collaboration meeting August 6th 2019
Experiment DAQ and trigger GMn SBS Collaboration Meeting
Presentation transcript:

R. Michaels, JLAB PREX Mtg, July 2008 Compton DAQ (General) Remaining experts : Sirish Nanda, Alexandre Camsonne, me Recent Exercises Port to vxWorks went ok, except one I/O not addressable -- may need faster cpu’s on ROC1/2 Incorporate FADC DAQ into General DAQ Speed Tests (goal: to do oversampling for PREX) Hz may be possible (oversample 6) -- Not done yet, in contact with Damien Neyret.

R. Michaels, JLAB PREX Mtg, July 2008

R. Michaels, JLAB PREX Mtg, July 2008 ROC 1 / 2 : Photon and Electron Detector (the main VME crate)

R. Michaels, JLAB PREX Mtg, July 2008 Software on ROC1 / 2 DMA mgt of photon & electron data Scaler readout, and informs mailbox read is done Acquisition state machine mgt Online computing, prepares buffers for event builder

R. Michaels, JLAB PREX Mtg, July 2008 TLOOP Process on ROC 1 / 2

R. Michaels, JLAB PREX Mtg, July 2008 “ADC0” : a customized card involved in the trigger (no longer an ADC, it has FPGA and NIM I/O)

R. Michaels, JLAB PREX Mtg, July 2008

R. Michaels, JLAB PREX Mtg, July 2008

R. Michaels, JLAB PREX Mtg, July 2008

R. Michaels, JLAB PREX Mtg, July 2008

R. Michaels, JLAB PREX Mtg, July 2008 Compton Integrating DAQ CMU group & me

R. Michaels, JLAB PREX Mtg, July 2008 Conclusions -- Compton DAQ Priority: Implement new ETROC (electron detector) Speed tests (might prove we need 2 new 6100 cpu’s) Calibration of FADC data (photon detector) -- need trigger / time-correlation Complex system : -- replace obsolete / slow parts ? -- spares situation ? -- need improved in-house expertise  Alex’s talk