Regina Bypass Project Information Session. Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement.

Slides:



Advertisements
Similar presentations
Urban Transportation Council Green Guide for Roads Task Force TAC 2009 Annual Conference and Exhibition Vancouver.
Advertisements

Tracy Lovell, PE A FOCUSED APPROACH TO SAFETY. Provide a Transportation System  Safe  Efficient  Environmentally Sound  Fiscally Responsible.
Edmonton’s Anthony Henday Drive Unique Challenges Saskatchewan P3 Summit 2014 Regina, Saskatchewan September 9, 2014.
I-4 Ultimate with Lanes Project Central Florida 1 May 21, 2013.
September 2014 SASKATCHEWAN P3 SUMMIT Strategic Partnerships Office, Alberta Infrastructure Bundling Projects - the Alberta School Experience. Public Sector.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Utah’s Use of CMGC & Project Delivery
I-10 Exercise. Project Description Current and anticipated congestion due to rapid growth, one lane in each direction will be added to Interstate 10 from.
State Aid Design-Build Project Delivery for Minnesota Cities and Counties.
JANUARY 9, 2002 SCAJAQUADA CORRIDOR STUDY Grant Street to Parkside Avenue City of Buffalo Fisher Associates Joseph Passonneau & Partners In Association.
2012 CSVA Conference VE Scan of Western Canada Projects – The Flexibility of VE for Decision Making.
T.H. 23 / South Saratoga Street Reduced Conflict Intersection and Pedestrian Overpass Project Project hearing October 14, 2014 City Council Presenters.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Legal Perspective on NDOT Alternative Procurements Geoffrey S. Petrov, Nossaman LLP.
TYPES OF INTERSECTIONS OF ROAD AND DESIGN PARAMETERS OF INTERSECTION
21 st Century Committee Report Recommendations NC 73 Council of Planning Annual Meeting January 22, 2009.
World Bank Transport Team April 16,  Background  World Bank assistance program  Opportunities and way forward 2.
Energy Performance Contracting Approach David Birr President Synchronous Energy Solutions.
COLORADO PERSPECTIVE Cathy Shull Board of Directors Ports-to-Plains Alliance.
Less Stop More Go EXPRESS LANES Travel Choices and Strategies to Relieve Congestion Presentation to FDOT’s Annual ITS Working Group Meeting March 2008.
Determining Innovative Contracting Methods to Reduce User Costs Stuart Thompson Utah Technology Transfer Center.
Public Involvement Meeting June 11,  Introduce the project  Provide history and current status of the project  Explain the benefits of the project.
ROADS IN UKRAINE 1. 2 SECTOR INFORMATION  Ukraine has significant potential for motorway development due to its location on the intersection of multiple.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
Steven C. Braun, P.E. Senior Project Manager. A Master Plan identified a Locally Preferred Alternative (LPA) for the corridor … This LPA was adopted by.
Rural Intersection Conflict Warning System (RICWS) Design-Build Project.
TOWN OF CALEDON Identifying Strategic Employment Lands along the GTA West Corridor – an OPPORTUNITY Open House Presentation June 29, 2015.
MnDOT-ACEC Annual Conference March 5,  Capital planning and programming at MnDOT  Major considerations  A more transparent and collaborative.
A New Paradigm for Utility Coordination Kenny Franklin INDOT Director of Utilities and Railroads.
Quantifying Transportation Needs and Assessing Revenue Options: The Texas Experience presented to The Arkansas Blue Ribbon Committee on Highway Finance.
Iraq Finance 2012 Public Private Partnerships Abraham Akkawi September 18, 2012.
1 COUNTRY REPORT KEC TECHNICAL TRAINING PROGRAMME, 2011.
Ministry of Transportation Ontario Road Builder’s Association October 20, 2011 Central Region Highway Program.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
Financing and regulating highway construction in Scandinavia – experiences and perspectives Svein Bråthen Molde University College
Grade separation.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Transportation and Transit Committee 4 December 2002 Albion Road Corridor Study.
3000 Connecticut Avenue, N.W., Suite 208 Washington, DC
Tom Norton, Executive Director Colorado Department of Transportation American Association of State Highway and Transportation Officials September 9, 2003.
TRACECA CONSTRUCTION OF INTERMODAL TERMINAL IN THE REGION OF RUSE CITY BULGARIA Infrastructure Working Group Kiev, 11 May 2011.
20 mph - The Cambridge Experience John Richards Acting Project Delivery & Environment Manager.
PUBLIC–PRIVATE PARTNERSHIP (PPP) FRAMEWORK AND GUIDELINES Syed M. Ali Zaidi, P.Eng. PM(Stanford), Ph.D. Director, Strategic Partnerships Alberta Infrastructure.
1 MnDOT Metro District Proposed Transportation Improvement Program (TIP) Amendment Metropolitan Council January 17, 2007.
I Wear My “Safety” Glasses at Night: Maximizing Planning Tools to Reduce Utility Construction Costs and Headaches 95 Th Annual Conference Raleigh, NC November.
DELIVERING ECONOMIC INFRASTRUCTURE USING PUBLIC PRIVATE PARTNERSHIPS – CAN TRANSPORT SHOW THE WAY? The OECD estimates that $53tn of investment is required.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 9 January 19, 2016.
© 2014 HDR, Inc., all rights reserved. North Country Access Improvements Stakeholder Advisory Committee Meeting No. 6 October 6, 2015.
Design-Build in Minnesota Minnesota Department of Transportation.
City of Joliet - Sustainability City of Joliet Sustainability Initiatives American Planning Association National Conference April 16, 2013.
PASEO WEST COMMUNITY IMPROVEMENT STRATEGY. P LAN B OUNDARIES North: I-29/35 South: I-70 East: The Paseo West: I-70/71 Highway.
Simon Amor Asset Development Manager
Freight Railway Integration Strategy For Inter-American Development Bank Transport Week 2009 by Transportation Technology Center, Inc. (TTCI) Subsidiary.
In Numbers Strength COLORADO TRANSPORTATION FUNDING.
Rebuilding our regional centres in the context of the NDRRA Matt Bradbury, Partner Ben Yeoh, Senior Associate 11 October 2012.
Waterdown Road Corridor Class Environmental Assessment (Phase 3 & 4) Community Services Committee May 9, 2012.
Industry Briefing 25 May 2016.
Technical Issues Design Status Due Diligence Materials Tony DeVito, Project Director Jan. 28, 2016 I-70 East Project.
Presentation Notes:  Purpose  Educate the audience on the benefits of implementing automated traffic enforcement technology  Audience  Government officials.
Stage 2 Light Rail Transit Program “In the ground ready”
Changes and Benefits brought from Modern Procurement to Bridge the Infrastructure Gap Remo Bucci, P.Eng Infrastructure and Capital Projects October 27,
Fordham at Columbia as a Grade-Separated Intersection
KEYNOTE STAGE SPONSOR.
The Oregon Approach to Innovation in Infrastructure
Arizona Public Service Company 2012 Renewable Energy Standard Implementation Plan Arizona Corporation Commission Open Meeting August 17, 2011.
Road Safety in Azerbaijan: Challenges and Way Forward
Fordham at Columbia as a Grade-Separated Intersection
3 November 2017 Fraserburgh and Peterhead to Aberdeen Strategic Transport Study: STAG Part 1 Plus Bob Nicol: Project Director David Murtagh: Project Manager.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

Regina Bypass Project Information Session

Saskatchewan.ca Outline Background –The need for a bypass –Selecting the route –P3 delivery and procurement Current Status –Construction schedule –Traffic safety during construction

Saskatchewan.ca The Need TOWER ROAD PILOT BUTTE ACCESS ROAD HIGHWAY 48 HIGHWAYS 46 (BALGONIE) HIGHWAY 6 LEGEND: INTERCHANGE BYPASS HIGHWAY 33 Primary issues: Highway 1 East traffic safety Traffic congestion within City of Regina Efficient movement of people and goods Support regional and provincial economy Opportunity to maximize strategic advantage of GTH’s location INTERSECTION

Saskatchewan.ca Anticipated Population Growth

Saskatchewan.ca Municipal Development Plans

Saskatchewan.ca Vehicle Projections

Saskatchewan.ca The Route

Saskatchewan.ca Selecting the Route Endorsed by all 6 municipalities Interchange spacing and traffic operations Other options considered: –Add length and require more structures –Increase costs –Would be used by less traffic Bypass/freeway routes are typically built adjacent to populated area so local traffic can benefit.

Saskatchewan.ca Transparency /Consultation 24 separate open houses/consultation events 1-on-1 meetings with businesses, impacted landowners and other stakeholders Municipal governments actively involved on all steering committees Un-redacted engineering studies available on MHI’s web site Procurement documents and VFM analysis to be released by end of the calendar year “We found that the Ministry actively sought input from the public and stakeholders throughout the process.” “We did not find evidence of undue influence of third parties (e.g., landowners) during this selection process.” - Provincial Auditor, 2014 Report Volume 2

Saskatchewan.ca P3 Delivery The Bypass is being delivered under a “Design, Build, Finance, Maintain, Operate” model –Ownership of all infrastructure is maintained by the province throughout the project –Contract includes rehabilitation Regina Bypass Partners was selected through a competitive process. –5 groups responded to the RFQ; 3 groups were shortlisted asked to submit full proposals. –The lowest bid that met all technical requirements was selected

Saskatchewan.ca Advantages Faster –Most overpasses on Highway 1 East open in late 2017 –Remainder of the project complete in 2019 – at least 6 years sooner than through traditional delivery –Traditional delivery could crowd out other investments Better –Significant opportunities to drive innovation in design, construction and operation and maintenance –Annual payments tied to performance Lower Cost –Fixed price contract means all costs – design, construction, operation, maintenance, rehabilitation, financing – are locked in for 34 years –Risk transfer - taxpayers protected from cost overruns and unforeseen inflation –VFM assessment shows $380 million, or 17% savings over traditional delivery

Saskatchewan.ca Project Costs Total cost of $1.88 billion includes: –Capital construction and repaving of Highway 1 East, –Utility moves –Operations and maintenance for 34 years –Rehabilitation of all infrastructure prior to handback –Financing Construction costs are in line with estimates (including additional overpasses at Hill Ave. and 9 th Ave. N.) Economic impact is estimated 8,200 jobs during construction phase –5 Saskatchewan-based companies are already engaged in the very early stages of the project and RBP has started developing relationships with First Nations

Saskatchewan.ca 66.4 km of 4 lane highway 54.5 km of service roads 12 interchanges 2 full intersections 4 Rin/Rout intersections 1 Rin/Rout for emergency vehicles only 1 Median crossing for emergency vehicles only TOWER ROAD PILOT BUTTE ACCESS ROAD HIGHWAYS 46 (BALGONIE) HIGHWAY 6 HIGHWAY 33 Construction Phasing Completion: Currently 6 signalized intersections plus numerous Rin/Rout intersections and ramps on Victoria Ave between Tower Road and Ring Road. At completion there will only be 6 at- grade access points on the Bypass’ entire route

Saskatchewan.ca Traffic Safety During Phase 1 Immediate safety measures: –Uniform 80 km/h speed limit from Balgoine to Regina –Installation of construction signs including electronic message boards –Clean up sign “clutter” –Better pavement marking Site-specific traffic accommodation plans under development Stakeholder engagement –Public meetings –On-going meetings with municipal officials and other key stakeholders –Similar approach will be taken during Phase 2

Saskatchewan.ca About Traffic Signals Traffic signals are not a cure-all. Traffic signals do not necessarily reduce collisions and may result in an overall increase in collisions. The major intersections on Highway 1 East average 2.5 collisions per year, per intersection. –Expected decreases in right angle collisions could be more than offset by an increase in rear-end collisions Hwy 2 at Township Rd 723, Grand Prairie -This intersection is in a highly developed commercial/ light industrial are on the urban fringe north of Grand Prairie. ADT = 16,000 vpd -Since signals were installed in 2008, there has been a 60 per cent increase in collisions, a 600 per cent increase in rear-end collisions, a 50 per cent decrease in right- angle collisions and no reduction in severity

Saskatchewan.ca Questions?