Air Resources Board California Environmental Protection Agency CCOS STATUS REPORT Policy Committee Meeting Saffet Tanrikulu, Ph.D. October 25, 2002.

Slides:



Advertisements
Similar presentations
OThree Chemistry Modeling of the Sept ’00 CCOS Ozone Episode: Diagnostic Experiments—Round 2 Central California Ozone Study: Bi-Weekly Presentation.
Advertisements

An Update on the Activities of the Western Regional Air Partnership ‘WRAP v2.0’ Robert Kotchenruther, Ph.D. NW-AIRQUEST June, 2011.
OThree Chemistry MM5/CAMx Model Diagnostic and Sensitivity Analysis Results: Base B and Emissions Sensitivities Central California Ozone Study: Bi-Weekly.
MODELING CHEMICALLY REACTIVE AIR TOXICS IN THE SAN FRANCISCO BAY AREA USING CAMx Chris Emery, Greg Yarwood and Ed Tai ENVIRON International Corporation.
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS Technical Scope of Work: Tom Moore, WESTAR/WRAP on behalf of University.
Clark County Regional Ozone and Precursor Study (CCROPS) Robert A. Baxter, CCM T&B Systems Clark County Air Quality Forum – 03/14/06.
National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology Tropospheric Emission Spectrometer Evaluating.
AgTech Committee Agricultural Research Projects Request for Direction by the Study Agency San Joaquin Valleywide Air Pollution Study Agency.
October 17, 20065th Annual CMAS Conference1 Photochemical Modeling Investigation of an Extended Winter PM Episode in Central California 1. Air Resources.
1 Pollution Transport from Other Air Basins San Joaquin Valley Air Pollution Control District September 20, 2007.
Krish Vijayaraghavan, Prakash Karamchandani Christian Seigneur AER San Ramon, CA 3rd Annual CMAS Models-3 Conference October 18-20, 2004 Chapel Hill, NC.
1 CCOS Seasonal Modeling: The Computing Environment S.Tonse, N.J.Brown & R. Harley Lawrence Berkeley National Laboratory University Of California at Berkeley.
New Jersey Clean Energy Program 2012 Programs and Budgets Applied Energy Group Presentation to the New Jersey Board of Public Utilities November 3, 2011.
Water Supply Planning Initiative State Water Commission November 22, 2004.
November 15, 2006CRPAQS TC Meeting1 Photochemical Modeling Investigation of an Extended Winter PM Episode in Central California 1. Air Resources Board,
2004 Workplan WRAP Regional Modeling Center Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris, ENVIRON Corporation Zac Adelman,
Importance of Lightning NO for Regional Air Quality Modeling Thomas E. Pierce/NOAA Atmospheric Modeling Division National Exposure Research Laboratory.
OThree Chemistry MM5/CAMx Model Diagnostic and Sensitivity Analysis Results: Continued Diagnostics and PA Central California Ozone Study: Bi-Weekly Presentation.
Modeling Overview For Barrio Logan Community Health Neighborhood Assessment Program Andrew Ranzieri Vlad Isakov Tony Servin Shuming Du October 10, 2001.
1 CCOS Update November 3, 2006 PC Meeting Project Status –Completed Projects Results –On-Going Projects Status Plan for CCOS Final Phase –Guiding Principles.
Estimating Biogenic VOC Emissions for the SCOS Domain Using the BEIGIS Model Michael Benjamin & Klaus Scott California Air Resources Board SCOS97 regional.
Transportation Improvement Program Status and Update.
You are here.. Kern Council of Governments PM 10 Control Measures Workshop: Identifying the Best Available Control Measures to Local Government for Mobile.
1 Overview Community Health Modeling Working Group Meeting Planning and Technical Support Division August 27, 2003 Air Resources Board California Environmental.
1 Neil Wheeler, Kenneth Craig, and Clinton MacDonald Sonoma Technology, Inc. Petaluma, California Presented at the Sixth Annual Community Modeling and.
WRAP Update WESTAR Meeting San Francisco April 25, 2011.
Cluster Analysis of Air Quality Data for CCOS Study Domain Ahmet Palazoglu, PI University of California, Davis, CA Presented by Scott Beaver Bay Area Air.
Air Resources Board California Environmental Protection Agency Ozone SIP Schedule and CCOS Products Policy Committee Meeting John DaMassa April 18, 2002.
Preliminary Study: Direct and Emission-Induced Effects of Global Climate Change on Regional Ozone and Fine Particulate Matter K. Manomaiphiboon 1 *, A.
VISTAS Emissions Inventory Overview Nov 4, VISTAS is evaluating visibility and sources of fine particulate mass in the Southeastern US View NE from.
OThree Chemistry MM5/CAMx Model Diagnostic and Sensitivity Analysis Results Central California Ozone Study: Bi-Weekly Presentation 2 T. W. Tesche Dennis.
Ozone Update Ben Wells U.S. Environmental Protection Agency Office of Air Quality Planning and Standards Air Quality Analysis Group February 11, 2014.
1 SJVAPCD DRAFT SCHEDULES May 2, Hr OZONE ATTAINMENT DEMONSTRATION PLAN PM10 ATTAINMENT DEMONSTRATION PLAN.
MWAQC Work Program and Budget FY 2006 Joan Rohlfs, Chief, AQ Planning MWAQC April 27, 2005 ITEM 7.
January 24, Update to CCAQS PC Final Projects for CCOS & CRPAQS.
October 1-3, th Annual CMAS Meeting1 Effects of Liquid Water on Secondary Inorganic Aerosol in Central California During a Winter Episode 1 Planning.
CCOS Status Report February 6, 2004 Policy Committee Meeting.
Quality Assurance Procedures for CCAQS Data Part 1 - QA of Field Measurement Data Part 2 - QA of Emissions Data.
Template Update on Progress of FY12-13 Work Plan Activities Presentation to the NETAC Policy and Technical Committees Sue Kemball-Cook and Greg Yarwood.
Statewide Protocol: Regional Application August 27, 2003 Air Resources Board California Environmental Protection Agency Luis F. Woodhouse.
NRCS STATE TECHNICAL COMMITTEE FY13 NITROGEN/AMMONIA AIR QUALITY INITIATIVE _____________________________ OCTOBER 23, 2012 Phyllis Woodford Environmental.
U.S. EPA and WIST Rob Gilliam *NOAA/**U.S. EPA
Modeling Regional Haze in Big Bend National Park with CMAQ Betty Pun, Christian Seigneur & Shiang-Yuh Wu AER, San Ramon Naresh Kumar EPRI, Palo Alto CMAQ.
October 1-3, th Annual CMAS Meeting1 Impacts of Ethanol Fuel on PM Concentrations in Northern California during a Winter Episode 1 Planning and Technical.
Effects of Emission Adjustments on Peak Ground-Level Ozone Concentration in Southeast Texas Jerry Lin, Thomas Ho, Hsing-wei Chu, Heng Yang, Santosh Chandru,
Three-State Air Quality Study (3SAQS) Three-State Data Warehouse (3SDW) 3SAQS/3SDW Progress Review to the 3SAQS Technical Committee University of North.
1 MANE-VU Modeling Plans Inter-RPO Modeling Meeting May 25, 2004 Shan He, Emily Savelli, Jung-Hun Woo, John Graham and Gary Kleiman, NESCAUM.
1 Overview Community Health Modeling Working Group Meeting Tony Servin, P.E. Modeling Support Section Planning and Technical Support Division May 6, 2003.
Air Resources Board California Environmental Protection Agency OZONE SIP MODELING and DATA ANALYSIS Policy Committee Meeting John DaMassa Saffet Tanrikulu.
1 Open Discussion Technical Challenges for Statewide Application Tony Servin, P.E. Modeling Support Section Planning and Technical Support Division May.
Western Regional Air Partnership Regional Modeling Center 2004 Draft Workplan Prepared by: Gail Tonnesen, University of California Riverside Ralph Morris,
1 Final Regulation Order for Truck and Bus Regulation California Environmental Protection Agency Air Resources Board November 20, 2014.
SIP Modeling Inventories Based on CCOS episodes (year 2000) SIP Gridded Inventory Coordination Group provided a forum for discussing inventory issues as.
Research for Estimating Airborne Emissions from Dairies in California Presentation for CCOS Policy Committee June 26, 2002 Fresno Patrick Gaffney California.
W. T. Hutzell 1, G. Pouliot 2, and D. J. Luecken 1 1 Atmospheric Modeling Division, U. S. Environmental Protection Agency 2 Atmospheric Sciences Modeling.
Central California Air Quality Study Modeling Center CCOS/CRPAQS Technical Committee Meeting Saffet Tanrikulu, Ph.D., BAAQMD James Sweet, SJVAPCD November.
Strategic Plan Development Status Technical Analysis Forum meeting October 11, 2007.
1 DRAFT Report for Air Quality Analysis on Cumulative Emissions, Barrio Logan Tony Servin, P.E. Modeling Support Section Planning and Technical Support.
Nancy J. Brown, LBNL Kick-off of the CEC Seasonal Modeling Study Sacramento, August A Seasonal Perspective on Regional Air Quality in Central California.
Center for Environmental Research and Technology/Air Quality Modeling University of California at Riverside CCOS 2000 Model Intercomparison: Summary of.
BAY AREA MODELING Status of Modeling Work Technical Committee Meeting November 18, 2003 Bay Area Air Quality Management District and Environ Corp.
Comparisons of the Response of Simulated Ozone Concentrations to Changes in Emissions Using the Carbon Bond IV and SAPRC99 Chemical Mechanisms Bruce Jackson,
CALIFORNIA ENERGY COMMISSION 1 Seasonal Modeling Project PI - Nancy Brown, LBNL Nicole Davis CEC Project Manager Kick Off Meeting CCOS Technical Meeting.
WRAP Regional Modeling Center, Attribution of Haze Meeting, Denver CO 7/22/04 December WRAP Modeling Forum Conf Call Call Information: December 20, 1pm.
Status Report on the Role of Ammonia in the San Joaquin Valley December 11, 2003 Air Resources Board California Environmental Protection Agency.
1 Meeting on Issues Relating to the California Phase 3 Reformulated Gasoline Regulations California Environmental Protection Agency Air Resources Board.
Air Resources Board California Environmental Protection Agency March 13, 2003Presentation to the Policy Committee1 Ozone SIP Modeling and Data Analysis:
CRC NARSTO-Northeast Modeling Study
Polk Transportation Planning Organization April 14, 2011
Overview of WRAP 2014 Platform develop and Shake-Out project update
Presentation transcript:

Air Resources Board California Environmental Protection Agency CCOS STATUS REPORT Policy Committee Meeting Saffet Tanrikulu, Ph.D. October 25, 2002

CCOS Status Report Presentation overview Progress of ongoing projects Status of overall CCOS projects Schedule Consent contract Seasonal modeling

CCOS Status Report Progress of ongoing projects QA/QC of field data Data analysis Meteorological modeling Emissions inventory development Air quality modeling

CCOS Status Report QA/QC of field data QA/QC of entire database-DRI Additional QA/QC of episode periods July 30-August 2, 2000 September 17-20, 2000 June 14-15, 2000

CCOS Status Report Data analysis Data analysis continues T&B Systems UC (overhead problem)

CCOS Status Report Meteorological modeling July-August episode simulated by NOAA- MM5, NoFDDA Investigative simulations to follow FDDA file is being prepared September episode to follow RAMS effort Other episodes to follow August 3-6, 1990 and June 14-15, 2000

CCOS Status Report Emissions inventory development On-Road emissions inventory-EMFAC 2002 Biogenic emissions-BEIGIS Other emissions-CEIDARS Day specific inventory for July-August and September episodes ARB prepares CCOS emissions inventory Inventory development coordinated with districts Assistance provided by AG

CCOS Status Report Air quality modeling Model evaluation and comparison in progress- UCR Grid resolution tested SAQM, CMAQ and CAMx CBM-IV and SAPRC chemical mechanisms evaluated

CCOS Status Report Consent contract Convert/Audit SAQM for the CCOS domain

CCOS Status Report Status of overall CCOS projects A draft report submitted by DRI For each project –Description –Objectives –Benefits –Budget and priority by TC

CCOS Status Report Status of overall CCOS projects (Cont.) Projects are grouped in 4 tables Table 1-Preliminary data analysis and EI projects Table 2-Data analysis, EI and modeling projects Tables 1&2 provide information for the ongoing SIP Table 3-Additional CCOS projects Table 4-Deposition study

CCOS Status Report Seasonal modeling Benefits Model evaluation for both high and low ozone days Modeling information for 8-hour SIP Approaches for PM 2.5 modeling Provide information on data needs for modeling and analysis

CCOS Status Report Seasonal modeling (Cont.) Potential participants Meteorological modeling-NOAA Emissions inventory development-ARB, UCB Air quality modeling-CRPAQS, UCB Model evaluation-UCB

CCOS Status Report Seasonal modeling (Cont.) Funding needed ($unknown)-DOE, CRPAQS- CCOS Schedule-Complete December 2004 TC recommends this project to be included in Table 3 Refined work statement and budget in preparation PC’s approval is requested to continue working on this project