Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access.

Slides:



Advertisements
Similar presentations
State University – Higher School of Economics
Advertisements

ICT research priorities and recommendations for strategy development in the WBC Ulrike Kunze / PT-DLR, Germany Consultation session on recommendations.
Information about the Integrated Infrastructures Initiatives (I3) instrument Daniel Pasini EC, DG Research, Unit B3 – Research Infrastructures EC, Brussels,
Information and Communication Technologies (ICT) in the Seventh Framework Programme Support actions.
HORIZON 2020: FINANCIAL ISSUES
Data without Boundaries project A short overview of outputs & future perspectives Roxane Silberman DwB coordinator ESS workshop, Luxembourg September,
Episode 3 / CAATS II joint dissemination event Lessons Learnt Episode 3 - CAATS II Final Dissemination Event Philippe Leplae EUROCONTROL Episode 3 Brussels,
R&D in statistics An Update. R&D in statistics DOSIS SUP.COM 5th Framework Programme 1st Call Tools & Methods Applications.
DR MACIEJ JUNKIERT PRACOWNIA BADAŃ NAD TRADYCJĄ EUROPEJSKĄ Guide for Applicants.
Provisional FP7-ICT InfoDay, Torino, 11/12/ The ICT Theme in FP7 How to submit a proposal 2. The Funding schemes.
Provisional draft The ICT Theme in FP7 Submission and Evaluation (preliminary information) ICT-NCP Information Day 19 th October 2006.
National Science Foundation: Transforming Undergraduate Education in Science, Technology, Engineering, and Mathematics (TUES)
Tryggve project developing services for sensitive biomedical data: Call for Nordic use cases NeiC 2015 Conference Workshop on sensitive data Antti Pursula.
Networks ∙ Services ∙ People John DYER TF-MSP Video Conference Community Procurement Support Building on the SPOT-ON Proposal Smart Procurement,
TUTORIAL Grant Preparation & Project Management. Grant preparation What are the procedures during the grant preparations?  The coordinator - on behalf.
3 rd Data without Boundaries Training Course EU‐SILC longitudinal component Paris, February 2014.
2 nd Data without Boundaries Training Course Bucharest, February 2013.
Integrated European Census Microdata 5 th DwB Training, Barcelona, January 2015.
IST Programme project IST CELEBRATE Context e-Learning with Broadband Technologies.
End User End User Product/ Service Product/ Service Commercial Prototype Commercial Prototype Technical Prototype Technical Prototype Applied Research.
EXPECTATIONS OF TURKISH ENVIRONMENTAL SECTOR FROM INSPIRE Ministry of Environment and Forestry June, 2010 Özlem ESENGİN Ahmet ÇİVİ Tuncay DEMİR.
The Preparatory Phase Proposal a first draft to be discussed.
EGI-Engage EGI-Engage Engaging the EGI Community towards an Open Science Commons Project Overview 9/14/2015 EGI-Engage: a project.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
1 INFRA : INFRA : Scientific Information Repository supporting FP7 “The views expressed in this presentation are those of the author.
WP7 - Architecture and implementation plan Objectives o Integrating the legal, governance and financial plans with technological implementation through.
EPOS Preparatory phase Torild van Eck (ORFEUS) Call INFRA Deadline: December 3, 2009 Funding: between 3 and 6 MEuro Duration: max 4 year.
Implementation Instruments for FP6 Thematic Priorities Joseph Prieur - Aeronautics DG Research- Space &Transport.
EGIDA PROJECT 1stJoint Workshop of the EGIDA Stakeholder Network and Advisory Board Connecting GEOSS and its Stakeholders in Science.
1DEN/DSOE Romania september 2006 HOTLABSSA “The EU 6 th FP Support Specific Action HOTLABSSA: a new step towards an European Network on Hot Laboratories”
IST4Balt Training Course on FP6 and IST Version 2.0, 30/05/20061 IST4Balt Training Course “The Sixth Framework Programme (FP6) of the European Community.
TESTBED FOR FUTURE INTERNET SERVICES TEFIS at the EU-Canada Future Internet Workshop, March Annika Sällström – Botnia Living Lab at Centre for.
Dr. Cecilia Blasetti - Elettra ST Elettra I3 IA-SFS Managing team Role of scientific background Dr. Cecilia Blasetti Elettra - Sincrotrone Trieste iii.
CLARIN work packages. Conference Place yyyy-mm-dd
Transboundary Trust Space February 16, 2012 Ensuring trust in information exchange – proposal and approaches from Russia and CIS-states (RCC states) National.
Participation in 7FP Anna Pikalova National Research University “Higher School of Economics” National Contact Points “Mobility” & “INCO”
EVA Workshop, 26 March 2003, Florence, Italy1 COINE Cultural Objects In Networked Environments Anthi Baliou University of Macedonia,Library Thessaloniki,
Jamie Hall (ILL). SciencePAD Persistent Identifiers Workshop PANData Software Catalogue January 30th 2013 Jamie Hall Developer IT Services, Institut Laue-Langevin.
1 Direction scientifique Networks of Excellence objectives  Reinforce or strengthen scientific and technological excellence on a given research topic.
End Station A Test Beam (ESTB) Carsten Hast and Mauro Pivi August 23 th 2012 Proposals, Procedures, Schedule.
Danish Agricultural Advisory Service National Centre Possibilities and limits in a Specific Support Action By Erik Fog and Michael Tersbøl, DAAS European.
© 2004 NMI31 Integrated Infrastructure Initiatives I3: A brief introduction Integrating projects for a common type of Research Infrastructure.
PaNdata ODI Open Data Infrastructure INFRA : Data infrastructures for e-Science PaNdata-ODI will develop, deploy and operate an Open Data Infrastructure.
PanDATA Meeting DESY, June 18/ , WP2/Access O. Schwarzkopf, H.J. Weyer USER ACCESS IRUVX /WP2 + ESRFUP /WP9 PanDATA Meeting/ DESY June 18/
7 December 2007CERN-EU Office1 Svet Stavrev Office of EU Relations, CERN First FP7 Call for Integrating Activity projects*  IA as support to existing.
TIARA – WP6 Involving Industry in TIARA Lucio Rossi (WPD) CERN.
Consumers, Health, Agriculture and Food Executive Agency 3rd Health Programme The Electronic Submission System (JA 2015) Georgios MARGETIDIS.
EGI TF meeting 14th September EGI TF Jean-François Perrin - / Presentation John White -
ERA-Instruments Thomas Gübitz, Johannes Janssen, Christian Renner, Bonn, 4 Februar 2008 Infrastructure Funding in the Life Sciences.
WP leaders meeting R. Aleksan October 5 th, 2009 TIARA 1.Objectives 2.General Context 3.Building TIARA 4.Conclusion.
E-infrastructure requirements from the ESFRI Physics, Astronomy and Analytical Facilities cluster Provisional material based on outcome of workshop held.
2. The funding schemes ICT Proposer’s Day Köln, 1 February 2007 The ICT Theme in FP7 How to participate to ICT in FP 7.
Capacity Building in: GEO Strategic Plan 2016 – 2025 and Work Programme 2016 Andiswa Mlisa GEO Secretariat Workshop on Capacity Building and Developing.
© The InfoCitizen Consortium Project Presentation Agent based negotiation for inter- and intra-enterprise coordination employing a European Information.
European Small-Scale Accelerator Facilities S. Harissopulos: NuPECC Strategy Meeting, Darmstadt, January 16, 2016.
Frank Schipplick Work Package Coordinator WP1 - eSignatures.
System Overview Training on the use of the new countrystat
Work Package 2 TECHNOLOGICAL HARMONISATION Reporting period
System Overview Training on the use of the new countrystat
Research and Innovation Staff Exchange
Eurostat D2 – Regional Indicators and Geographical Information
System Overview Training on the use of the new countrystat
Insights on industrial usage from NMI3 and SINE 2020
Anja Burghardt, Institute for Employment Research (IAB)
WP7 – COMBINING BIG DATA - STATISTICAL DOMAINS
e-Invoicing – e-Ordering 20/11/2008
ITDG meeting of of October 2011
Juan Gonzalez eGovernment & CIP operations
ESS.VIP Validation Item 5.1
Legislative strategy for cross-cutting ESS legislation
Presentation transcript:

Thomas Gutberlet HZB User Coordination NMI3-II Neutron scattering and Muon spectroscopy Integrated Initiative WP5 Integrated User Access

2 THEME INFRA Infrastructures for Neutron Scattering and Muon Spectroscopy Project acronym:NMI3-II Project full title: Neutron Scattering and Muon Spectroscopy Integrated Initiative Grant agreement no: Starting date: 01/02/2012 The Integrated Infrastructure Initiative for Neutron and Muon Spectroscopy (NMI3) aims at a pan-European integration of the main actors within this area. NMI3 is a comprehensive consortium of 18 partners from 11 different countries that includes all major providers of neutrons and muons in Europe. NMI3 exploits all tools available within I3s to realize its objectives. -Transnational Open Access -Joint Research activities -Networking activities to reinforce integration by harmonizing procedures, setting standards and disseminating knowledge.

3

4

5 NMI3-II WP5: Integrated User Access In order to structure and harmonize an integrated access format to European national neutron and muon facilities for the scientific users an ‘Integrated User Access (IUA)’ Networking Activity should consider and develop strategies and forms for a common integrated user registration harmonized proposal forms and templates optimized peer review processes and possible platforms for cross source beam time access. In addition, better statistical survey on European user access could be possible.

6 NMI3-II WP5: Integrated User Access Task 5.1: Organization and management of the networking activity. Task 5.2: Development of a generalized integrated user registration. Task 5.3: Harmonized proposal forms and templates. Task 5.4: Web based proposal peer review process. Task 5.5: Platforms for cross source independent beam time access.

7 NMI3-II WP5: Integrated User Access Task 5.3: Harmonized proposal forms and templates Presently each neutron or muon facility uses different forms and templates to gather the information that is required in a proposal form. On the other hand this information is quite similar and typically consists of (i)a scientific description and justification of the proposed experiment typically with a couple of figures, (ii)an experimental part with the justification for a certain required instrument and the description of the requested instrumental parameters, (iii)a detailed description of the samples. In many cases this must be complemented by additional information regarding (iv)safety aspects of the samples under investigation and/or the experiment itself (e.g. delicate sample environment devices). The aim of Task 5.3 is to compare the existing proposal forms and to aim for a common set of information that is used as standard at the participating facilities. A suggestion for such a harmonized proposal template will be developed.

8 Task 5.3: Harmonized proposal forms and templates For application of beamtime users are requested to submit a facility specific proposal to the facility. These forms usually have various items in common, but also facility dependent requirements, proposers have to fill in or answer. In order to simplify and streamline current proposal forms for the users, a harmonized proposal form is suggested based on current existing forms at the participating facilities. The suggested harmonized proposal form could be a general accepted template with possible extensions for facility specific questions within the proposal requested. The harmonized proposal form consists of three main parts: General part Technical part Scientific part NMI3-II WP5: Integrated User Access

9 Existing proposal forms

10 Existing proposal forms

11 Existing proposal forms

12 Harmonized proposal form

13 Harmonized proposal form

14 Harmonized proposal form

15 Technical implementation and exchange options Proposals are submitted to individual facilities Harmonized forms allow exchange of proposals between facilities either via -User action (copy/paste) -Upload functions -Central database -Umbrella Harmonized proposal form

16

17 NMI3-II WP5 Integrated User Access Task 5.4: Web based proposal peer review process. A framework will be developed to allow peer reviewing of submitted pro- posals within NMI3 web applications for small facilities, which do not operate an individual DUO. Task 5.5: Platforms for cross source independent beam time access. Platforms to submit proposals for access by the combination of instru- ments at the NMI3 facilities and platforms for cross source proposals for the complementary use of instruments, laboratory services or infrastruc- tures using different probes (e.g. neutron, muons, x-rays, facility based AFM or electron microscopy) will be considered and developed (e.g. by block allocation strategies or send in sample programs across sources).

18 NMI3-II WP5 Integrated User Access D5.1. Report on requirements: Survey on existing comparable systems and report on requirements and framework for common data exchange [month 12] D5.2. Software package prototype I: Software package prototype to handle integrated user registration [month 24] D5.3. Software package prototype II: Software package prototype to handle proposal submission and reviewing between facilities [month 48] D5.4. Harmonized proposal forms: Report on suggestion on harmonized proposal forms and appropriate templates [month 36] D5.5. Requirements for web based review process: Report on requirements for web based review process [month 12] D5.6. Prototype of web based review process: [month 36] D5.7. Requirements for cross facility beam time access: Report on requirements for cross facility beam time access and strategy for implementation [month 24] D5.8. Feasibility study on software prototype: Feasibility study on software prototype for cross facility beam time access [month 48]

19 NMI3-II WP5 Integrated User Access Task 5.2 Evaluation of a generalized integrated user registration. Technical and legal requirements for a common NMI3 based single electronic user ID to access individual facility digital user office (DUO) systems will be analyzed and the best possible solution will be evaluated and established as a prototype. Requirements for this are: Survey and assessment of systems existing or planned within NMI3 or by other communities, e.g. IRUVX (EUROFEL), PanData, CRISP etc. Definition of the working rules of the NMI3 system and of procedures to exchange data between facilities. Development and distribution of a software package prototype and tools to setup a user system that operates with the rules defined enabling the procedures for submission and reviewing of proposals. Development of a common NMI3 information portal for participating users that will facilitate them to submit and transfer proposals between participating sources. Option to register to workshop, schools and other activities within the NMI3 consortium.

20 NMI3-II WP5 Integrated User Access Task 5.4: Web based proposal peer review process A framework will be developed to allow peer reviewing of submitted proposals within NMI3 web applications for small facilities, which do not operate an individual DUO. Task 5.5 Platforms for cross source independent beam time access. Platforms to submit proposals for access by the combination of large scale instruments at dedicated NMI3 facilities and platforms for cross source proposals for complementary use of instruments using different probes (e.g. neutrons, muons or x-rays) will be considered and explored. The complementary use requested is not restricted to large scale instruments operated by the NMI3 facility but would also allow users to apply for use of special lab services offered by the NMI3 partner. Advice for the most appropriate instrument could be given to the users by instrument scientists. A feasibility study to implement appropriate platforms within NMI3 will be prepared. Results will take into account comparable efforts by other communities (e.g. CRISP).