Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007.

Slides:



Advertisements
Similar presentations
ERA-NET 1 REPORTING REQUIREMENTS. ERA-NET 2 Contract The contract for an ERA-NET is a contractual link of all participants with the Commission defines.
Advertisements

Project reporting in FP6 Guidance notes for Integrated Projects, Networks of Excellence, Specific Targeted Research Projects, Coordination Actions.
Characteristics of projects in EU research programmes
Additional information on project management
Enabling Access to Sound Archives through Integration, Enrichment and Retrieval WP1. Project Management.
European Commission DG for Fisheries and Maritime Affairs Research & scientific analysis SSP Kick-off meeting The 6 th Framework Programme
PREPARE Final reporting period Months February 2013 to 31 July 2014.
Sustainable Energy Systems Overview of contractual obligations, procedures and practical matters KICK-OFF MEETING.
INGAS General Assembly, Oulu, 25&26 May 2011 INGAS INtegrated GAS Powertrain 1 INGAS 30 months meeting Oulu, 25&26 of May 2011 General Assembly Coordinator.
GENIUS T4 - September 2014 GENIUS T4 Teleconference X. Luri.
KM3NeT, , Pylos © FIM-NewLearning 2007 KM3NeT Management & Reporting Dr. Roland Klein Project Office KM3NeT
Reporting in FP7 Ref. 21 – Susanne Neufeldt – Reporting in FP 7 Susanne Neufeldt M.A. EU-Projects Manager Christian-Albrechts-Universität.
UPP - Understanding Privatization Policy Management and organizational issues Luca Farinola 24/02/2006.
ACCEPT project Grant Agreement FP7-SSH-2009-A.
Development of an Operational Plan for Environmental Protection from Industrial Dusts in Russia and other NIS (ENPRODUS) Managerial Issues.
JERICO KICK OFF MEETINGPARIS – Maison de la recherche - 24 & 25 May 2011 JERICO PROJECT The contract management Overview By Dominique Guéguen / Ifremer.
Supported by Project Administration Second Project Meeting London, 10/11 March 2009 Liv Becker / Veit Bürger, Öko-Institut e.V.
RTD/E.2/JL1 CARERA THE IMPACT OF CAP REFORM ON THE EMPLOYMENT LEVELS IN RURAL AREAS Kick off meeting CRETE; 16 – 17 March 2006 Martin Greimel Project Officer.
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT Progress / objectives (WP and project level) Progress / milestones (WP and project level) Progress / deliverables.
International Accelerator Facility for Beams of Ions and Antiprotons at Darmstadt FAIR EU Design Study 4th Annual Report meeting February 12, 2009 J. Eschke,
Research Infrastructures Seminar for I3 and CA Project Co-ordinators 12 November 2004, 1 Management and Implementation of I3 and CA Contracts Seminar for.
Reporting requirements (2)
Call ref.: FP ACC-SSA-2 (10/2004) Contract Negotiation - Sofia - Bulgaria 10 February, Mrs Marina ZANCHI DG Research Directorate N International.
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
NOV-3733-SL-9715 Carbones KOM - May 10-11, 2010 – Toulouse, France 1 KICK-OFF MEETING May 10-11, 2010.
TBTIMPACTS SIXTH FRAMEWORK PROGRAMME SPECIFIC TARGETED RESEARCH PROJECT Assessing impacts of TBT on multiple coastal uses TBTIMPACTS Contract no.: INCO-CT
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement Overview of EuCARD-2.
EU-IndiaGrid (RI ) is funded by the European Commission under the Research Infrastructure Programme 1 Project Reporting in FP6:
S L H C – P P Management Tools Kick-off Meeting April 8 th, 2008 Mar CAPEANS CERN This project has received funding from the European.
Coordinating EC Research Projects Paul Drath Singleimage Limited 3 Foundry Walk St Ives Cambs PE27 5FW phone fax
Audit Certificates MariFish Steering Group Meeting 17 th January 2006 Rob Evans Defra Internal Audit.
Ismar Financial and administrative procedures Nearest Kick-off meeting Bologna, 11 October 2006.
European Commission DG for Fisheries and maritime affairs Research & scientific analysis 1 The 6th Framework Programme Project UNCOVER Kick-off.
Annual reports Final report Dr. Cecilia Blasetti Elettra - Sincrotrone Trieste v.
Information on the ANNUAL REPORT OCTOBER 18 th, 2006.
Reporting during the lifetime of the project Moldova – Research Horizon 30 January 2013 Kristin Kraav.
FLAVIUS kick-off meeting Paris Information Society and Media DG Unit E1 Language Technologies, Machine Translation Luxembourg FLAVIUS Kick-Off.
Reporting Guidelines (FP5) Karen Fabbri Scientific Officer Natural & Technological Hazards DG Research European Commission Brussels
Project Reporting for the EuCARD Integrating Activity Project Based on: - Provisions of the Grant Agreement (GA) and its annexes - FP7 Guide on Project.
SOTERIA Reporting May 30, 2011 K.U.Leuven Research & Development Myriam Witvrouw.
SeaDataNet Pan-European infrastructure for Ocean & Marine Data management An Integrated research Infrastructure Initiative (I3) Kick-off Meeting June 8-10.
Volvox Finance 2 How we will manage the Finance Angela Pettit – Contracts Officer.
HiLumi LHC is co-funded by the EU FP7 Capacities Programme, Grant Agreement Svet Stavrev (EU Projects Office, CERN) Administrative Manager 17.
Reporting Kick-Off Meeting in Geneva. Kick-Off Meeting in Geneva: Budget and FinancesSlide Reporting Outline 1.Reports and deliverables 2.Deadlines.
Slide 1 PAO MO75 M. Hugon D:/DATA/POWERPNT/HNML. 0107kickoffconcertedaction ADvanced Options for P&T ADOPT Thematic Network kick-off Meeting.
Role of the Secretariat The Secretariat will be responsible for the co-ordination and enhancement of research and networking activities within MariFish.
“Reporting Procedure for I3” Seadatanet kick-off Heraklion, June 8-9, 2006 Lorenza Saracco, European Commission DG Research.
Mallorca Meeting 2-4 April Workplan MilestonesDeliverables M1.1Pilot tools and methods tested on case study simplified dynamics D1.1Report on the.
Ismar Project management issues the non-scientific side of NEAREST Alessandra Borgatti ASTER Nearest Kick-off meeting Bologna, 11 October 2006.
EPOCA – 11. June EPOCA Project Management (WP1): Deliverables and reporting 11. June 2008.
Administrative matters Katherine Loens. The periodic activity report: Section 1 – Project objectives and major achievements during the reporting period:
STRUCTURE SCIENTIFIC REPORT / MANAGEMENT REPORT −Progress / objectives (WP and project level) −Progress / milestones (WP and project level) −Progress /
INCO 3739 Integrating Multiple Demands on Coastal Zones with Emphasis on Aquatic Ecosystems and Fisheries Third Annual and Final Reporting 4th Project.
Negotiation of Proposals Dr. Evangelos Ouzounis Directorate C DG Information Society European Commission.
Kick-Off Meeting, Barcelona, 7 th November 2012 Management – Practical Matters Paula Newton (EUPORIAS Project Manager) Met Office.
Mathias DEPRETZ – EuroVO-DCA Project Manager Work Package 1 – Management First Board Meeting – 2&3 october 2006 WP1 Management EuroVO-DCA Project FIRST.
HORIZON 2020 Reporting and Payments Legal Basis. Types of payments (Article 21) One pre-financing  € One or several interim payments One payment of the.
TECHNICAL QUALITY MANAGEMENT Technical Quality Management Co-funded by the Prevention, Preparedness and Consequence Management of Terrorism and other Security-related.
Ismar Financial report procedures. Ismar Financial reporting For each reporting period of activity Each partner shall produce a “Periodic Management Report”
FISCO2 – Financial and Scientific Coordination Work Package dedicated to ENSAR2 management WP leader: Ketel Turzó WP deputy: Sandrine Dubromel ENSAR2 Management.
1 FP6 – Financial Management and Reporting 1 April 2006 Sofia, Bulgaria.
UNISEC Universal Influenza Vaccines Secured
Third PMC meeting University of Priština, Kosovska Mitrovica
Annual Report Instructions
FP7 SCIENTIFIC NEGOTIATIONS
Information session SCIENTIFIC NEGOTIATIONS Call FP7-ENV-2013-two-stage "Environment (including climate change)" Brussels 22/05/2013 José M. Jiménez.
Information session SCIENTIFIC & TECHNICAL NEGOTIATIONS Call FP7-ENV-2013-WATER-INNO-DEMO "Environment (including climate change)" Brussels 24/06/2013.
Technical and Financial Reporting
COGAIN Kick-Off 5-6 September, 2004 FINANCIAL GUIDELINES
Presentation transcript:

Advanced Remote Tower 1 13 Nov 2007Malmö/Sturup1 Advanced Remote Tower Administrative processes (WP0.1, WP4.3) Malmö/Sturup 13 Nov 2007

Advanced Remote Tower 2 13 Nov 2007Malmö/Sturup2 Periodic reports Progress report Periodic Activity report Periodic Management report Periodic report on the distribution of the Community´s contribution Final report Mid-term review Project deliverables Management guidelines Where to find all the details regarding the submission of cost claims. When to deliver reports? Reviews

Advanced Remote Tower 3 13 Nov 2007Malmö/Sturup3 Progress reports Project Coordinator deliver Progress reports to the Commission. Mangement Progress reports 1-7, T3, T6, T9, T12, T15, T18 and T21. The Progress reports is based on monthly reports from all contractors. Starts at the end of T2. Templates will be distributed (simplyfied activity and management report, max 2 pages).

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup4 Periodic activity report Will be prepared by the Project Coordinator. T12, (T24) Front page (example in Appendix 3) Publishable executive summary (not needed for the last reporting period) Section 1 – Project objectives and major achievements during the reporting period Section 2 – Workpackage progress of the period Section 3 – Consortium management Annex – Plan for using and disseminating the knowledge Guidelines are available at: ftp://ftp.cordis.europa.eu/pub/fp6/docs/reporting_in_fp6-main_en.pdf

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup5 Periodic management report T12, (T24) Justification of major cost items and resources deployed by each contractor. Note, save all receipts, boarding passes, …! (archived for 5 years) Form C – Financial Statements by each contractor duly signed, dated and stamped (not scanned). The Form C Excel workbook can be downloaded from the following web page under the sub-heading "Project reporting in FP6- Financial Statements (Form C) - Electronic Version 1.1". Audit Certificates when required. The Audit Certificate template to follow can be found at the following address: T12: Saab, LFV and NLR. T24: All contractors. Summary Financial Report consolidating the claimed costs of all contractors. This document is to be prepared by the Project Coordinator.

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup6 Periodic report on the distribution of the Community´s contribution T12, (T24) Reported in Form C-Financial Statement of the Project Coordinator. It shows the distribution, in euros, of funds made by the coordinator to contractors during the reporting period. Any interest generated by the renewal of pre-financing must be reported also in Form C-Financial Statement. Any possible redistribution of funds must be reported.

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup7 Final report Prepared by the Project Coordinator, T24. Publishable final activity report. Final management report. This report must include the consolidated final ”Summary Financial report”. Final report on the distribution of the Community´s contribution. At latest 60 days after receipt of the final payment.

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup8 Mid-term review A mid-term review, initiated by the Commission, shall be held. The consortium shall submit a ”mid-term report” covering all the work carried out since the start of the project, objectives, intermediary results and conclusions, an updated plan for using and disseminating the knowledge and an update of the remaining work planned in Annex I.

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup9 Project deliverables Project deliverables: Annex I – ”Description of Work” p Deliverables should be submitted on the due date as specified in Annex I, with a maximum permitted delay of 45 days after the end of the reporting period. The WP-leader are responsible for deliverables in their WP. The deliverable and a review protocol shall be submitted to the Project Coordinator. Templates for deliverables and review protocol`s will be distributed T2.

Advanced Remote Tower 13 Nov 2007 Malmö/Sturup10 Management guidlines Please find all the details regarding the submission of cost claims and their processing on the following website: When to deliver reports? Reports and deliverables shall be delivered to the Commission within 45 days after the end of the period. Please remember that reports and deliverables shall be delivered to the Project Coordinator within 21 days after the end of the period. Reviews Mid-term review and meeting, initiated by the Commission. Draft of first periodic report (the first 11 months) and meeting 14 Oct Deadline of first periodic report 21 Nov Draft of final report (the first 23 months) and meeting 14 Oct Deadline of final report 20 Nov Audit Certificate: T12 (Saab, LVF and NLR) 28 Nov 2008, T24 (All contractors) 30 Nov Technical meetings according to progress and milestones will be defined later by WP-leader. Meetings within the core Management Team every third month, starting prel 5 Feb 2008.