Lake clean-up process. 1. Project overview The compressed air can reach into the contaminated area to treat, and contaminated materials are separating.

Slides:



Advertisements
Similar presentations
1 Dredging Phases 4 phases –excavation –lifting –transportation –disposal Guide 4: Machines, Methods and Mitigation; Chapter 2: Phases of a Dredging Project;
Advertisements

By Chris Ford and James Hughes ( ) ( )
INTRODUCTION TO THE TREATMENT OF TANNERY EFFLUENTS
Wastewater Treatment By Samuel Lam.
Brief introduction about Segovia Segovia is a city in Spain, the capital of the province of Segovia in Castile- Leon. It is situated about an hour north.
Waste Water Treatment (Sewage Treatment)
Introduction to Environmental Engineering Code No. (PE389) Lec. 6.
Management of Small Docks and Piers Best Management Practices.
Ross By-Pass Tunnel Cleanup Pre-Bid Project Overview May 2014
TEXAS COMMISSION on ENVIRONMENTAL QUALITY. PROPOSED STUCTURE FOR CHAPTER 217 < Subchapter A Administrative Provisions < Subchapter B Design Bases < Subchapter.
EXAMINATION OF MODERN SANITARY LANDFILLS W. Gregory Vogt Chair, Sanitary Landfill Working Group, ISWA Vice President, SCS Engineers.
Presentation to: Technical Advisory Committee Onondaga Lake.
Petrotech Southeast, Inc. Oil Water Separator Maintenance.
Wastewater Treatment and Permit Compliance  Document Permit issue and expiration date  Document permit requirements  If discharge to city, review.
20,000 Barrel Per Day Produced Water Treatment System
Basics of Pump Vigyan Ashram, Pabal.
Processes of Sludge Treatment
Municipal waste water treatment plant in Montreal, Canada Prepared by Guillaume Fournier.
《 Water pollution control technology 》 Tianjin bohai vocational and technical college.
The Work of Streams. Erosion Usually happen by streams flowing through their channels and lifting loose particles by abrasion, grinding, and by dissolving.
Module 3: Environmental Objectives, Programme of Measures, Economic Analysis, Exemptions Remediation & Removal of River Pollutants Michael Jackman- Chemistry.
By Shantanu Mane Vaidehi Dharkar Viral Shah
Protecting the Environment by Separating Mixtures
OZONE DRINKING WATER SYSTEM. CONTENTS Properties of Ozone Production of Ozone Water Treatment Plant – 25 m 3 /hr Ozone Generation System.
Bapetco NORM Control Case Study IDENTIFY ASSESS CONTROL & RECOVERY.
Pollutants in wastewater -- Revisited Ammonia Organic matter Nutrients Pathogens Color Metals and SUSPENDED SOLIDS.
Water Waste Treatment.
GWS SMS INTRODUCTION EMS Manual. 3. PROCEDURES FOR BILGE AND WASTE OIL MANAGEMENT OF MACHINERY SPACES As far as possible, the OWS must not be used.
ENVE 420 Industrial Pollution Control
A C E C A MERICAN C OUNCIL OF E NGINEERING C OMPANIES of Virginia Gary Weishaar, P.E. R. Stuart Royer and Associates, Inc. Consulting Engineers Richmond,
Eaton Corporation Roxboro ISO Program Engine Air Management Operations Brian Phillips.
Alive Project Sanitation System Non traditional sanitation system (low cost) which is implemented by Alive project in the villages is one of the useful.
Unit 9 Oil/Water Separators. What is an OWS? Making It Work Reduce your disposal costs Reducing your permit and regulatory requirements Reducing your.
What do the following have in common? Airplanes, bridges, cars, dams, electricity, skyscrapers, landfills, helicopters, offices, pumps, restrooms, spaceships,
Forging new generations of engineers. Basic Pneumatics.
Depuration plant of processing water outcoming from production activity of Cantina Sociale di Massenzatico (RE). The cooperative winery receives grapes.
Advanced Aeration, Inc. Presentation of Vacuum Bubble ® Technology.
SETA Water treatment plant maintenance
Water Services Training Group Review of FOG Awareness Day Presentations.
Chapter 37 Pipeline Construction. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Explain the.
Environmental Dredging of Perfluorochemical-Impacted Sediment from a Sensitive Wetland Mark A. Gaetz (3M) Paul Lear (WRScompass)
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
Where it goes when I go ! A look into London’s waste water challenges.
Project Update: Hudson River PCBs Superfund Site October 24, 2012 Mr. David King, PE – USEPA Region 2 Mr. Gary Klawinski – USEPA Region 2 Mr. Mark Surette.
Introduction to Environmental Engineering Dr. Kagan ERYURUK
SUCTION DREDGE OPERATION
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Pile Driving/Pile Removal.
PLACER EXAMINATION TECHNIQUES SUCTION DREDGE SAMPLING.
FLOTATION. INTRODUCTION Flotation is an operation that removes not only oil and grease but also suspended solids from wastewaters. Flotation is an operation.
The Resource Conservation and Recovery Act of 1976 and 1989 (RCRA) Alex Chenault Period 4.
David J. Berestka, PE Remedial Design Engineer, Tetra Tech EM Inc.
Migen SpA The The Italian Company of Specialized Services for Industry Plant Migen SpA The The Italian Company of Specialized Services for Industry Plant.
Waste Water Treatment. Assignments Draw, label and explain each step in the wastewater treatment process.
Course TEN-702 Industrial waste management unit-2 Lecture -8 & 9.
© Alfa LavalSlide 1 Alfalaval oil&coolant cleaning 절삭. 측정. 전동공구. 수입공구. 용접기자재. 잡자재 일절 경남 마산시 봉암동 산업용재백화점 141 호 Tel
Sorbent Handling Plant by NHI-Design & Equipment Specifications
Water Filtration Plant Improvements Project Summary
WP 2 – Valorisation of Sludge
Waste Water Treatment.
Water Pollution Abatement II Effluent Treatment
A CLEAR SOLUTION FOR TROUBLED WATER
Advanced Aeration, Inc. Presentation of Vacuum Bubble® Technology
Flow Equalization Jae K. (Jim) Park Dept. of Civil and Environmental Engineering University of Wisconsin-Madison.
FLOTATION.
ISHAN PARYAVARAN PVT. LTD.
Septage Management Options
BASIC PNEUMATICS.
Pt. hydrocarbon enhancement chemistry
Welcome To Our Presentation 1. Topic Name Transfer Stations and Transport, Ultimate Disposal Methods 2.
PUMPS AND DRIVERS NCCER
Presentation transcript:

Lake clean-up process

1. Project overview The compressed air can reach into the contaminated area to treat, and contaminated materials are separating by micro air bubbles. And then micro bubbles with contaminated material in water column and sediment bed shall foaming up and floating into the water surface, the mechanism is similar with DAF(Dissolved Air Flotation) in water treatment facility. Polluted water column and sediment layer Air jet system for water column and sediment layer Collection sludge in water column and sediment layer through DAF technic using micro bubble. After the clean-up, Restoration and remediation the lake, easier and faster the process

Process step for clean upDetail description 1Water analysis and identify the clean-up Pollution review Pollution source and identification 2Method review and applicationClean-up process design 3Select adequate technicsSet the clean up target 4Plan and schedulingunder the applicable technics 5Implementation and operationClean up sytem 6Appraisal the effectivenessMonitoring and verification 7Quality managementValidation for the effectiveness 8ReportingEvaluation the process 9Closing- Project Process 1. Project process

Air Jet System 2. Overview of Work Boat(Air Jet System) Air jet system Roller Brush Collection net

2. Overview of Work Boat (Desilting and Dredging system) Generator Main Engine Pump Desilting and Dredging system

2. Equipment Specification PartsEquip.MaterialsDimensionRemarks Air Jet System Boat Generator50 A Compressor175 Air TankSUS steel1 – 7 kg/cm 2 Air regulator NozzleSteel Under 30 micrometer Micro bubble Hosepp3 AUnder the condition Engine, screw and rudder, steering wheel FRP Boat 500 X 700 X 90 cm 500 Hp Slow speed Work Boat IIPump & Rotary head Barge Boat600 X 900 X 90 cmDredging barge Collection Net Filter and net with enhanced belt Polyester Net 600 X 1200 X 600(Depth) Under the depth Waste Collection Devise Collection HeadSteel devise500 X 70 cmSpecified rake Desilting & dredging pump Desilting rotary and suction type Vacuum suction head with rotary developer 500 X 70 X 90 cm Special design, To be developed under the project condition Sludge transfer Sludge pump Transfer hose Work Station Rotary pump Pressure enhanced hose Wood station 10 X 8 inch pump, impeller, caterpillars Crain system

Capacity(unit/day)Utility Waste collection5,000 m 3 /dayWork boat and collection head Desilting and dredging2,000 m 3 /day Depth can be adjusted by height controller device in the boat. Available the depth is 0.5 meter to 10 meter height in lake. Water Clean-up2,000 m 3 /day Sludge transfer30 m 3 /dayTransfer pump Power SourceSpecificationUse ( liter/day) GeneratorDiesel10 l/day CompressorDiesel50 l/day Motor EngineGasoline30 l/day Main EngineDiesel50 l/day Demand Capacity 2. Equipment Specification

Air Jet System process step 3. Process Step 1. Clean-up line and safety device installation ⇨ 2. Water sampling and test ⇨ 3. Protect device install ⇨ 4. Water diffusion protect membrane installation ⇨ 5. Transfer equipment ⇨ 6. Fabrications ⇨ 7. Launch ⇨ 8. Safety training ⇨ 9. Set-up and operation ⇨ 10. Sludge collection ⇨ 11. Dehydration and store the sludge ⇨ 12. Transfer sludge ⇨ 13. Truck for logistics ⇨ 14. Transfer to truck ⇨ 15. Sludge hauler or treatment

친환경 다목적 환경정화기술 3. Equipment & Operations 9 Work Process of Air Jet System System installation process Work Scope design System installation and preliminary operation Treatment with the system (micro-airbubble) Work Scope design System installation and preliminary operation Treatment with the system (micro-air bubble) Floatation suspended solids Collection suspended solids Dehydration Remove and treat sludge 1. Transport work station 2. Fabrication 3. Launching the unit 4. Operation 5. SS collector 6. Floating solids

친환경 다목적 환경정화기술 Project NameYearDimensionChracteristics Herbei Spirit – oil pollution, Chunri-po, Taean, ChungNam-do ~ Project area, emergency instruction from Korea Coast Guard Sea Beach, precipitation oil decomposition and clean up ImjinGak Lake, Gyunggi-do ,000 m 2 Artificial Dam Ilsan Lake Park, Gyunggi-do ~ ~ ~ ,000 m 2 Depth 0.5 ~ 1.5 meter Artificial lake Bottom caution from the design Songdo Sea water Canal, Incheon November26,000 m 2 Depth 1 ~ 3 meter Artificial Moss and organic material contamination Ilsan eco-canal, Gyunggi-do ~30,000 m 2 Depth 0.5 ~ 1.5 meter Artificial Organic material, clay and sewage contamination Olympic park – lake, Seoul ~70,000 m 2 Depth 0.5 ~ 3 meter Artificial and natural 4. Track Records

친환경 다목적 환경정화기술 Using the Air Jet System for Oil CleanupUsing the Air Jet System for Oil Cleanup Make a confined space Build treatment fence Treat air jet, sequential operation with tide Collection Reference : Track Record I Chunri-Po Oil cleanup 2008

친환경 다목적 환경정화기술 Floated oil residue Oil residueShellfish hole After 2 MonthsAfter 2 Months After 4 MonthsAfter 4 Months ShellfishTurban shellPurificationSeaflower Reference : Track Record I Chunri-Po Oil cleanup 2008

친환경 다목적 환경정화기술 Songdo Sea water Canal, Incheon November26,000 m2 Depth 1 ~ 3 meter Artificial Moss and organic material contamination 애수교 폭포방향 ( 작업 전 ) 애수교 폭포방향 ( 작업 전 ) 애수교 하부 ( 작업 전 ) 애수교 하부 ( 작업 전 ) 점토 포집 ( 작업 중 ) 점토 포집 ( 작업 중 ) 애수교 폭포방향 ( 작업 후 ) 애수교 폭포방향 ( 작업 후 ) 애수교 아래 ( 작업 후 ) 애수교 아래 ( 작업 후 ) Ilsan Lake Park, Gyunggi-do ~ ~ ~ ,000 m2 Depth 0.5 ~ 1.5 meter Artificial lake Bottom caution from the design Reference : Track Record II

친환경 다목적 환경정화기술 Challenge, Responsibility, Reliability, and Contribution are our core Values to do our business, and promoting and improving Environmental techniques to protect our planet is the goal of the business. It’s our role to improve our society by doing standardization And distribution the technique to be used for clean planet. The end of Documents