Investment Opportunities in Public infrastructure and Public Service Infrastructure – ProInversion 2014- 2015 Updated to September 2.

Slides:



Advertisements
Similar presentations
INFRASTRUCTURE, GROWTH AND POVERTY REDUCTION Experience with Camisea Gas Pipeline in Peru Lessons Learned November 19th 2007.
Advertisements

Achieving the MDGs: RBA Training Workshop Module 6: Urban Development Investment Cluster May 9-12, 2005.
UNDP RBA MDG-Based National Development Planning Workshop MDG-Based Urban Development Strategy Gonzalo Pizarro UN Millennium Project February 27-March.
Regional Policy Common Indicators: Infrastructure Definitions and Discussion Brussels, 22 nd November
Grenada Sustainable Energy Plan Stakeholders Meeting April 5, 2002.
ABA CLEAN ENERGY CARBON PROJECT Bruce Johnston
PROJECT Operation and Maintenance of the Convention Center of Lima (Centro de Convenciones de Lima) September 2014.
1 PIDA Domestic Resource Mobilization Strategy for NEPAD- IPPF Interconnecting, Integrating, and Transforming a Continent.
Gas Statistics in Myanmar 24~26 September,2012 Beijing,China International Workshop on Energy Statistics Presented by Tin Zaw Myint Deputy Director Energy.
PROJECT PORTFOLIO. PROJECTS IN TRANSPORT INFRASTRUCTURE.
Jean Carlos Pejo - Chairman ALAF Brazil October 23, 2014
Meeting AECOM, AM SOP-T, CFR, JASPERS
Increasing the Quality of Public Transport in Prague Prague Integrated Transport.
“ MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA ”
Support for programme and project development: JASPERS and ELENA Ralf Goldmann EMA network Meeting
PORT OF NEW YORK/NEW JERSEY
1 Tanzania National Roads Agency TANROADS BRIEF OVERVIEW OF TANROADS Tuesday 29 th March 2011 Thursday 17 th June
E.ON on the Romanian Energy Market ZF Power Summit Bucharest, February 27, 2013 Frank Hajdinjak CEO E.ON România.
June 2013 Building the New Silk Road: EBRD transport infrastructure investments in Central Asia Askar Namazbayev, Infrastructure Russia and Central Asia.
Chicago Department of Water Management Thomas H. Powers, P.E. Commissioner Leadership Summit June 2, 2015.
Water Stress in China: Shortage and Pollution CHEN Ying Research Centre for Sustainable Development (RCSD) Chinese Academy of Social Sciences (CASS) CASS-Nottingham.
04_0001 Elias Semaan Iraq Infrastructure Reconstruction Project Update.
Progresses and Challenges of Infrastructure Spending in Timor-Leste By: Antonio Vitor The 2013 Timor-Leste Update - ANU ADB Consultant & MPW Adviser.
PROGRAMME FOR URBAN AMENITIES IN RURAL AREAS : PURA Physical Connectivity Railway Network Bus To Nearest City Transport Road / Rail connectivity Transport.
TEXAS STATE HOMELAND SECURITY PROGRAM II UASI Grant Performance Period Why there cannot be extensions Liabilities Recommendations vs Required.
Freight Issues in the Report of the National Surface Transportation Policy and Revenue Study Commission Transportation for Tomorrow.
THE CIVITAS INITIATIVE IS CO-FINANCED BY THE EUROPEAN UNION Promoting Sustainable Urban Mobility with CIVITAS.
NATIONAL PROGRAM FOR PRODUCTIVE DIVERSIFICATION Industrial Park Development August, 2015.
Liberalization of Electricity Market in Taiwan Su, Jin-sheng Energy Commission Ministry of Economic Affairs August 8, 2001.
DEPARTMENT OF ENVIRONMENT & SUSTAINABLE DEVELOPMENT Konstadinos Konstadakopoulos Head of Department Lefteris Alexopoulos Environmental Consultant 2 nd.
FOR SIXTY YEARS WE HAVE BEEN TAKING THE POWER FROM WATER AND HANDING IT OVER TO NATIONS LINKING THE DOTS Bucharest, February 20, 2014.
ENERGY AGENCY LITHUANIA Perspective for the EU Structural Assistance to the Energy Projects in Lithuania for the period Marijus Franckevičius.
Inter-American Development Bank Private Sector Financing and the IDB Presentation by the IDB Private Sector Department February 2004.
Types of PPP. What is PPP? The term PPP is a literal translation of the English term “public-private relationship”. PPP is a form of cooperation between.
THE LONG-TERM ENERGY SUPPLY AND DEMAND OUTLOOK IN TAIWAN ENERGY COMMISSION MINISTRY OF ECONOMIC AFFAIRS AUGUST 2001 MOEA -15-
National Planning Department. Mobilizing private investment for low carbon development October 14 th, 2015.
ENERGY SECURITY AND ENERGY UNION PERSPECTIVES FOR COUNTRY October/20/2015 CSF, Brussels BETTER RESEARCH, BETTER POLICY, BETTER REFORM
Sustainable public transport – electric transport development project for the capital.
1 19 th World Energy Congress – 2004 Round Table 1 – Non Fossil Fuels: Will They Deliver? Jerson Kelman President, Brazilian Water Agency - ANA.
Roads and Transport Limpopo 02 August Infrastructure Budget allocation for 2011/12 Upgrading of roads=R770,273m Preventative maintenance= R375,
ECLAC HANDBOOK FOR ESTIMATING EFFECTS OF DISASTERS1 HANDBOOK FOR ESTIMATING SOCIO-ECONOMIC AND ENVIRONMENTAL EFFECTS OF DISASTERS Economic Commission for.
 Contract by Public Authority for provision of asset and/or services  With private entity  Private finance used to fund asset/service  Long-term in.
The National Strategy of Slovak Republic Ing. Iveta Kubasáková, PhD.- Ing. Ivana Šimková University of Zilina, Faculty of Operation and Economics of Transport.
Status and Perspectives on Renewable Energies in Peru Ms. Sandra Vergara Coordinator of the Renewable Energy of GROUP SUPPORT RURAL SECTOR (GRUPO PUCP)
CHALLENGES AND INVESTMENT OPPORUNITIES: THE CASE OF ZESA By Mr Ikhupuleng Dube, System Development Manager – Zimbabwe Electricity and Transmission Company.
- DISCOVER THE DIFFERENCE - Florida’s Natural Energy - DISCOVER THE DIFFERENCE -
1 SYMPOSIUM: U G A N D A A F T E R I D I A M I N A N D M I L T O N O B O T E Hamburg, Germany 29 th September 2008 INVESTMENT OPPORTUNITIES IN POWER GENERATION.
Location The park is located between the major centers of consumption in Russia Industrial Park MSB-Udomlya is located in the Tver region. The developed.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Investment opportunities in public infrastructure
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
Investment opportunities in infrastructure and energy Korea and the Pacific Alliance.
MAIN PRIORITIES IN THE BULGARIAN TRANSPORT POLICY Danail Papazov Minister of Transport, Information Technology and Communications 13 March 2014 Sofia.
ENDLESS INVESTMENT OPPORTUNITIES IN PUBLIC INFRASTRUCTURE AND SERVICES March 7,2014.
Program for installing heating systems using renewable energy, including the replacement or completion of classic heating systems Between July 15, 2010.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
(State Initiatives and Unsolicited proposals projects)
Railroad.
Prof John L Wilson EA Infrastructure Spokesman
Telecommunications & Electronics
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Jean Carlos Pejo - Chairman ALAF Brazil October 23, 2014
INTERNATIONAL PUBLIC TENDER:
Energy day July 3th, 2012.
Prof John L Wilson EA Infrastructure Spokesman
Aleksandar Nikcevic, Principal Banker
Presentation transcript:

Investment Opportunities in Public infrastructure and Public Service Infrastructure – ProInversion Updated to September 2

TRANSPORT INFRASTRUCTURE

CALLED THE AMAZON WATERWAY Implementation of works and actions to improve navigability and passenger and cargo transit on the Amazonas, Marañón, Huallaga and Ucayali rivers. Dredging on critical areas (Malos Pasos) and on the access to the Port of Iquitos. GPS information system on the navigation route. Installation of level measuring stations with data transmission capabilities. Monitoring system. Cleaning system.  Estimated investment (VAT not included): US$ 69.4 million  Type of concession: Co-financed  Concession period: 20 years. Estimated date of award: III Q 2014 Loreto Ucayali

LINES 3 AND 4 OF THE BASIC NETWORK OF THE METRO OF LIMA AND CALLAO Concession, through two independent bids, of two lines of the network of the metro of Lima and Callao for the design, financing, construction, equipment, operation and maintenance of 62 Km of this transportation system, which serves a city of more than 10 millions of inhabitants.  Estimated Investment: Under evaluation  Type of concession : Co-financed  Concession period :35 years Line 3Line 4 32 Km30 Km 2015 Estimated date of award Approximated length TO BE CALLED Lima and Callao

TO BE CALLED Project oriented to the transportation of passengers and cargo, including the execution of the following works along 128 Km of the existing railway: Railway upgrade Changes to the route in critical sectors Purchase of rolling stock Reinforcement of 15 railway bridges Extension of 38 tunnels for standard gauge rolling stock (1,435 mm) Upgrades to signaling and telecommunication systems Draining works The project includes interoperability with Ferrocarril Central (railway service with a standard gauge of 25 ton per axle) for the connection of high Andes regions with the port of Callao and the Santa Anita market.  Estimated investment: Under evaluation  Type of concession: Co-financed  Concession period: 30 years Estimated date of award: II Q HUANCAYO - HUANCAVELICA RAILWAY Junín Central Railway Huancayo – Huancavelica Railway South Railway Huancavelica

PERIPHERAL RING ROAD Unsolicited proposal for the construction, financing, operation and maintenance of a new urban highway approx. 33 Km long ( from Av. Elmer Faucett to Av. Circunvalación), intended to improve vehicle traffic between North and East Lima districts and other areas in the city. Estimated Investment: Studies in progress Type of concession : Co-financed Estimated date of award: II Q 2015 ( if no interested third parties participate) Ring road UNDER EVALUATION Lima and Callao

FAST MONORAIL MASS TRANSPORTATION SYSTEM - AREQUIPA An unsolicited proposal for the design, construction, electromagnetic equipment, systems, rolling stock, financing, operation and maintenance of a 14 Km fast mass transportation system (on elevated track) in the Arequipa Metropolitan Area.  Estimated Investment: Studies in progress  Type of concession : Co-financed Estimated date of award: III Q UNDER EVALUATION Arequipa

Execution of upgrade and rehabilitation works (117 Km), initial periodic maintenance (310 Km); and subsequent maintenance and operation of the 965 Km highway, in order to reach and maintain established service levels on the entire route.  Estimated Investment: To be adjusted, according to studies conducted and arrangements between the Ministry and MEF.  Type of concession : Co-financed  Concession period: 25 years Estimated date of award: III Q 2015 LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 4 TO BE CALLED

Initial periodic maintenance, operation and maintenance of 422 Km of road, in order to maintain established service levels.  Estimated Investment: The ministry is currently updating restoration and maintenance costs.  Type of concession : Co-financed  Concession period: 25 years Estimated date of award: IV Q 2015 LONGITUDINAL DE LA SIERRA HIGHWAY, SECTION 5 TO BE CALLED

Unsolicited proposal for the concession of the construction, operation and maintenance of infrastructure works on the South Panamericana Highway, Ica-Dv. Quilca section, with an approximate length of 518 Km.  Estimated Investment: Under evaluation  Concession period : Self-sustained Estimated date of award: 2015 PANAMERICANA SUR HIGHWAY : ICA- DV. QUILCA SECTION UNDER EVALUATION Ica Arequipa

ENERGY

AZÁNGARO–JULIACA–PUNO 220 kV TRANSMISSION LINE Concession for the design, financing, construction, operation and maintenance of a 110 Km transmission line, 120 MVA of capacity, intended to eliminate congestion in the current system and increase the reliability of the National Interconnected System.  Estimated investment (VAT not included): US$ 68.9 million  Concession period : Self-sustained  Concession period: 30 years plus the construction period (about 24 months). Estimated date of award: IV Q 2014 Puno CALLED

220/60 kV NUEVA LURÍN SUBSTATION and 220 kV AND 60 kV CONNECTION LINES Concession for the design, financing, construction, operation and maintenance of the 220/60 kV Nueva Lurín Substation, that will be connected to the Chilca-San Juan line (220 kV) and to existing substations Lurín and La Pradera (60 kV). This will enable to increase the electricity supply required to meet the increasing demand in the south of Lima. Estimated Investment: US$ 49.6 million Type of concession: Self-sustained Concession period: 30 years plus the construction period (about 24 months). Estimated date of award: IV Q 2014 South Lima CALLED

Concession for the design, financing, construction, operation and maintenance of the first stage of the new Carapongo substation (located in the east of Metropolitan Lima). The new substation facilities will include Protection, Control, Measurement and Communication Systems related to the transmission lines and power substations that supply electricity to Lima.  Estimated investment: US$ 31.3 million  Type of concession : Self-sustained Estimated date of award: II Q 2015 TO BE CALLED CARAPONGO SUBSTATION AND CONNECTIONS TO ASSOCIATED LINES Lima Metropolitan Lima

NEW CORPAC 220 kV SUBSTATION AND 220 kV INDUSTRIAL TRANSMISSION LINES - CORPAC Concession for the design, financing, construction, operation and maintenance of the following projects: New Córpac Substation (underground) 220 kV Industrial Transmission Lines - Corpac (underground) The upgraded electricity supply facilities will serve to meet the increasing demand in the districts of Ate, Cercado de Lima, La Victoria, Miraflores, San Isidro, San Borja (particularly in commercial and financial areas in the latter three districts) and San Luis. Estimated investment (VAT not included): US$ 148 million  Type of concession : Self-sustained  Concession period: 30 years plus the construction period (about 25 months). Estimated date of award: II Q 2015 Industrial Substations Industrial TLs - Córpac Av. Javier Prado Panamericana Norte Highway Panamericana Sur Highway Circunvalación Lima San Borja Ate New Córpac Substatio n CALLED

Contract for the purchase of 1,200 Mw of power in years 2020 and 2021, to be generated by new hydroelectric power generation projects that will be incorporated to the national network (National Inter- Connected Power System (SEIN by its initials in Spanish)).  Estimated Investment: Under evaluation  Type of concession : Self-sustained Estimated date of award: II Q 2015 ELECTRICITY SUPPLY FROM NEW HYDROELECTRIC POWER STATIONS TO BE CALLED Nationwide

QUILLABAMBA THERMAL POWER STATION Concession for the design, financing, construction, operation and financing of a 200 Mw thermal power station to be located in Quillabamba (department of Cusco), and commissioned in 2017, which will be interconnected to the national network (SEIN).  Estimated investment: US$ 200 million  Type of concession: Self sustained Estimated date of award: II Q 2015 TO BE CALLED

HYDROCARBONS

LNG SUPPLY SYSTEM FOR THE DOMESTIC MARKET CALLED Concession to make available a natural gas supply system to be used in emergency situations (failure in NG production in the forest, or in its transportation from the Peruvian forest to the coast). The system comprises back-up storage capacity for 130,000 m3 and facilities for the regasification and shipping of 400 MMSCFD of NG, in order to guarantee the supply of fuel to users in Lima and Callao for up to seven days.  Estimated investment (VAT not included): US$ 250 million  Type of concession : Self-sustained  Concession period: 20 years plus the construction period (30 months). Estimated date of award: IV Q 2014

SANITATION AND HEALTH

MAIN WORKS AND CONDUCTION OF DRINKING WATER SUPPLY FOR LIMA TO BE ANNOUNCED Concession for the design, financing, construction, operation and maintenance of the following infrastructure projects in the departments of Lima and Junín: Re-enlargement of the Pomacocha and Huallacocha Bajo dams (about 90 MCM) Trans-Andean tunnel (about 10 Km) New drinking water plant (5 m 3 /s) South branch pipeline (about 26 Km), including six reservoirs (total storage volume: 24,000 m 3 ) and works for the interconnection with the current drinking water supply system. The concession also includes the operation and maintenance of the following facilities: Current drinking water plant (5 m 3 /s) North branch pipeline (27.1 Km), including four compensation reservoirs (total storage volume: 23,000 m 3 )  Estimated investment (VAT not included): US$ 400 million  Modality: Self-sustained  Period: 30 years Estimated date of award: I Q 2015 CALLED

REGULATION WORKS OF THE CHILLÓN RIVER Concession for the design, financing, construction, operation and maintenance of the following infrastructure projects, intended to ensure drinking water supply to the districts of North Lima. Jacaybamba dam (about 28 million m3) located in the province of Canta, northeast of Lima. Pipeline (about 30 Km) for an average flow rate of about 1.5 m3/s, from the projected water intake on the Chillon River to the current Chillon drinking water plant.  Estimated investment (VAT not included): US$ 70 million  Type of concession: Self-sustained  Concession period: 20 to 30 years Estimated date of award: II Q 2015 TO BE ANNOUNCED TO BE CALLED

Concession of the design, construction, equipment, operation and maintenance of complementary services (blue-collar services) in high-complexity hospitals in the Peruvian Social Security System (ESSALUD): a new one in the city of Lima (Instituto de Salud del Niño y Adolescente) and two in provinces (Piura and Chimbote)  Estimated Investment: Studies in progress Estimated date of award: III Q 2015 TO BE CALLED THREE NEW HIGH-COMPLEXITY HOSPITALS FOR LIMA AND TWO PROVINCES IN THE NORTH OF PERU

SOLID WASTE MANAGEMENT IN HEALTH FACILITIES UNDER THE MINISTRY OF HEALTH IN METROPOLITAN LIMA An unsolicited proposal that comprises the construction, operation and maintenance of a modern solid waste treatment plant (hazardous bio-contaminated/hazardous special/common) for the project’s integral management.  Estimated Investment: Pre-investment Studies in progress  Type of concession: Co-financed Estimated date of award: 2016 UNDER EVALUATION Lima and Callao

TOURISM

CHOQUEQUIRAO CABLEWAY Concession for the design, financing, construction, equipment, operation and maintenance of a cableway, as an access route, from Kiuñala (Apurímac) to Choquequirao Archaeological Park, including the arriving and exit stations.  Estimated investment (VAT not included): US$ 52 million  Type of concession: Co-financed  Concession period: years Estimated date of award: I Q CALLED Apurímac Cusco

CORRECTIONAL SYSTEM

An unsolicited proposal for the provision of electronic personal surveillance services to alleviate overcrowding in correctional facilities in Peru through the use of electronic shackles for tried and sentenced inmates allowed having access to this benefit.  Estimated Investment: Under evaluation  Type of concession : Self-sustained Estimated date of award: II Q 2015 ELECTRONIC SHACKLES UNDER EVALUATION Lima and Callao

Re-location of four correctional facilities that are currently in the urban areas of Metropolitan Lima and the department of Cusco. The project is intended to promote the participation of the private sector in the construction of new replacement correctional facilities in more appropriate areas, under high- quality safety standards 1.Chorrillos Women’s Facility (ordinary) and annex. 2. Lurigancho 3. Miguel Castro Castro. 4. Cusco and Cusco Women’s Facility Estimated investment: Under evaluation Estimated date of award: II Q 2015 TO BE CALLED RE-LOCATION OF CORRECTIONAL FACILITIES Lima and Cusco

An unsolicited proposal for the construction of a shopping center, houses, warehouses and parking lots on the current location of the San Jorge Prison (Historic center of Lima). Additionally, it includes the construction and equipping of a new correctional facility where the San Jorge inmates will be transferred.  Estimated investment: Under evaluation  Type of concession: Self-sustained Estimated date of award: III Q 2015 UNDER EVALUATION CORRECTIONAL INFRASTRUCTURE AND URBAN RENEWAL: “TINKUY PLAZA PROJECT” Lima

BROADBAND INTERNET ACCESS FOR FOUR PERUVIAN REGIONS Concession, through four independent bids, to implement broadband internet access in four Peruvian regions (Apurímac, Ayacucho, Huancavelica, Lambayeque). The project involves the implementation of a high-capacity fiber optic network and an access network (microwaves). RegionLocation Required fiber length Estimated investment USD million Ayacucho Central-Southern highlands 1,900 Km 42 ApurímacSouthern highlands1,400 Km 55 Huancavelica Central-Southern highlands 1,330 km 47 LambayequeNorthern coast570 Km 19  Type of concession:self sustained  Estimated award date: IV Quarter

700 MHZ 4G BAND Concession of three 698–806 MHz band blocks to provide nationwide 4G broadband internet access services. The band is initially expected to be channeled in 15 MHz + 15 MHz blocks  Estimated investment: under evaluation  Type of concession: Self sustained Estimated date of award: I Q 2015

MINING

HUAYDAY AMBARA PROSPECT La Libertad Location of the Project Mining concession with a total surface of 2,992 ha, high exploration potential due to its coal mantles (“clean anthracite”), with an estimated reserve of 1.8 million MT.  Estimated investment (VAT not included): US$ 8 million Estimated date of award: IV Q 2014 CALLED

INTEGRAL WATER-MINING-AGRICULTURE PROJECT TO ADDRESS THE CHALLENGE OF INFORMAL MINING IN PIURA Location of the ore enrichment plant Informal mining area of operation The project will be conducted in two stages:  1st Stage: Design, financing, construction, operation and maintenance of an Ore Enrichment Plant in Talara, where the gold-bearing ore extracted by miners operating in the Piura region (formalized or in process of formalization) will be processed.  2nd Stage: Promotion of a project portfolio for development in agriculture and other sectors, aiming at solving the problem of water (household and agricultural use) in the influence area of formalized mining operations.  Estimated investment (VAT not included): US$ 12 million Estimated date of award: IV Q 2014 Piura CALLED