Presentation is loading. Please wait.

Presentation is loading. Please wait.

PROJECT Operation and Maintenance of the Convention Center of Lima (Centro de Convenciones de Lima) September 2014.

Similar presentations


Presentation on theme: "PROJECT Operation and Maintenance of the Convention Center of Lima (Centro de Convenciones de Lima) September 2014."— Presentation transcript:

1 PROJECT Operation and Maintenance of the Convention Center of Lima (Centro de Convenciones de Lima) September 2014

2  Location : Centro Cultural de la Nación, Av. Arqueología esq. Av. Del Comercio - District of San Borja.  Area: 85,441.39 m2.  Capacity: 9,950 persons  Status: Currently in construction by the company Constructora OAS S.A. Branch of Peru.  Total investment : S/. 534,841,943.23 ( SNIP Code N° 269264) includes the technical file, infrastructure, technology, furniture, equipment and supervision.  Culmination: It must be concluded before the Annual Meeting of Governors of the World Bank and the International Monetary Fund (October 2015), to be held in the city of Lima. Lima Centro de Convenciones (LCC)

3 Description of Infrastructure CONFERENCE ROOMS:  Level 1: 2 rooms of 1,800 m2 e/o – 1200 persons.  Level 4: 2 rooms of 750 m2, 1 room of 225 m2, 1 room of 150 m2, 2 rooms of 300 m2, 2 rooms of 450 m2.  Level 5: 1 room of 150 m2, 1 room of 225 m2.  Level 6: 2 rooms of 750 m2, 1 room of 150 m2, 1 room of 225 m2, 1 room of 450 m2.  Level 8: Plenary room 5,250 m2. Total area : 14,925 m2 Total quantity of persons : 9,950

4 Description of Infrastructure LOWER LEVELS :  Basements 1, 2, 3 and 4: 4 underground levels of parkings for 945 units.  Truck parking : loading and discharge dock. OUTSIDE  Private bus stop (in square of Culture).

5 Description of Infrastructure OTHER SPACES:  Translation booths (Level 2, 5, 6, 7 and 9)  Waiting rooms (Level 1, 2, 4, 6, 8 and 9)  Administrative area (Level 3 and 7)  Coffee shop (Level 3)  Platforms green area (Level 5, 6, 8 and 10)  Recreation (Level 5)  Restaurant (Level 5)  Cuisine (Level 5 and 7)  Warehouse (in all levels)

6 High technology. High technology. Converged system of communications. Converged system of communications. Wifi for 10,000 simultaneous connections. Wifi for 10,000 simultaneous connections. Support connectivity for audio visual. Support connectivity for audio visual. Possibility of simultaneous events. Possibility of simultaneous events. Lima Centro de Convenciones (LCC)

7 CULTURAL CENTER OF THE NATION Location of the Project LCC

8 Main Characteristics of the Process DesignConstructionFinancing Public Investment : Executed OperationMaintenance Private Investment : To be implemented Lima Convention Center (Centro de Convenciones de Lima) (LCC) El Proyecto Referential Video : https://www.youtube.com/watch?v=YaJ20-ascskhttps://www.youtube.com/watch?v=YaJ20-ascsk

9 SectorDescription Purpose Guarantee the adequate operation, exploitation, preservation, and integral maintenance of infrastructure, of installations and general equipment of the LCC. Participation modality Public Private Partnership Estimated term of the project 15 - 20 years (to be defined) Estimated investment in operation and maintenance To be defined Status of the Process The call is foreseen for the IV quarter of 2014 and its award for the II quarter of 2015. Main characteristics of the Process

10 Contact for the Project Head of the Project:Luis del Carpio Castro Telephone:(511) 200-1200 (Extension 1357) Fax(511) 221-2935 E-mailldelcarpio@proinversion.gob.pe

11 www.proinversion.gob.pe contact@proinversion.gob.pe