DON Acquisition and Capabilities Guidebook. (22 Dec 03 Clean Draft)

Slides:



Advertisements
Similar presentations
METRICS AND CONTROLS FOR DEFENSE IN DEPTH AN INFORMATION TECHNOLOGY SECURITY ASSESSMENT INITIATIVE.
Advertisements

Unclassified: Pre-Decisional 1651 v1.1 AIM FRB May 2010 Mr. Larry G. Paige II Head, Navy Policy, Strategy, Vision and Requirements (N152) Total Force Training.
Introduction to the Joint Capabilities Integration and Development System (JCIDS) CAPT Keith Bowman, Joint Staff, J-8 Hello, I am Captain John Costello.
Clinger Cohen Act (CCA): Integrating CCA (U. S. C
Capabilities and Acquisition Division
BENEFITS OF SUCCESSFUL IT MODERNIZATION
Panel 5: The Latest in OA Innovation and C4ISR 4 November, 2014 Mike Rice President / Senior Systems Engineer R2E Inc.
NDIA 15 th Annual SE Conference October 2012 | Page-1 Distribution Statement A – Approved for public release by OSR on 10/09/2012, SR Case # 13-S-0078.
PM eToolkit A Major Performance and Learning Tool (PLT) based on the content of DAU’s Program Managers Toolkit.
1 May 2009 ver. 5.5 Materiel Development Decision (MDD) MDA: Approves AoA Study Guidance Determines acquisition phase of entry Identifies initial review.
NSS SMC/XR Template SMC April 2008; rev19 Program Management
Gate 1 Input Criteria Objectives of Top Leadership Teams/CDR’s Intent Completed CBA Completed Service review of ICD Identification of mutually shared needs.
1. Construction/Safety Standards for Small Craft Webinar Presentation January 2014 Transport Canada Associate Assistant Deputy Minister Safety and Security.
A Combat Support Agency Defense Information Systems Agency Unified Capabilities Requirements (UCR) Overview Joint Interoperability Test Command.
DoD Acquisition Domain (Sourcing) (DADS) Analysis of Alternatives (AoA) E-Business/SPS Joint Users’ Conference November 15-19, 2004 Houston, TX.
1 Marine Corps Spectrum Management 12 Dec 2011 Spectrum Management Officer Headquarters, U.S. Marine Corps DISTRIBUTION STATEMENT A: Approved for public.
IT Acquisition Reform - Update
Why is BCL Needed? BCL addresses long-standing challenges that have impacted the delivery of business capabilities The DepSecDef directed increasing the.
Gate Review Process presented at DODCAS 2009 DON Session CAPT Jim Baratta Deputy Director, NCCA.
Module N° 8 – SSP implementation plan. SSP – A structured approach Module 2 Basic safety management concepts Module 2 Basic safety management concepts.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
© MCR, LLC MCR Proprietary - Distribution Limited Earned Value Management Application, Guidance, and Education Neil F. Albert President/CEO MCR, LLC
Department of the Navy Information Security Program
A Combat Support Agency Defense Information Systems Agency UNCLASSIFIED UNCLASSIFIED Spectrum Access: The Tools to Connect GEMSIS 15 Aug 2011.
1 SBIR/STTR Transition Program SBIR/STTR Transition Program (STP) (STP) Mr. Douglas Marker SBIR Technology Manager Program Executive.
1 Clinger Cohen Act (CCA) (Title 40): An Emerging New Approach to Oversight – Overview and Program Pilot June 27, 2006 Mr. Edward Wingfield Commercial.
Overview of the DON XML Vision, Policy, and Governance Bob Green & Stephanie Gernert Office of the Dept. of Navy Chief Information Officer (DON CIO)
UNCLASSIFIED CJCSI Revision Update CAPT Jeff Gernand, J-8 12 November 2002.
Joint Capabilities Integration and Development System (JCIDS) Nov 2010
Shift Left Feb 2013 Page-1 DISTRIBUTION STATEMENT A – Cleared for Open Publication by OSR on January 17 th, 2013 – SR case number 13-S-0851 Dr. Steven.
TITLE 40 CCA Outcome Measures of Effectiveness (MOEs) Revision of mission-related and administrative processes (BPR) Post Implementation Review (PIR) Briefing.
Power to the Edge A Net-Centric DoD NII/DoD CIO Performance and Results-based Management of IT and NSS Investments Measures of Effectiveness (MOEs) and.
Life Cycle Logistics.
D Appendix D.11. Toward Net-Centric Acquisition Oversight A Proposal for an Acquisition Community of Interest (COI) MID 905 Streamlined Acquisition.
(c)2005 Defense Sytstems Management Corporation 1 Where is CM and DM in DODD Presented 2-4 March 2005 Dr. Jay Billings.
Earned Value Management Update Nancy L. Spruill Director, Acquisition Resources and Analysis Office of the Under Secretary of Defense (Acquisition, Technology.
Acquisition Process Improvements Training July 17, 2008 rev3 1 Acquisition Improvement The System Design Specification (SDS) Primer.
1 1 Defense Acquisition Guidebook Progress Update March 27, 2012.
RECOMMENDATIONS OF THE GOVERNOR ’ S TASK FORCE ON CONTRACTING AND PROCUREMENT REVIEW Report Overview PD Customer Forum September 2002.
RMISRMIS Department of the Navy Risk Management Information System Kurt Garbow Director, Aviation and Operational Safety Office of the Deputy Asst Secretary.
0 2 Nov 2010, V1.4 Steve Skotte, DAU Space Acquisition Performance Learning Director New Space Systems Acquisition Policy.
Joint Program Executive Office for Chemical and Biological Defense
CCA LSS Support Slides1 Draft The Defense Acquisition Management Framework. Post Implementation Review (PIR) Capability Needs Satisfaction & Benefits.
Materiel Development Decision (MDD) Information Requirements
 Local commanders understand impact of IA on mission accomplishment  Standard allies and coalition partners can emulate  IA for other workforces (acquisition,
Service Acquisition Requirements Review Board (SARRB) Overview 19 June 2012 Presenter: CAPT Scott Hoffman, Deputy Director for Contracts Space and Naval.
Condition Based Maintenance Plus (CBM+) Overview
Government-wide Talent Development November 20, 2014.
Open Architecture Business Innovation Initiative (OA-BII) Nick Guertin Director for Transformation DASN RDT&E 20 September 2012.
DoD Template for Application of TLCSM and PBL
Lesson Objectives Determine the key Requirements Manager activities leading up to the MDD, the outputs of the MDD, and the Defense Acquisition documents.
Lesson Objectives Assess the major requirements management activities during the acquisition process from Milestone B to Initial Operational Capability.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities April 25, 2017.
Materiel Development Decision (MDD) to Milestone A Requirements Management Activities March 7, 2017.
MDD to Milestone A Requirements Management Activities
NSS SMC/XR Template SMC April 2008; rev19 Program Management
Defense Information Systems Agency A Combat Support Agency
Defense Acquisition System
Milestone A to Milestone B Requirements Management Activities
JTAMS MILESTONE A ANALYSIS
New Space Systems Acquisition Policy
ENVIRONMENTAL SAFETY & HEALTH DEPARTMENT OF THE NAVY RESPONSIBILITIES
MDD to Milestone A Requirements Management Activities
Information Required for Milestone and Decision Reviews
USMC Logistics Command (LOGCOM) has completed the acquisition planning process for the Marine Corps Logistics Services (MCLOGS) Contract. Formal Acquisition.
The Department of Defense Acquisition Process
JTAMS PRE-MILESTONE B ANALYSIS
JTAMS PRE-MILESTONE B ANALYSIS
Presentation transcript:

DON Acquisition and Capabilities Guidebook

(22 Dec 03 Clean Draft)

Distribution:

Distribution: (continued) FKR(Shore Activities under the Command of

FKR6B (NAVAIRWARCENWPNDIV (China Lake)(NWC-2152))

FO1(COMNAVLEGSVCCOM)

FS1(ONI) –Chapter Office of the Chief of Naval Operations (OPNAV) Program and Resource Sponsor Responsibilities CNO, CNO (N8/N81) Weapon System Responsibilities OPNAV ICD and CDD/CPD Capabilities Development and Processing Procedures IT System, including NSS, Process Redesign Requirements

Joint Requirements Oversight Council (JROC) Documentation Processing Procedures Marine Corps ICD and CRD/CDD/CPD Development and Processing Procedures

2.2Acquisition Management Process

2.5.6Phase OS: Operations and Support Chapter 3Statutory, Regulatory, and Contract Reporting Information and Milestone Requirements

Joint Requirements Oversight Council (JROC)

Product Support

Human Systems Integration (HSI)

International Cooperation*

Integrated Baseline Reviews (IBRs)

3.5 Consolidated Acquisition Reporting System (CARS) Chapter 4Information Technology (IT) Considerations

4.2.3Registration Guidance

4.3DOD CIO IA Strategy Approval Process

4.3.9IA Strategy Content

Policies, Standards, and Architectures

Benchmark

Potential Sources

Certification and Accreditation

Benchmark

Potential Sources

4.4CCA Compliance Determination 4.5Information Interoperability – 4.6.1Information Assurance and Integrated Architectures Chapter 5Integrated Test and Evaluation

5.1Integrated Test and Evaluation (T&E) Overview

5.2DON Responsibilities for T&E