WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date: 2016-03-14.

Slides:



Advertisements
Similar presentations
WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Advertisements

Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #12 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
OneM2M Draft proposal for slide set. This is not intended to be a oneM2M presentation. It is a collection of source material slides which can be used.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Requirements Overview Group Name: Technical Plenary (TP19) Source: Shelby Kiewel, iconectiv, Meeting Date: Agenda Item:
Discussions for oneM2M Semantics Standardization Group Name: WG5 Source: InterDigital Communications Meeting Date: Agenda Item: WI-0005 ASN/MN-CSE.
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Updated:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Introduction of PRO WG activities Group Name: TP Source: Shingo Fujimoto, FUJITSU, Meeting Date: Agenda Item:
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
WG 3 Progress Report at TP13 Group Name: oneM2M TP13 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
M2M Abstraction & Semantics Group Name: WG5 Source: France Telecom, NEC Europe Ltd., Meeting Date: xx.
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
What and Why? Next steps for oneM2M Semantics Group Name: WG5 Source: Joerg Swetina, Martin Bauer (NEC) Meeting Date: Agenda Item: WI-0005 oneM2M-MAS
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Customized Resource Types MAS Group Name: MAS + ARC + PRO WGs Source: Wolfgang Granzow, Qualcomm Inc., Meeting Date:
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
Step by step approach Group Name: WG2 Source: Michael hs. Yang, LG uplus, Jaeseung Song, NEC Europe, Meeting.
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
Ontology Resource Discussion
1 HGI MESSAGE TO ONEM2M TECHNICAL PLENARY HANS WERNER BITZER, DEUTSCHE TELEKOM VICE CHAIR, HGI ONEM2M TP#19, SOPHIA ANTIPOLS, FRANCE.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
Discussion for the next oneM2M release Group Name: TP Source: JaeSeung Song, KETI, Jaeho Kim, KETI,
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
Architectural Considerations for Semantic Support Group Name: WG5 Source: Martin Bauer (NEC), Joerg Swetina (NEC) Meeting Date: Agenda Item:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Proposed Co-convened WG1/2 Objectives, Schedule, and Activities Group Name: TP#1 Source: Omar Elloumi (Alcatel-Lucent), Laurent Laporte (Sprint) Meeting.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Group Name: oneM2M WG1 Requirements Source: Phil Hawkes, Rapporteur “Benefits of oneM2M technology” TR,
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
Status of Active Work Items Summary Group Name: TP Source: Roland Hechwartner, WPM Convenor Updated: source: TP_WPM R08-New_Work_Item_Status_Report.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
Reasons for CSF Clean-up (Issues & Next Steps) Group Name: WG2 Source: Syed Husain – NTT DOCOMO Meeting Date: (ARC_9.3) Agenda Item: 6 DOC#:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Overview of oneM2M Home Appliances Information Model
Status of Active Work Items Level of Completeness
WG2 - ARC TP#29 Status Report
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
Release Timeline Discussion R2 and beyond
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
oneM2M Work on IoT Semantic and Data Model Interoperability
Status of Active New Work Items
Presentation transcript:

WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date: to Agenda Item: TP#22, Item 10.4, Reports from Working Groups

© 2015 oneM2M Partners TP Issues for DECISION in TP 2 Request for TP Approval (R2) – TP TR-0007-Study of Abstraction and Semantics Enablements Adjust deliverables (R2) – TR-0022 Continuation and integration of HGi Smart Home Activities for Approval TP23 – TS-0012 Base Ontology for Approval TP23 Adjust deliverables – TS-0022 Field device configuration for Freeze TP23

© 2015 oneM2M Partners TP Issues for DECISION in TP 3 CR Pack for TS-0012 (R2) – TP-2016-xxxx CR pack TS0012 R2 at TP#22 MAS R02CR_TS-0012_Update_Base_Ontology

© 2015 oneM2M Partners TP Issues for DECISION in TP 4 CR Pack for TS-0023 (R2) – TP-2016-xxxx CR pack TS0023 R2 at TP#22 MAS CRs-document structure in design rule MAS R04TS-0023-the integration and optimization of moduleclasses MAS R04CRs-TS-0023-Updating Documentation MAS R03TS-0023-multiplicity of mudule classes in the device model MAS R04TS-0023-editorial changes MAS R03CRs-TS-0023-IM_5_5_Enumeration Definition(LGE) MAS R02MAS CRs-TS-0023-Enumeration_Definition(HW) MAS R02CRs-cleanUp_for_deviceType MAS R02CRs-cleanUp_for_moduleclass MAS R01MAS Information_Model_Resource_Mapping(HW1) MAS R01MAS Information_Model_Resource_Mapping(HW2) MAS R02MAS CRs-TS _5-Enumeration&Modes_for_Thermostat.doc MAS R02CR_module_resource mapping rule

© 2015 oneM2M Partners TP Issues for INFORMATION in TP 60+ contributions (incl. revs) treated, 21 agreed. – See all status in MAS (latest revision)latest revision Meeting Objectives review – Approve specifications for Release 2 features Semantics enabling (e.g. discovery, base ontology): WI-0025 (TS-0012 updates from TP22), WI-0005 (TR-0007 v2.9.0) – Freeze stage 2 work of Release 2 features (expected approval TP23) LWM2M interworking: WI-0024 (TS-0014) – Progress stage 3 work on specifications for Release 2 features (expected approval TP23) Home domain abstraction model: WI-0017 (TS-0023) Semantics enabling (e.g. discovery, base ontology): WI-0025 TS-0004 – Freeze stage 2 work of other features Field device configuration: WI-0030 (TS-0022, TS-0001, TS-0004) (expected approval TP25) – Request extension for approval of WI-0043 (TR-0022 Continuation and integration of HGi Smart Home Activities) until TP23 5

© 2015 oneM2M Partners TP Issues for INFORMATION in TP Deliverables/WIs progress – WI-0030: M2M Application & Field Domain Component Configuration TS-0022 Field Device Configuration – WI-0017: Home Domain Enablement TS-0023 Home Appliances Info. Model & Mapping – WI-0043: Continuation & integration of HGI Smart Home activities TR-0022 HGI Continuation & Integration – WI-0024: LWM2M Interworking TS-0014 LWM2M Interworking – WI-0005: oneM2M Abstraction and Semantics Capability Enablement TR-0007 Semantic Study, TS-0001 Architecture – WI-0025: Generic Interworking TS-0012 oneM2M Base Ontology 6  50% Mgmt Abstraction Semantics  80%  100%  55%  85%  100% * to be confirmed by rapporteurs

© 2015 oneM2M Partners TP Open Action Items 7 #Action Item DescriptionOwnerStatus A-WG Mapping of SDT for oneM2M Resources, and its relationship with Base Ontology LGE, DT, NECOPEN A-WG Further contributions to give more descriptive text in the 'Documentation' field in TS LGE, and all contributing members OPEN A-WG further clarification of 'Eventable‘ in TS Do we need to keep it or not. How does it impact resource mapping. DT, LGEOPEN A-WG Map home appliance information model to Base Ontology, in TS0023. NEC, DT, KETIOPEN A-WG Consistency check between accepted ModuleClasses and device profiles, including default value, units for datapoints in TS LGE/RapporteurOPEN A-WG Consistency check in TS-0012 (e.g. SAREF mapping based on the latest Base Ontology) NEC/RapporteurOPEN A-WG TS-0023 Editor will send an MAS working group to have the outstanding module classes be defined before TP23 LGE/RapporteurOPEN

© 2015 oneM2M Partners TP Next Steps – Semantics Send TR-0007 through Edit Help Finalize TS-0004 aspects for Semantics from TS-0001 Finalize the contributions for Generic Interworking (TS-0012) based on existing contributions that still need revision and agreement Send TS-0012 through EditHelp 8

© 2015 oneM2M Partners TP Next Steps – Abstraction Normative work on Home domain info. model (TS-0023) – 1. Complete the information modeling (actively ongoing) A. Complete empty fields in the tables within TS-0023 B. Consistency check in TS-0023 to ensure no overlap/conflicting ModuleClasses, data points, etc C. Clarification for ‘event’/’eventable’, if unnecessary, they will be removed. D. More descriptive text for ‘Documentation’, ‘Note’ – 2. Complete oneM2M resource mapping in Annex (actively ongoing) Mapping will be informational guidance only; 1:1 mapping between the information model and resource model is not necessary The Short Names for attributes are needed to be added to TS-0023 – 3. Stage 3 work (discussion started) A. Decision needed to how/who to validate and manage data types, ranges in xsd B. SDT XML meta model mapping with oneM2M xsd (optional) – Incomplete information models in terms of 1,2 and 3 by the MAS 22.2 will be removed from Rel-2. – 4. Mapping to Base Ontology – 5. Mapping to external home appliance information model (e.g., AllSeen, OIC) – If 4 and 5 are not complete by the MAS 22.2 these sections will be removed from Rel-2. 9

© 2015 oneM2M Partners TP Next Steps – Abstraction/Management HGI continuation & integration (WI-0043) – Need to fill in items of how to cooperate with OSGi – Need to add aspects of the device abstraction layer – need to move the discussion to work items. Field Device Configuration (TS-0022) – Entity registration information – Application post-enrollment capabilities 10

© 2015 oneM2M Partners TP Next Meetings / Calls Conference Calls – MAS#22.1:April 11, 2016 UTC 12:30-14:00 – MAS#22.2: April 18,, 2016 UTC 12:30-14:00 – MAS#22.3: May 2, 2016 UTC 12:30-14:00 – MAS#22.4:May 9, 2016 UTC 12:30-14:00 (Adhoc) Face-to-Face – MAS#23: May 16-20, 2016, Seoul, South Korea 11