Summary of the AWAKE Technical Board Meetings Edda Gschwendtner.

Slides:



Advertisements
Similar presentations
Summary of the Design Report and Next Steps Edda Gschwendtner for the CERN AWAKE Project Team Edda Gschwendtner, CERN1.
Advertisements

T2K – Canada Accelerator & Detector Status D. Karlen University of Victoria & TRIUMF ACOT meeting, May 12, 2007.
CEA DSM Irfu - Bernard GASTINEAU - R3B Technical Board Meeting -April 4, Reactions with Relativistic Radioactive ions Beams GSI Large Acceptance.
An updated Baseline Design for MICE From proposal to technical reference Paul Drumm, Dec 2003.
Compressor status AWAKE Technical Board meeting 19 May 2015.
ITS Subsystems Availability MACS Week, June 2011 E. Sargsyan PP a-ESA_ITS_MACS_Week_June2011.pptm E. Sargsyan ITS Subsystems Availability 1.
Laser news AWAKE performance meeting Overview There was a meeting on with the supplier of the laser system (AMPLITUDE) No new information.
AWAKE workshop, Greifswald, September 24 th -26 th, 2014Steffen Döbert, BE-RF AWAKE electron source update.
AWAKE RF Synchronization and LLRF Budget Review Reported by Wolfgang Hofle Acknowledgement: A. Butterworth, H. Damerau, S. Doebbert, J. Molendijk, S. Rey.
Beam Instrumentations: Requirements for Proton and Electron Beams C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements:
AWAKE electron source New Electron Source WP at CERN
Summary of the AWAKE Technical Board Meeting September 2014 – March 2015.
The AWAKE Project at CERN and its Connections to CTF3 Edda Gschwendtner, CERN.
1 BROOKHAVEN SCIENCE ASSOCIATES Preparations for Linac Commissioning Ray Fliller, Associate Physicist 8 th ASAC meeting for NSLS-II Project May 10-11,
LINAC 4 Project L4T/L4Z Design Status J.Humbert / B.Riffaud on behalf of EN-MME design team 1 st September 2011 LINAC4 – BEAM COORDINATION COMMITTEE B.Riffaud.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
Impact on Project Planning and Cost. Agenda CERN Project Budget Planning Summary E. Gschwendtner, 9 April
Laser Beam Transport and Integration. AWAKE Collaboration meeting. Mikhail Martyanov Christoph Hessler CERN, EN-STI-LP Valentin Fedosseev CERN
Integration of the Experimental Facility in West Area & CNGS 1Ans Pardons, 18/10/2012 Integration of experimental facility in West Area and CNGS With input.
AWAKE Electron Spectrometer Simon Jolly, Lawrence Deacon, Matthew Wing 28 th January 2015.
Electron Spectrometer Work Package Simon Jolly 19 th May 2014.
Integration, Installation & Infrastructure Ans Pardons, with input from the WP4 members September 2014.
Laser Status Update J. Moody, E. Oz, P. Muggli MPP Future Accelerators AWAKE Collaboration
Hall 180 Cryogenic test facility: Project management: Project Change Request, EVM and Interface Sheet L. Serio.
Update on Laser Beam Lines Christoph Hessler, Mikhail Martyanov, Valentin Fedosseev (CERN laser team)‎ Thanks to M. Battistin, N. Chritin, F. Galleazzi,
P. Muggli, CERN, 09/04/2014 Summary of the 1 st Meeting of the Physics and Experiment Board Patric Muggli Max Planck Institute for Physics Munich
Compressor status AWAKE Technical Board meeting 19 August 2015.
United Nations Economic Commission for Europe UNECE Transport Division 1 TRANS-EUROPEAN RAILWAY (TER) PROJECT 2 nd Expert Group Meeting (Budapest, 23 September.
1 1. Some recent views ( ) 2 Linac tunnel
9 th AWAKE Technical Board 11 March Actions from Last Technical Board WP laser and MPP: decide until March 2015 which compressor design will be.
Update on the Laser Beam Line
Summary of Kick-Off Meeting: AWAKE Technical Board 9 April 2014 E. Gschwendtner, 11 April
Design, integration and installation milestones Legend: 2015/Q1= 1 st quarter of 2015 (January-March) Phase 1 = proton & laser beams operation Phase 2.
PHIN Fabrication of a photo-injector for the CTF3 accelerator and for the NEPAL test stand WP 4 of the JRA2 PHIN 1.Status of the construction of RF guns.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
17th July 2008#4-CTF3 Committee1 CA.BHB 0400CA.SNH 0110CA.SNI 0120 CA.VVS 0100 CA.DHG/DVG 0130 CA.VVS 0200 CA.MTV 0215 CA.BPM 0220 CA.DHG/DVG 0225CA.SNG.
AWAKE Technical Board, 19 August E. Gschwendtner, CERN.
Lau Gatignon. The open session of this meeting was fully dedicated to the AD program with 6 presentations by AEGIS, ACE, GBAR, ASACUSA, ATRAP and ALPHA.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Electron Spectrometer: Status July 14 Simon Jolly, Lawrence Deacon 1 st July 2014.
Status of the AWAKE Control System Edda Gschwendtner, Janet Schmidt, Marine Gourber-Pace, Roman Gorbonosov, Peter Sherwood AWAKE Technical Board, 27 January.
Interface of FP420 to LHC FP420 meeting 28-Sep-2006.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
Issues Concerning Different Beam Lines Integration C. Bracco, E. Gschwendtner, B. Goddard, M. Meddahi, A. Petrenko, F. Velotti Acknowledgements: WP3 and.
Proton-Driven Plasma Wakefield Acceleration CERN Project Structure Edda Gschwendtner, CERN Lisbon Meeting, 22 June 2012Edda Gschwendtner, CERN2.
Awake electron beam requirements ParameterBaseline Phase 2Range to check Beam Energy16 MeV MeV Energy spread (  ) 0.5 %< 0.5 % ? Bunch Length (
Status of the Spanish contribution to CTF3 L. García-Tabarés, F. ToralCERN, 17/9/2006.
SPS movable table Joanna Swieszek, Kurt Artoos (EN-MME) 14/04/2016.
European Advanced Accelerator Concepts Workshop, Elba, September 14 th -18 th, 2015Steffen Döbert, BE-RF Electron accelerator for the AWAKE experiment.
Feasibility Study of the AWAKE Facility at CERN Edda Gschwendtner, Chiara Bracco, Brennan Goddard, Malika Meddahi, Ans Pardons, Elena Shaposhnikova, Helga.
AWAKE p+ beam line HWC C. Bracco, J. Schmidt Acknowledgment: MCS, EPC, MPE, SPS-OP, BI, ABP (survey),STI, EA, ACE, RP.
Laser Line work package (WP6) AWAKE Technical Board meeting 19 May 2014.
Status of CTF3 G.Geschonke 1CTF3/CLIC Collaboration Board
Status of AWAKE Laser Line Installtion For the EN-STI Management Board - 30 May 2016 Presented by Valentin Fedosseev.
AWAKE Run 2 : 1) Interstage considerations 2) CALIFES as plasma technology test facility Erik Adli and Carl A. Lindstrøm University of Oslo, Norway AWAKE.
EAAC, Isola d’Elba, September 2017, WG1
Francois and Lau EATM 17 July 2012
CLEX Building Layout, Conventional Facilities, TL2, TL2’,
PLC-based control systems at SOLEIL - ICALEPCS 2017
CLEX* Status and Plans CTF3 complex CLEX
Plasma Wakefield Acceleration and a possible eP scattering Experiment MPP Retreat January 21, 2014 Allen Caldwell.
ELENA Beam Transfer Workpackage
Ideas for medium and long term facility upgrade Roberto Corsini for the CLIC Accelerator Collaboration.
AWAKE proposals for BE/BI
AWAKE status and readiness for phase #2
Advanced Research Electron Accelerator Laboratory
HL-LHC upgrade at IPHC news
Drive Laser Commissioning Status
Two-beam Test-stand Design and Construction Status
X-Ray Endstation Systems (XES) 2006 Schedule
Presentation transcript:

Summary of the AWAKE Technical Board Meetings Edda Gschwendtner

Technical Board After the approval of AWAKE end 2013, urgent need to restructure and better organize the AWAKE collaboration: – Be more efficient to meet the experimental goal of having 1 st beam in  Technical Board: Institution where all issues concerning the design, installation, integration, commissioning of the AWAKE experiment are coordinated: – Follow-up of the technical progress of the different groups/tasks. – Coordinate the design, installation, integration and interfaces of the experiment. – Provide specifications of the technical implementation. – Perform milestone tracking and resource loaded planning. – Take technical decisions. – Follow-up and documentation.  Allows to have fine-meshed follow-up with much more efficient reactions! 2

M. Bernardini- AWAKE TB Global Overview: proton phase 25th August, Installation: 2015: 3 rd and 4 th Q 2016: 1 st and 2 nd Q HWC: 2016: 2 nd and 3 rd Q Proton Physics: 2016: from 4 th Q

TaskMemberAlternate MemberInstitute/Technical Group Chair Technical CoordinatorEdda GschwendtnerCERN/EN-MEF Deputy Technical CoordinatorChiara BraccoCERN/TE-ABT Ex-officio members SpokespersonAllen CaldwellMPI Deputy spokespersonMatthew WingUCL Physics CoordinatorPatric MuggliSilvia CipicciaMPI Simulation CoordinatorKonstantin LotovBINP Task Group Coordinators Metal vapor sourceErdem ÖzMPI Munich Helicon plasma cellOlaf GrulkeIPP Greifswald Pulsed discharge plasma cellNelson LopesIST Self-modulation diagnosticsRoxana TarkeshianMPI Electron spectrometerSimon JollyLawrence DeaconUCL LaserJosh Moody Electron gun elementsGraeme BurtCockcroft Institute Data AcquisitionPeter Sherwood SimulationKonstantin LotovAlexey PetrenkoBINP, CERN, IST CERN work package leaders SPS beamElena ShaposhnikovaCERN/BE-RF Proton and electron beam linesChiara BraccoCERN/TE-ABT Experimental area, integration, installationAns PardonsCERN/EN-MEF Electron sourceSteffen DoebertCERN/BE-RF Laser beam line and interfaceValentin FedosseevCERN/EN-STI CERN Sub work package leaders Radiation ProtectionEduard FeldbaumerHelmut VinckeCERN/DGS-RP RF synchronizationAndy ButterworthWolfgang HoefleCERN/BE-RF VacuumJan HansenCERN/TE-VCS Beam InstrumentationRhodri JonesLars JensenCERN/BE-BI Technical Board 4

Technical Board Meetings st TB: 9 April 2014 (Collaboration Meeting at CERN) 2 nd TB: 19 May 2014 (via phone) 3 rd TB: 1 st July th TB: 25 th August th TB: 24 September th TB: 6 November th TB: 11 December

Technical Board Meetings 1 st TB: 9 April 2014 (Collaboration Meeting at CERN) – Edda summarizes for each work-package: milestones, matters arising, required input from others. 2 nd TB: 19 May 2014 (via phone) – All work-package leaders presented their progress and planning/milestones  Inventory  All issues put on the table  Find weak points  Explain why some work-packages need information so early/urgently/late…  Connect the responsible people who need to work together 6

3 rd Technical Board Meeting 1 st July 2014 Beam Instrumentation, Controls, Planning Self-modulation diagnostics (Roxana) – CERN got better understanding of layout  need to freeze it now – Follow-up meetings on optical lines for the streak-camera CERN BI: – Clear message on available resources for BI – caused many discussion with CERN management on use of CTF3 beam instrumentation and on TRIUMF collaboration Yesterday: TRIUMF presentation  Member of the collaboration! PHIN beam Instrumentation can be used Some other instrumentation in CTF3 could be available Discussion started on how to measure synchronization CERN Control Standards – DAQ discussions started!!!! Parameter list of which data logged, used for alarms, etc.. Which readout system to use  ongoing studies. Planning: – First time a global planning A lot of missing input 7

4 th Technical Board meeting 25 th August 2014 Downstream Plasma Line, Plasma Cell, Planning Quadrupole focusing for the electron spectrometer (Alexey) – Decision: install focusing magnets – Powering (in series) to be confirmed  see 5 th TB! Integration issues downstream the plasma cell (Ans) – Length of 2m for the diagnostics table confirmed – Define rest of the downstream area now (choice of the spectrometer magnet) Status of the plasma cell (Erdem) – Grant company + planning – Many issues: Fast valve dimensions Rb dilution Diameter of tube Beam focusing Electron trapping Valve-induced density variations in the Rb vapor (Roberto) – More calculations ongoing  see 5 th TB! Planning (Marzia) – Racks and cable needs! Deadline end September! – Installation planning started 8  PEB & many follow-up meeting!

5 th Technical Board Meeting 24 September 2014 Vacuum, Plasma cell, TRIUMF Update and follow-up of vacuum system (Jan)  Put on the table many points!! – separating window: before decision: need input from Alexey and Lawrence  this Coll. Mtg!  more calculations on different window material/thicknesses needed. Consequence: if we put a window in that place, it’s ok in terms of planning. Huge budget difference in case we move the window more upstream. – Fast valve control system: to be defined  Jan, Chiara, Patric, Erdem sit down! – Laser line acceptance tests: ongoing (on-hold). – Vacuum window at the end of the proton line: decision: shift tube upstream for exchange. – Calculations on electron line vacuum : on-hold.  need plasma diameter – Proposed proton beam line: we can approve the documents. – Updated Rb dilution calculations: even with much smaller opening time only get > 50cm dilution area. (baffle with 10cm, 10 m). – CERN found an area for tests! Update of plasma cell (Erdem) – Very much in contact with GRANT Decisions on planning (clean tube design ready, etc…) Proposal of TRIUMF contribution (Victor) – Triumf become member of the AWAKE Collaboration!! – BPMs for electron beam line, Faraday cup 9

Topics to Cover in the Next TBs What:Impact on:Deadline:People involved: Electron spectrometer magnet Installation in Jan  order cable now, define PC, decsion on type  6 th TB! September 2014Alexey, Lawrence, Simon, Jeremie, Serial powering of quadrupoles Installation in Jan  order cable now! September 2014Alexey, Lawrence, Simon, Freeze plasma lengthMechanical design, purchase of beam-line elements September 2014  mtg Ans, Patric Erdem, Patric Freeze area downstream the plasma Mechanical design, purchase of beam-line elements September 2014Roxana, Erdem, Patric, Ans, Alexey Approve co-existence of proton and electron beam in common line Design of electron-proton merging area: vacuum system, magnets, beam instrumentation,… September 2014Ulrich, Julia, Chiara, Alexey Location of window, separating AWAKE and SPS Electron background in plasma cell and electron spectrometer, radiation to electronics, vacuum system, mechanical design, purchase September 2014, if moving window is required! Pablo, Alexey, Lawrence, Simon, Jan, Chiara Racks, cablesAvailable space, integration,September 2014All, Ans Fast valve: control system, interlock system, size, Control systemErdem, Patric, VAT, Jan Plasma cell: aperture, baffles, length remote control of pumps, gauges Electron line vacuum, control system, beam optics, electron trapping, electron beam-line design Erdem, Patric, Roberto, Jan, Alexey, Konstantin, Chiara, Janet Plasma cell inner tubeProduction at CERN- to have piece in Dec 2014 Design September 2014 Erdem, Patric, GRANT, Jan, CERN workshop 10

Topics to Cover in the Next TBs What:Impact:Deadline:People involved: Laser/Amplitude: transport UV light, mode-locking externally, compressor design Design of electron source area! Strategy for mode- locking, integration, purchase, production Some parts end September 2014 AMPLITUDE! Patric, Josh, Valentin, Mikhail, Christoph, Ans, Laser system: compressor, mirror mounts, translator. Vacuum compatibility, mechanical design, purchase, production. Elements are ordered. Jan, Valentin, Mikhail, Christoph, Proton beam line instrumentation (common proton/electron/laser) Design. Integration, production, purchase. Lars, CERN BI, Chiara Electron beam instrumentationDesign. Integration, production, purchase. Collaboration. Steffen, Chiara, Lars, CERN BI, TRIUMF Synchronization: Master-clock, … Design, who does whatWolfgang, Andy, Heiko, Steffen, Patric Electron-source: cathode system Design, integration, space, access to other area Steffen, Valentin&Co, Patric, Amplitude. Supports: plasma cell, diagnostics table Design, workshopAns, Patric, Roxana 11

Remarks Take the actions seriously Answer to Actions Take initiative: plenty of additional meetings with core people involved are required to get results for the TB Close link with PEB Some points where action is not very responsive (yet): – Everything where one has to sit down and think through the experiment ?! Racks, cables DAQ Planning – Amplitude 12

Summary The Technical Board is an extremely useful forum to discuss all aspects of the experiment which need to be covered for the design, integration and installation. Working very closely with the Physics and Experiments Board (PEB). Short time-scale of preparing the experiment and the tight planning – Need good coordination – Otherwise we have delay! Task owners and work-package leaders are supposed to take their role very seriously – Provide the necessary results, inputs and put issues on the table as soon as possible. 13