OC Team Ops Notes. Jenn Whitworth I2 PRO 256-961-1604 2 What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)

Slides:



Advertisements
Similar presentations
OCAMS Orbital Communications Adapter (OCA) Management System NASA/JSC/DO/Tim Hall Aug 2011.
Advertisements

AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.
Training Purposes Only JEM PLT OV JMU (Ver. 1.0) 1 Notice : This technical data is furnished on the condition that it will be used by and.
MISSION OPERATIONS DIRECTORATE CARGO INTEGRATION AND OPERATIONS BRANCH Brion J. Au Johnson Space Center/DO55.
GLAST LAT ProjectLAT Engineering Meeting, April 1, 2003 GLAST Large Area Telescope: Performance & Safety Assurance Darren S. Marsh Stanford Linear Accelerator.
09 May 2014page 1 ROCC to PPL ICD Initial Definition ExoMars Rover Operations Control Center ROCC.
LSU 10/09/2007System Design1 Project Management Unit #2.
Standard WBS Version 1.0 WBS2-3.pptPage 1 Standard Work Breakdown Structure Legend = Decomposes to lower level WBS elements 4.0 Implementation 4.0 Implementation.
Columbus Operations Columbus Control Centre 8 October 2009 Prague ASE XXII Congress Space – Opportunities for all An Overview to Columbus Operations Reinhold.
5-1 Constellation Space Suit System Government Capabilities and Facilities Crew and Thermal Systems Division.
NASA PREFERRED TECHNICAL STANDARDS PUBLISHED
Electronic Portable Information Collection (EPIC) System SENTEL Corporation, Alexandria, Virginia Innovation SENTEL and NASA jointly developed the Electronic.
10/14/ :25:29 PM ISSP On-Orbit QA To share with QLF the ISS approach to the On-Orbit Quality Assurance process and the current status NASA QLF
Page No. 1 Kelvin Nichols Payload Operations and Integration Center EO50 Delay Tolerant Networking (DTN) Implementation on the International Space Station.
3-5 March 2004 ESA ODFCB, 3-5 March 2004 ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 Simon Challis, MSM-EO.
Art Nelson, Jr.AMS-02 Technical Interchange Meeting - JSC - January Ground Safety Status.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1 MINUS EIGHTY DEGREE LABORATORY FREEZER FOR ISS (MELFI) MSFC Briefing February 2005 John Cornwell
1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Execute Tailored Procedures (XTP) Status POIWG – July 2015 Lamar Stacy.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
Introduction to Payload Planning Will Kirby (256)
Crew Operations Team Alexia R. Matthews Cold Stowage CPE (256)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
EMCS Facility Status Thomas Niedermaier. This document is the property of Astrium. It shall not be communicated to third parties without prior written.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
MOL The Mission Operations Laboratory First Contact Package June 2011 NASA MSFC Huntsville, Alabama An Introduction to the Payload Systems Team (PLST)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for KSC Payloads #3 of 5 June 5, 2013 Getting.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Status Increment.
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
February 14, 2013 POIWG Technical Overview CR / HM-3430 Ku Forward Capability.
EO10-PPO-051 Revision T 9/25/15 PARC/T. Cassady HRF Rack 2 8PU Drawer Installation and Configuration 1:00 TEXTFlexible Crew  Sessions required as needed.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
INTERNATIONAL SPACE STATION PTC Process Flows August 17, 2007 Robert D. Blum Payload Capability Training Lead
1 Ground Tool Development Process for PRO/DMC/PHANTOM/CPO Robbie Hawkins/PRO.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Safety Operations at.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Flight Control Team.
EO10-PPO-056 Revision I 9/24/14 PARC/T. Cassady Portable PFS :20 BP Microphone Replacement TEXTFlexible Crew  Sessions required once every 18 months (within.
ESA Payload Operations Overview: MSL August 07, 2009 / POIC-MSFC.
Payload Operations and Integration Center MSFC Daily Summary for PDs.
POIC Safety Payload Operations & Integration Center Mitchell Moore Marshall Space Flight Center ARES Corporation POIC Safety 1.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG #35 January 27-31, 2014 Ann Bathew EO03/Operations Directors.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Safing Methods Daniel Massey EO10 (256)
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
National Aeronautics and Space Administration July 2015 POIWG Face-to-Face: Thruster Constraints Planning and Coordination Ben Honey ADCO Specialist Flight.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama First Contact Package Last updated June 2011 Payload Operations and Integration Function.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for SLOSH #2 of 5 July 17th, 2012 The Operations.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
Higher Active Logic Build Three (HAL 3) PLMDM Bundle Update Express Rack 4 Update David K Deitsch Marshall Space Flight Center Payload Operations & Integration.
File Uplinks Through the Payload MDM POIWG Session 15 Tuesday, September 9, 2003, 3:15 to 3:35 David Deitsch, CPO Command and Data Systems Team MSFC Flight.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Initial MELFI Facility.
I&T&C Organization Chart
Technology for a NASA Space-based Science Operations Grid Internet2 Members Meeting Advanced Applications Track Session April, 2003 Robert N. Bradford.
Integration and Test Organization Chart
Integration & Test Instrument Operations Coordination
Jeff Dutton/NASA COR August 26, 2019
Presentation transcript:

OC Team Ops Notes

Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO) method of documenting pre-flight problem reports and on- orbit anomalies and their associated workarounds Ops notes cover: –system workarounds –EXPRESS Rack workarounds –payload (subrack or facility) workarounds –International Partner payload workarounds –Ground System workarounds

Jenn Whitworth I2 PRO How are they developed? KSC testing – PR’s and IPR’s generated during stand- alone and integrated ops testing in PRCU or PTCS Development inputs – JSC, EXPRESS, and PD’s provide inputs for known problems, limitations, or features Equipment degradation or failure documented by Payload Anomaly Reports (PAR) Simulations and ground system tests

Jenn Whitworth I2 PRO Ops Note Form

Jenn Whitworth I2 PRO Ops Notes Naming Convention ON – Designates this is an ops note Payload/system – designates the payload and or system affected. For I2 this is EHS, EXPRESS, HRF, PLDs, ADVASC, CGBA, CPCG, MAMS, SAMS, STES9, STES10, TCS, EPS, ECLSS, PLMDM Category – Electrical (ELE), Fluids (FLD), Hardware (HW), Mechanical (MECH), Software (SW), ISS Systems (ISS), Ground Support Equipment (GSE) Number – Automatically assigned in database Example: ON-EXPRESS-SW-4

Jenn Whitworth I2 PRO Where do we stand now? At the current time we have 54 ops notes written –39 Software –6 Ground Support Equipment –5 Hardware –3 Fluids –1 Electrical

Jenn Whitworth I2 PRO Ops Note Maintenance PSE will maintain database Life of Ops notes may be: –Permanent –Increment/Flight specific –Closed Once an Ops note is closed it will be archived Ops notes will be viewable on the RICO webpage under “real-time products”

Jenn Whitworth I2 PRO Ops Note Flow PRE-INCREMENT SOURCE: KSC Testing (PRs/IPRs) Training, Planning SPRs, NCs Safety Data Package EI GL & C Document Changes made to appropriate documents POH JOIP GCP Crew Procedures Flight Rules/Payload Regs Console Handbook ECR Process REAL-TIME SOURCE: PARS System Anomaly Reports (SAR) Software updates ORU replacements OCR Process At TBD Interval Existing Ops note revised as needed New Ops notes added Closed Ops notes archived

Jenn Whitworth I2 PRO Forward Work Develop SOP to define process for maintaining Ops Note Database Expand database to include IP payloads

Jenn Whitworth I2 PRO Acronym List ADVASC- Advanced Astroculture AOS- Acquisition of Signal CGBA- Commercial Generic Bioprocessing Apparatus CPCG- Commercial Protein Crystal Growth CPO- Command and Payload MDM officer ECLSS- Environmental Control and Life Support Systems ECR- Engineering Change Request EHS- Enhanced HOSC system EI- EXPRESS Integration ELE- Electrical EPS- Electrical Power System EXPRESS- EXpedite the PRocessing of Experiments to Space Station FLD- Fluids GCP- Ground Command Procedures GL&C- Guidelines and Constraints GSE- Ground Support Equipment HRF- Human Research Facility

Jenn Whitworth I2 PRO Acronym List HW- Hardware IP- International Partner IPR- Interim Problem Report JOIP- Joint Operations Interface Procedures LOS- Loss of Signal MAMS- Microgravity Acceleration Measurement System MECH- Mechanical NC- Nonconformance OC - Operations Controller OCR- Operations Change Request ORU- Orbital Replacement Unit PAR- Payload Anomaly Report Paycom - Payload Communications Manager PCG-STES- Protein Crystal Growth - Single Thermal Enclosure System PD- Payload Developer PLD- Payload

Jenn Whitworth I2 PRO Acronym List PLMDM- Payload Multiplexor/Demultiplexor POH- Payload Operations Handbook PR- Problem Report PRCU- Payload Rack and Checkout Unit PRO - Payload Rack Officer PSE- Payload Systems Engineer PTCS- Payload Test and Checkout System RIC- Rack Interface Controller RICO - Realtime Interface Coordination Officer SAMS- Space Acceleration Measurement System SAR- System Anomaly Report SOP- Standard Operating Procedure SPR- Software Problem Report SSPC- Solid-State Power Controller SSPCM- Solid-State Power Controller Module SW- Software TCS- Thermal Control System