Prototype Review 04-Sept-2008. Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…

Slides:



Advertisements
Similar presentations
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
Advertisements

1 st Petal Prototype Fabrication completed October 27, 2008.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
1 David Santoyo Petal Locking Points: AUW Nov 2014 Petal Locking Points.
Test Chamber Assembly, 1.5M Long (59.00”) Vacuum Tube, 4.00 OD x 3.50 ID Vacuum Tube, 3.75 OD x 3.51 ID 3.375” CFF, Non-Rotatable Feedthrough, Ceramtec.
ATLAS Pixel Detector February 2003 N. Hartman LBNL 1 Pixel Support Tube PRR: Assembly, Production, Schedule February 2003.
, CLIC Test Module Meeting Status of the DB Quad adjustable support design Mateusz Sosin CLIC Module WG Meeting, 22-May-2013.
MICE Installation and Commissioning meeting RAL, 12 June 2007 Diffuser Oxford University.
Geometric Dimensioning and Tolerancing
Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
DELTA Quadrant Tuning Y. Levashov, E. Reese. 2 Tolerances for prototype quadrant tuning Magnet center deviations from a nominal center line < ± 50  m.
ZQNA Electrostatic Quadrupoles for ELENA Transfer Lines 1.Conceptual design 2.Performance 3.Engineering details 4.Interfaces 5.Production planning D. Barna,
Tooling and assembly of US stavelet at Berkeley S. Díez Cornell, C. H. Haber, M. Defferrard, R. Witharm Sept 6th, 2012 Berkeley mechanical meeting, 5th-7th.
Recent Mechanical Barrel Stave Development BNL; S. Duffin, A. Gordeev, D. Lynn, G. Mahler: LBNL; C. Haber, M. Gilchriese: Yale; W. Emmett, A. Martin, P.
Geometric Dimensioning and Tolerancing
1 GLASTGLAST Pisa GLAST Italia meeting, 18/02/02 A.Brez – INFN Pisa GLAST:Gamma Ray Large Area Telescope Ladders, Trays and Towers Construction A.Brez.
Ciemat Mechanical Structure Proposal for a DHCAL m 3 Prototype. Enrique Calvo Alamillo Paris
FEBRUARY 2003 Pixel Support Tube A. Smith LBNL 1 ATLAS Pixel Support Tube PRR: Parts Pixel Support Tube Production Readiness Review Parts Overview Alexis.
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
EC front unit status. Outline Conclusions from mechanical prototype and actions taken Status of electrical prototype KIT’s work for TA Dev plan (tests)
1m 3 SDHCAL Mechanic Structure M.C Fouz 8/10/2010 The 1m 3 prototype Mechanical Structure is financed by: Spanish HEP National Program by the project FPA
G.Barber KEK Test Beam Update, Berkeley 9 Feb KEK Test Beam – Tracker Progress Contents:- Station Space Frame Light Guide Map Station Connectors.
M. Gilchriese - April 2001 Disk Sector Status. M. Gilchriese - April Technical Status Three prototypes to current dimensions(8-sector disks) except.
A thermo-mechanical petal Sergio Díez Cornell Petal discussion, 24 Oct 2014.
Mechatronics Task Force, 26-nov-02 Olivier Teller, CERN EP-CMA1 Cooling Mechatronics Schedule.
Strip Stave cores Stephanie Yang ATLAS upgrade Oxford activities, January 2015.
Thermo-mechanical petal status Sergio Díez Cornell 23Jan 2015.
DIFFUSER HARDWARE REPORT V. Blackmore J. Cobb, M. Dawson, J. Tacon, M. Tacon.
Hybrid Mechanical/Thermal Design Ray Thompson / Manchester FP420 meeting Torino 11/12 July 06.
Stave C channel side closeout gluing jig S Yang WP4 monthly meeting at Liverpool University 26 th March 2014.
Vessel dimensions GTK assembly carrier Electrical connections Cooling pipes integration Vessel alignment with the beam Next steps Conclusion 3/10/20102.
TOB meeting, TOB meeting 20 September 2005, Antti Onnela: TOB mechanical integration status and plans n TST-TOB-TIB integration exercise n.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Stave130 Assembly Jig (Tim). Current Tooling Components – CF jig + ‘C’-channel jig & various face-sheet positioning aids It works! – Seems to produce.
ATLAS Pixel Detector September 2002 N. Hartman LBNL 1 Pixel Support Tube: Cost and Production Schedule September 2002.
M. Gilchriese Work Plan W. Miller iTi M. Cepeda, S. Dardin, M. Gilchriese, C. Haber, R. Post LBNL February 6, 2007.
Enrique Calvo Alamillo Ds DHCAL m 3 modular structure. 2. Basic modular distribution. 3. Guiding and repositioning system. 4. Detector.
1.2 m Stave with Co-cured Facings Using Low Areal Density Fiber G. Viehhauser (Oxford) C. Haber (LBNL) T. Hurteau, W. Emmet (Yale) R. Rurns, D. Lynn (BNL)
Stavelet 09 and Storage/Assembly/Survey Frame Progress Report Brookhaven National Laboratory David Lynn, Susan Duffin, Anatoly Gordeev, Ken Sexton Yale.
Three Pin Coupling Assembly Grey – Upper Arm Red – Arm Interface Plate with Pins for Coupling Blue – Wrist Interface Plate with Receptacles Wrist – Not.
Stave Tooling & Plans for Future Stave-building (Tim)
Engineering drawing Every language has its own rules of grammar. Rules of grammar : Lines, lettering, and dimensioning.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
LIGO-G D Design Requirements Larry Jones Advanced LIGO, Seismic Isolation System (SEI) Structural Design & Fabrication Bidder’s Conference April.
Meeting at Chooz PMTs Mechanical support on the Buffer. Updates. Enrique Calvo Alamillo
IRC/SAC status Venelin Kozhuharov for the SAC/IRC working group NA62 Meeting
Thermo-mechanical petals Volker Prahl, Sergio Díez, on behalf of the petal community CERN AUW, 3 rd Nov 2014.
CONCEPTUAL DESIGN OF D2 MECHANICAL STRUCTURE (DOUBLE COLLARING OPTION) S. Farinon, P. Fabbricatore (INFN-Sezione di Genova) Sept. 24 th 2015.
Strip Stave Status & Plans at Yale Yale: Paul Tipton, Will Emmet, Tom Hurteau.
ORKA support - status report Scope of conceptual design task Develop a conceptual design for how to support the ORKA detector inside the CDF detector Develop.
Thoughts about PS module assembly Ulrich Heintz, Meenakshi Narain, Bill Patterson, Eric Spencer, Juan Trenado Brown University, Providence 4/16/2015Heintz,
EC: 7 DISK concept Preliminary considerations
Straw man layout for ATLAS ID for SLHC
“CENTRAL SUPPORT FRAME” -
SO RPW Antenna FEM Details
Update on Pavia MM mechanical prototype
new straw end plug: D=10.6 mm straws support frame Levan option
Strip Petals: Local supports and prototype tests
F.E.T.S. Mechanical Engineering Update
? ENDCAP: Mechanics IFIC-Valencia.
ERMC/RMM activities May 2017
Integration issues at IHEP
Reminder of Stave250 Tooling Design
Rod adaptors for module tests Module positioning studies
- chambers & absorbers -
Task 12 Describe the application and use of modelling tools (such as for straight lines, curves and circles; how to add dimensions and text to drawings).
Cubes & Spheres.
Working Drawings Legal Documents that Provide All the Visual, Numerical and Textural Information Required to Manufacture a Component, Mechanism or Structure.
SNS PPU Cryomodule Space Frame
Presentation transcript:

Prototype Review 04-Sept-2008

Different side-closeout to allow petal end-insertion concept…self- guided… Only backup from last review in July…

First thoughts… End insertion mechanism by self- guided rails would be interesting… How do we assemble the petals in here?

New concept… (from David Lynn) We still need to check if the end-insertion is possible with this system… taking into consideration that the petal it is not squared… The main advantages: -CF tubes are supplied by vendor… -Mass and Radiation length advantage… -Others…

CF TUBES HOLES FOR POSITIONING-PINS SI SHAPE ALREADY MODIFIED. DUMMY SENSORS WILL BE READY MIDDLE-END SEPTEMBER CLEARANCE BETWEEN HONEYCOMB AND REST OF COMPONENTS INCREASED TO 0,125” IMPROVEMENTS FROM LAST REVIEW…

CF TUBES HOLES FOR POSITIONING PINS ASSEMBLY TOLERANCES POCOFOAM & HONEYCOMB… HONEYCOMB THICKNESS STRAIGHT POCOFOAM CURVED POCOFOAM SS TUBE: OD: 0,109” ID: 0,085” FIXED DIMENSION FROM VENDOR CONTINUE IMPROVEMENTS AND MODIFICATIONS…

FIRST THOUGHTS FOR TOOLING… (FROM CARL AND GIL TEAM…) HOLES FOR ALIGNMENT VACUUM CHUCK FACING ALIGNMENT HONEYCOMB PLATE NEXT TODO: TECH. DRAWINGS FOR TOOLING