ION-F Sensors USUSat –4 external accelerometers –8 internal thermocouples UW Dawgstar –3 external accelerometers –8 internal thermocouples VT HokieSat.

Slides:



Advertisements
Similar presentations
The IRIS-Bus Concept for Seismic Instrumentation John D. West Arizona State University.
Advertisements

Overview of this presentation: Introduction to the BLUEsat Project What are the objectives of this thesis project Overview of testing and integration.
VT Battery Box. 0.05” 0.005” Schwartz, J. Bergquist, A. 18/10/01 07/11/01 Battery Box Frame AA21302-DWG10 1 of 1 AA1302-DWG10 1 of 1 2 Al 6061-T6 2 INTERIOR:
The Incredible HUD ADITYA B. BRANDON G. MARCELO L. NIKHIL S.
HokieSat Thermal System Michael Belcher Thermal Lead December 11, 2002.
System Identification of a Nanosatellite Structure Craig L. Stevens, Jana L. Schwartz, and Christopher D. Hall Aerospace and Ocean Engineering Virginia.
Location Tracking for Indoor Environments Student ID : Q Reporter :王滋農 Reporter :王滋農.
Antennas. Tokyo Inst. of Tech. (CUTE –1) Three Antennas One 500 mm (or /4) antenna for MHz. Two 170 mm (or /4) antennas for downlink.
1 May 18, 2007Team # 7103: METEOR Instrumentation Platform M.E.T.E.O.R. Instrumentation Platform Matt Lipschutz Rashmi Shah Adam Gutterman Jessica.
EEE440 Modern Communication Systems Satellite Systems.
Team Thermasense Thermal Wireless Sensor. Where Does Thermasense Fit In? Re-Entry problems: Space vehicles are heavily instrumented. Wires can introduce.
BAE SYSTEMS PROPRIETARY – Internal Use Only Unpublished Work Copyright 2014 BAE Systems. All rights reserved. BAE Systems C2C SWAT Project Tutorial 3,
EUSO-BALLOON CDR – Agenda (I). Internal interfaces overview Batteries and Low Voltage power Supplies PDM interfaces DP interfaces HK Interfaces List of.
Wireless Sea Measurement Unit A Plan for Aarne Halme Project Juha Vanhalakka Erkka Mutanen.
Mobile App Development for Indoor Navigation Problem, targeting Users with Visual Impairments Participants: Sunggye Hong (GCOE), Ilmi Yoon (CSE), and Arno.
Integrated Orbit and Attitude Control for a Nanosatellite with Power Constraints Bo Naasz Matthew Berry Hye-Young Kim Chris Hall 13th Annual AAS/AIAA Space.
AMSAT Fox-1 Overview AMSAT Engineering Team 2011 Space Symposium.
Locate Wildlife Attach to Arrow Access Arrow Attach to Wildlife Does not alter Shot Detach from Arrow Link to Animal Remains attached during Flight Protect.
HokieSat Introduction
Air Racer Design and Layout.
WALL FOLLOWING ROBOT USING I-BOT mini V3
Virtual Imaging Peripheral for Enhanced Reality Aaron Garrett, Ryan Hannah, Justin Huffaker, Brendon McCool.
X.xxx kg Your Name SSE, Etc. DD/MM/YY 0.010” 0.005” 0.5 O Insert Name Here Insert Drawing Number # of # None Required TBD Drawing Name # of # # I O N -
Figure 12.1 The UP1-bot. Figure 12.2 Left: Radio Control Servo Motor and Right: Servo with Case and Gears Removed.
Design Concept & Technical Requirements Chest Component.
ADT490 TroubleShooting Locating Opens. 2 Power Supply Grounding Power Supply has circuit -> allows positive & negative outputs to float relative to ground.
ABSTRACT: ECE 477 Team Autonomous Rescue Vehicle Presented by Vipul Bhat Our team’s goal is to build a prototype of a robot that can autonomously.
719CELL INTERCONNECTNICKEL 62RAYCHEM POLYSWITCH 51REAR RETAINERDELRIN 41INTERNAL SHELFELECTROLESS NICKEL PLATED & IRIDITED ALUMINUM 6061-T6 320SANYO NiCad.
STARCAL Satellite Intro Prepared By: Cordell Grant Date: December 6, 2012.
AA21301-DWG01Detail View of Isogrid AA21301-DWG02Top View of End Panel AA21301-DWG03Multiple Views of Side Panels AA21301-DWG04Front View of Side Panel.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 SDX Module Anthony Monteiro
AMATEUR SATELLITES NUMBER AND STATUS CONSTANTLY CHANGING
0.29”.38” 3.00” 2.00” 1.70”.80”.61.49” 1.45”.64” 1.41”.19”.5 6” x.xxx kg Sean Findlay Sean Findlay. 02/27/01 03/01/ ” 0.005” 0.5 O Downlink Transmitter.
HokieSat Introduction
1 Connections Central Building North End West End Pr Qr Pr Qr Pr Qr GClocking GC alignment Sc *10 Sa Pr Inj. Timing SystemDOL inputDOL outputLocal InputLocal.
TYPE I TYPE II TYPE I Front View # 32 TAP DRILL 4 places B TYPE.
ECE 4006B Fall, 2002, Group 1, Mei Chan Progress Report Period (November 22-December 5, 2002) Receive and complete assemble 2 nd PCB board Complete the.
Submission doc.: IEEE /1314r2 November 2015 Interdigital CommunicationsSlide 1 I/Q Imbalance Impact to TGax OFDMA Uplink Reception Date:
GPS Enhanced PFD System Software Presentation Eric Grossmann.
Wiring Stuff To Do Internal APL coax Radios to Antennas (GPS, XL, UL, DL) “The Bottom Panel”  CEE mods 1WB (where are pcbs needed?) Sep system connectors.
Top view X-plane transmitter Y-plane transmitter Z-plane transmitter Fiber-optic Harness P.C. with WiFi wireless Battery Driver Receiver modules.
Pre-Flight Briefing Pima Community College November 18-19,
Front End. Charge pre-amp and detector Voltage regulator. TOP side. Detector linear voltage regulator BOTTOM side. Charge pre-amp.
AMSAT-SA Digital Transponder, telemetry and command system.
ECE 5233 Satellite Communications
Utah State University - University of Washington - Virginia Tech.
VT Battery Box.
Overview 3 2 Introduction Design Analysis Fabrication Testing
Date of download: 11/6/2017 Copyright © ASME. All rights reserved.
WARNINGS Side Description COMPONENTS SIDE (TOP) EXPRESSIONS BOARD 1/2
Box 1 (VT).
सोलर पॅनेलचा उपयोग करुन रीचर्जेबल टॉर्च बनवणे.
HA1L High Altitude 1U Laboratory
Utah State University - University of Washington - Virginia Tech.
CEE cells Type I and Type II
HA1L High Altitude 1U Laboratory
Joe Trefilek Jeff Kubascik Paul Scheffler Matt Rockey
Dave Mawdsley, DACS Member, Linux SIG January 16, 2013
HALT: Notebook Computer Case Study
Utah State University - University of Washington - Virginia Tech.
System Identification of a Nanosatellite Structure
Utah State University - University of Washington - Virginia Tech.
CubeSat vs. Science Instrument Complexity
Door Panel Door panel can open after 1800 angle /KK/12_RPP_04
Changes made to the WA-LISTS in 2015
UCSB Dicing, Wire-Bonding and Board Assembly
BETONLINEBETONLINE A·+A·+
<Your Team # > Your Team Name Here
Door Panel Door panel can open after 1800 angle /KK/12_RPP_6
Door Panel Door panel can open after 1800 angle /KK/12_RPP_05
Presentation transcript:

ION-F Sensors USUSat –4 external accelerometers –8 internal thermocouples UW Dawgstar –3 external accelerometers –8 internal thermocouples VT HokieSat –4 external accelerometers –8 internal thermocouples

USUSat External Accelerometers –1 each on panels 2, 4, 6, zenith Internal Thermocouples –Uplink Rx –Downlink Tx –CEE near power board –CEE near CPU –APL NCLT Module –APL GPS preamp –Telemetry beacon –Battery box

D/L Transmitter U/L Receiver APL NCLT Module CEE GPS Preamp Beacon Box Battery Box USUSat Thermocouples

4.6875” 2.00” USUSat Side Panel 2

1.575” 2.00” USUSat Side Panel 4

2.00” 2.75” USUSat Side Panel 6

15.40” 3.20” USUSat (stack) Zenith Panel

UW Dawgstar External Accelerometers –1 each on panels 2, 3, 4 Internal Thermocouples –Uplink Rx –Downlink Tx –CEE near power board –CEE near CPU –APL NCLT Module –APL GPS preamp –PPU box –Battery box

GYRO MOUNT (AA UW Dawgstar Thermocouples U/L Receiver CEE

` Bottom panel component arrangement `` UW Dawgstar Thermocouples D/L Transmitter APL NCLT Module Battery Box GPS Preamp PPU

UW Dawgstar Side Panel 2

UW Dawgstar Side Panel 3

UW Dawgstar Side Panel 4

VT HokieSat External Accelerometers –1 each on panels 2, 4, 5, 6 Internal Thermocouples –Uplink Rx –Downlink Tx –CEE near power board –CEE near CPU –APL NCLT Module –APL GPS preamp –PPU box –Battery box

VT HokieSat Thermocouples U/L Receiver PPU Note that the mounting location may be shown in lieu of the actual component. Battery Box CEE D/L Transmitter APL NCLT Module (on zenith panel) GPS Premod (on zenith panel)

VT HokieSat Side Panel 2

VT HokieSat Side Panel 4

VT HokieSat Side Panel 5

VT HokieSat Side Panel 6