Presentation is loading. Please wait.

Presentation is loading. Please wait.

Pre-Flight Briefing Pima Community College November 18-19, 2011 1.

Similar presentations


Presentation on theme: "Pre-Flight Briefing Pima Community College November 18-19, 2011 1."— Presentation transcript:

1 Pre-Flight Briefing Pima Community College November 18-19, 2011 1

2 Team Members Team Lead: Tiffany Bledsoe Electronics: Chad Olivieri Kevin Huffman Blair Yates Marie Anderson Camera: Alex Hoobler Brad Esquibel Chance Fribbs Data Analysis: Pablo Brandenburg Faculty: Mike Sampogna Dr. Denise Meeks Pablo Brandenburg The Team

3 Pima Community College Reusable electronics stack Single camera video payload Reusable Electronics Stack Go Pro Hero HC Camera

4 Electronics Payload  Temperature  Pressure  Accelerometer  Gyro  Strain Gauge GPS device with internal data recorder Electronics Payload Side View

5  Temperature – Thermistors and Thermochron buttons  Air Pressure - pressure sensor  Acceleration – accelerometer  Attitude – three-axis gyroscope  Strain Gauges – strain gauges amplified with a Wheatstone Bridge circuit Data Collection Electronics Stack Bottom Board Strain Gauge

6 GoPro Hero 1080p HD Upside down mode Wide angle recording Battery warmer One button to record Camera payload

7 Design Goals Record video from launch to landing Record video of balloon burst Simple design, with no electronics Balloon At Burst Earth

8 Final design Air muscle Releases camera at 70,000 ft. or 36 mmHg Decreases in length by 6 mm Camera Payload

9 Acknowledgements 8 Special thanks to the following: Susan Brew and NASA Space Grant Consortium Jack Crabtree and ANSR Mike Sampogna Dr. Denise Meeks


Download ppt "Pre-Flight Briefing Pima Community College November 18-19, 2011 1."

Similar presentations


Ads by Google