1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)

Slides:



Advertisements
Similar presentations
LCABD WP 4.2 Review, 12 th April Mark Slater  Motivation  BPM and Electronics Development  BPM Simulation  Update on NanoBPM Progress  Update.
Advertisements

ATF2: Status Update Glenn Christian (on behalf of FONT group) 10 th ATF Project Meeting.
P.N. Burrows ATF2 Project Meeting, KEK, 14/12/091 Feedback On Nanosecond Timescales Philip Burrows Glenn Christian Hamid Dabiri Khah Javier Resta Lopez.
Update of EXT Stripline BPM Electronics with LCLS-style Digital BPM Processors Glen White, with slides by Steve Smith 15 December 2009 ATF2.
Linac4 BPM and Phase Pickup L. Søby08/ LINAC4 Beam Position, Phase and intensity Pick-ups.
1 KEK Cavity BPM Hitoshi Hayano Development of Cavity BPM for Q-magnet attachment, Aiming; compact design, 0.2µm resolution, BPM center error (between.
Beam position monitors LCABD Plenary meeting Bristol, 24th March 2009 A. Aryshev, S. T. Boogert, G. Boorman, S. Molloy, N. Joshi JAI at Royal Holloway.
C and S band BPM system update A. Aryshev, S. T. Boogert, S. Molloy, C. Swinson 5/25/20151ATF2 Software meeting.
P. Emma, SLACLCLS Commissioning – Sep. 22, 2004 Linac Commissioning P. Emma LCLS Commissioning Workshop, SLAC Sep , 2004 LCLS.
Bob Lill Undulator Systems – Cavity BPM October 12, 2006 Undulator Cavity BPM Status.
Ron Johnson Beam Position October 29-31, Beam Position Monitors FAC Review October 29-31, 2007 Stripline BPM.
Bob Lill Undulator Cavity BPM System April 16, 2007 Undulator Cavity BPM Status.
-brief report of October runs and some inputs for the Nov/Dec planning – Nobuhiro Terunuma, KEK, ATF ATF session on LCWS13, Tokyo Univ., Nov. 13, 2013.
ATF2 Q-BPM System 19 Dec Fifth ATF2 Project Meeting J. May, D. McCormick, T. Smith (SLAC) S. Boogert (RH) B. Meller (Cornell) Y. Honda (KEK)
IP-BPM NOV. BEAM TEST RESULTS Siwon Jang (KNU). 11cm Low-Q IP-BPM design  11cm Low-Q IP-BPM drawings of HFSS 100mm Sensor cavity Wave guide Antenna Designed.
High Resolution Cavity BPM for ILC final focal system (IP-BPM) ILC2007/LCWS 2007 BDS, 2007/6/1 The University of Tokyo, KEK, Tohoku Gakuin University,
Status of QBPM Electronics and Magnet Movers as of June 3 rd 2008 D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
Personal strategy for ATF2 beam operation in 2009 Toshiyuki OKUGI 2009 / 7 /22 ATF2 weekly meeting.
Status of ATF2 Cavity BPM Project Sep 29, 2005 Project Scope: Instrument both couplers ATF2 cavity BPM’s (35) Produce prototype for December cavity test.
Installation and checkout of QBPM system Hardware to be installed –Install hardware in racks –Install CPU /SIS digitizers/VMIC 3122 analog digitizers/Digital.
BPMs and HOM-BPMs for the XFEL Linac N. Baboi for the BPM and the HOM teams (DESY, CEA-Saclay, SLAC, FNAL, Cockroft/Daresbury) XFEL Linac Review Meeting,
FJPPL-FKPPL Workshop on ATF21 FONT digitisation studies of IP BPMs D. Bett, N. Blaskovic, P. Burrows, G. Christian, M. Davis, Y. I. Kim, C. Perry John.
Design and Fabrication of a Q-BPM Calibration Tone Generator for the ATF2 Ian Bullock August 14, 2008.
Beam phase and intensity measurement Grzegorz Kasprowicz Richard Jacobsson.
NanoBPM Signals Second Mini-Workshop on Nano Project at ATF December 11-12, 2004 Toyoko Orimoto Yury Kolomensky Lawrence Berkeley Laboratory & University.
BPM-Based Energy Spectrometer Contributors: A. Lyapin, B. Maiheu, F. Gournaris, D. Attree, M. Wing, D. Miller University College London (UCL) M. Slater,
C/S-band cavity BPMs A. Aryshev (KEK), S. T. Boogert G. Boorman, F. Cullinan, J. Frisch, A. Heo, Y. Honda, J.Y. Huang, S.J. Hwang, N. Joshi,
Fiber Loss Monitor and Carbon IP Scanner Setup and operational tips August
ATF Instrumentation Status and Planning 3 December 2007 Juan Cruz, Justin May, Doug McCormick, Janice Nelson, Tonee Smith, John Wray.
TBL as a 12 GHz power source, overview and first results from commissioning IWLC 2010 workshopSteffen Döbert, BE-RF  Current status of TBL  Status of.
ATF2 Mover Software 19 June 2008 Janice Nelson, Doug McCormick (SLAC) Glen White (LAL/SLAC) Justin May (no longer at SLAC)
Mark Woodley, SLACATF2 Project March 20-21, Summary of Tuning, Corrections, and Commissioning.
1 ATF2 Q BPM electronics Specification (Y. Honda, ) Design System –Hardware layout –Software –Calibration Testing Production schedule ATF2 electronics.
Requirements concerning the interface linking the BPM to the quadrupole M. Wendt, S. Zorzetti.
Instrumentation Summary: Instrumentation QBPMs, Magnet Movers and Remote Shift Participation Justin May SLAC.
1 Linac/400 MeV BPM System Plans and Status Nathan Eddy PIP Meeting 9/7/11.
Philip Burrows ATF2 project meeting 14/1/111 Plans for ATF2 IP Feedback Philip Burrows, Colin Perry John Adams Institute Oxford University.
1 ATF Instrumentation Status and Planning Justin May, Juan Cruz, Doug McCormick, Janice Nelson, Tonee Smith, John Wray 1.
Production and Installation Policy of IP-BPM ATF2 Project Meeting, 2006/12/18 Y. Honda, Y. Inoue, T. Hino, T. Nakamura.
1 Franz-Josef Decker 1 Multi-Bunch Operation for LCLS Franz-Josef Decker March 17, Definitions and goals multi-bunch within.
IP BPM’s for ATF2 Vladimir Vogel KEK May30, 2005 Third Mini-Workshop on Nano Project at ATF.
ATF2 Tuning Summary Nov & Dec 2010 Glen White, SLAC 11 th ATF2 Project Meeting, SLAC Jan
SLAC ESA T-474 ILC BPM energy spectrometer prototype Bino Maiheu University College London on behalf of T-474 Vancouver Linear Collider.
Craig Drennan Linac and 400 MeV BPMs January 7, 2011.
ATF DR BPM Upgrade Janice Nelson, Doug McCormick, Justin May, Andrei Seryi, Tonee Smith, Mark Woodley.
N. BlaskovicFONT Meeting1 ATF November 2013 shift plan N. Blaskovic.
Cavity BPM: Multi-bunch analysis N Joshi, S Boogert, A Lyapin, F. Cullinan, et al. Royal Holloway University of London,
Low-Q IP BPM Y. I. Kim *, A. Heo, E-S. Kim (KNU) S. T. Boogert (JAI) D. M. McCormick, J. May, J. Nelson, T. Smith, G. R. White (SLAC) Y. Honda, N. Terunuma,
Development of a High Resolution Cavity BPM for the CLIC Main Beam
1 IP FB tests at ATF2 Philip Burrows Douglas Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Young Im Kim, Colin Perry John Adams Institute Oxford.
For discussion of ATF2 beam time requests SLAC team October 1, 2008.
LCLS Digital BPM Processor for ATF2 Extraction Line BPMs Steve Smith 26 August 2009.
Interferometric Residual Phase Noise Measurement System Pakpoom Buabthong Lee Teng Internship Program Advanced Photon Source Accelerator System Division,
LEReC BPM Status P. Cernigla, R. Hulsart, R. Michnoff, Z. Sorrell June 2, 2016.
Moving Wire, Pulsed Wire and Long Coil Measurements on the SSRL Beam Line 5 EPU Scott Anderson SLAC Magnetic Measurements.
Current Status of QBPM Electronics and Magnet Movers D. McCormick, J Nelson, G White SLAC S Boogert Royal Holloway Y. Honda, Y.Inoue KEK.
1 FONT IP FB Philip Burrows Robert Apsimon, Doug Bett, Neven Blaskovic, Glenn Christian, Michael Davis, Colin Perry John Adams Institute Oxford University.
Glen White, SLAC Jan th ATF2 Project Meeting, KEK
ATF/TTF Instrumentation March 19, 2007 Last report: January 22, 2007
Re-entrant BPM R&D for ILC Main Linac
NanoBPM Progress January 12, 2005 Steve Smith.
ATF/TTF Instrumentation Nov. 27, 2006 Last report: Oct. 2
Cherrill Spencer, SLAC Member of ATF2 Magnet Team
ATF2 Mover Software 15 December 2008
LCLS Cavity BPM Electronics Undulator Week January 22, 2008
ERL BPM System Mike Billing, Mark Palmer
Fabrication of KEK-ATF2 Q-BPM
ATF ICB meeting, LCWS08, UIC, Chicago, 11/18/2008
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
Breakout Session SC3 – Undulator
Presentation transcript:

1 ATF2 Q-BPM Magnet Movers & 1 st Pulse Calibration Progress from May 7-11 J. May, D. McCormick, T.Smith (SLAC) S. Boogert (RH)

2 Magnet mover progress Installed electronics for the Magnet mover test bed and Honda-san’s BPMs. Established control of motors Reading out cam angle potentiometers and LVDT.

3 1 st Pulse Calibration Progress Installed electronics on reference, prototype and test bed RF cavities.Installed electronics on reference, prototype and test bed RF cavities. Adjusted phases of all cables as described in step 1Adjusted phases of all cables as described in step 1 Measured distance between prototype and test bed bpm. Distance = 2824mm +-2mm.Measured distance between prototype and test bed bpm. Distance = 2824mm +-2mm. At 6426 MHz the phase difference between the cavities is ~26 deg.At 6426 MHz the phase difference between the cavities is ~26 deg. Because this phase difference is less than 180deg, the waveforms for the prototype and the test bed bpms will have the same phase when the beam is in the same quadrant.Because this phase difference is less than 180deg, the waveforms for the prototype and the test bed bpms will have the same phase when the beam is in the same quadrant.

1 st Pulse Calibration Method

5

6

7 ATF bpms 11 &12 both positive Y position. Prototype bpm is between bpms 11&12 and is also positive Y position From phase matching cables and phase information from the distance between bpms, the test bed bpm should also be positive Y.

8 If beam is positive Y in the BPM, moving the bpm up will place the beam at a negative Y position. As beam moves across center line of bpm the phase of the waveform will flip. Test bed quad and BPM

9 Moving the bpm up flips the phase of the signal. This indicates that the phase information from the cable matching and the bpm distance measurements correctly determines the sign for the positive Y position.

10 Confirm that bpm separation determines the phase for a positive Y signal. Unable to move bpm in Z. Adjust test bed LO phase by 180 degrees with short section of cable. This cable effectively moves the test bed bpm 180degrees or ~23mm closer to the prototype bpm. Repeat the previous experiment and move the bpm up.

11 After phase shifting the test bed LO, the beam was steered until wave form has the same phase as the prototype wave form.

12 Test bed bpm is moved up. Although it looks like a there may be a phase shift…….

13 Overlaying test bed waveforms before and after bpm move shows no phase shift.

14 Goals for this week Develop magnet mover software for bpm calibration Develop software for 1 st pulse calibration amplitude scaling. Compare results of 1 st pulse calibration to normal magnet mover calibration.

15 X lvdt counts for y move Pure y move would ideally read zero change in counts from x lvdt –Smooth surfaces important for lvdt bearing surfaces 30 counts ~= 5.3 micrometers

16 Goals for 1st pulse calibration method Measure distance between prototype and test bed bpms Phase match cables from bpms to digitizer for prototype and test bed cavities Verify 1st pulse calibration scheme using prototype and test bed cavity. Develop software for scaling raw bpm waveforms to beam positions. Calibrate test bed bpm using magnet mover. Compare position of calibrated bpm with scaling of raw waveforms.

17 Goals for Magnet movers Finish read back of camshaft ADC and LVDT module. Integrate mover “C” code to run with Matlab calibration routines. Create stand alone C software for control of magnet movers. Work on Epics interface for magnet movers……