QC – User Interface QUALITY CENTER. QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning.

Slides:



Advertisements
Similar presentations
Mercury Quality Center 9.0 Training Material
Advertisements

ILD Quality Center Overview.
What is Test Director? Test Director is a test management tool
Defect Management Click screen to begin
CompassLearning Odyssey. What is Odyssey? CompassLearning Odyssey is a research-based curriculum. CompassLearning Odyssey is a research-based curriculum.
Quality Center Test Management Tool. Overview Test Lab Module Tasks Performed in Test Lab Module.
FireRMS Credentials. Credentials  Objectives Customize Credentials Credentials Earned Scheduling and Tracking for Credentials.
Decision Analysis Tools in Excel
Refresher Instruction Guide Strategic Planning and Assessment Module
Service Manager Service Desk Overview
HP Quality Center Overview.
IQSM Intelligent Quality Security Management Demonstration of features.
UT-CAD Manager. Define College and Fund Highlight Patterns The Define College and Fund Highlight Patterns task is used to assign a highlight pattern to.
McGraw-Hill/Irwin © The McGraw-Hill Companies, All Rights Reserved Creating Gantt Charts With Microsoft Project Technology Plug-In T12.
Access Lesson 2 Creating a Database
Mercury Quality Center Formerly Test Director. Topics Covered Testdirector Introduction Understanding the Testdirector Interface. Understanding Requirement.
Tesdirector Quality Center. Quality Center - Features Web based application with the following features Requirement management Test plan Test lab Defects.
I n t e g r i t y - S e r v i c e - E x c e l l e n c e Business & Enterprise Systems Introduction to Hewlett Packard (HP) Application Lifecycle Management.
Software Testing Prasad G.
Compliance Assist Refresher Instruction Guide Adding or Editing Unit/College Strategic Goals.
QC 9.2 Prepared By  Sriraman K. 2 Objectives Test Management Tool – What, Why, Benefits etc To make participants aware of Test Process and controlling.
MS Access Advanced Instructor: Vicki Weidler Assistant:
© 2004 Hewlett-Packard Development Company, L.P. The information contained herein is subject to change without notice Automation Fundamental Concepts &
Learn & Master - HP Quality Center Certification Exam Code HPO-M15
® IBM Software Group © 2009 IBM Corporation Rational Publishing Engine RQM Multi Level Report Tutorial David Rennie, IBM Rational Services A/NZ
Lecture 1 Saima Gul. What is a Project? A Project is a job that has a beginning and an end (time), a specified outcome ( scope) at a stated level of quality.
Creating a Web Site to Gather Data and Conduct Research.
Copyright © 2007, Oracle. All rights reserved. Managing Concurrent Requests.
Chapter 6 Generating Form Letters, Mailing Labels, and a Directory
Introduction to Quality Center
What’s New in SkillPort 7 Presenter Name Title. SkillPort 7 – a whole new look and feel! Complete redesign of the SkillPort User Interface –Both Student.
1 Quality Center 10.0 NOTE: Uninstall the current version of QC before downloading QC All QC 10.0 documents can be located on the BI Shared Services.
© 2008 The McGraw-Hill Companies, Inc. All rights reserved. ACCESS 2007 M I C R O S O F T ® THE PROFESSIONAL APPROACH S E R I E S Lesson 6 – Designing.
Fourth R Inc. 1 WELCOME TO MICROSOFT OFFICE PROJECT 2003 INTERMEDIATE COURSE.
Introduction to Test Director
Session Objectives • Login to PeopleSoft Test Framework(PTF)
MERCURY BUSINESS PROCESS TESTING. AGENDA  Objective  What is Business Process Testing  Business Components  Defining Requirements  Creation of Business.
Diagnostic Pathfinder for Instructors. Diagnostic Pathfinder Local File vs. Database Normal operations Expert operations Admin operations.
How to Run a Scenario In HP LoadRunner >>>>>>>>>>>>>>>>>>>>>>
With Microsoft Office 2007 Introductory© 2008 Pearson Prentice Hall1 PowerPoint Presentation to Accompany GO! with Microsoft ® Office 2007 Introductory.
HP Project & Portfolio Management Entering Actual Hours for Project work July 11, 2007 CIMpleBS.com/HP-PPM/Training-Time Sheets.pps By Dan Gallagher See.
1 / 61 Using the Customer Support Web Site © 2006, Universal Tax Systems, Inc. All Rights Reserved. Customer Support Site Objectives –In this chapter you.
Compliance Assist Refresher Instruction Guide Adding or Editing Student Learning Outcomes.
South Dakota Library Network MetaLib Management Basics Categories Administration South Dakota Library Network 1200 University, Unit 9672 Spearfish, SD.
0 eCPIC User Training: Portfolios Module These training materials are owned by the Federal Government. They can be used or modified only by FESCOM member.
LANDESK SOFTWARE CONFIDENTIAL Tips and Tricks with Filters Jenny Lardh.
Microsoft FrontPage 2003 Illustrated Complete Integrating a Database with a Web Site.
Setting Up TGO User Accounts. Creating User Accounts for Other Users If your company has other users who need to use the Active Orders system, your company’s.
Introduction to KE EMu Unit objectives: Introduction to Windows Use the keyboard and mouse Use the desktop Open, move and resize a.
Excel part 5 Working with Excel Tables, PivotTables, and PivotCharts.
Quick Test Professional 9.2. Testing Process Preparing to Record Recording Enhancing a Test Debugging Running the Test and Analyzing the Results Reporting.
Microsoft Project 2010 ® Tutorial 5: Tracking Progress and Closing the Project.
© 2007 IBM Corporation ® ClearQuest Application Lifecycle Management Training Use-Case Driven Development Practice Demo.
Active-HDL Server Farm Course 11. All materials updated on: September 30, 2004 Outline 1.Introduction 2.Advantages 3.Requirements 4.Installation 5.Architecture.
1 A Look at the Application Authorized users can access Communicator! NXT from any Internet-capable computer via the Web.
Learning SAS Dr. Chaitali Basu Mukherji. What is SAS? SAS software started out in 1970s as a software package for statistical analysis By mid-1980s SAS.
Plug-In T7: Problem Solving Using Access 2007
Software Testing With Testopia
Boeing 787 SCMP Training June 2016
Lesson Four: Building Custom Patient Lists
Unit4 Customer Portal Submitting & Managing Cases.
Unit4 Partner Portal for Case Creator
Quality Center (QC) 11 Training Global IT QA Testing Team 2013
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
HP ALM Defects Module To protect the confidential and proprietary information included in this material, it may not be disclosed or provided to any third.
APPLICATION LIFECYCLE MANAGEMENT(ALM) QUALITY CENTER(QC)
HP ALM Test Lab Module To protect the confidential and proprietary information included in this material, it may not be disclosed or provided to any third.
HP Quality Center 10.0 The Test Plan Module
Logging In Using CAT for the Participant Version 1.6
Presentation transcript:

QC – User Interface QUALITY CENTER

QC – Testing Process QC testing process includes four phases: Specifying Requirements Specifying Requirements Planning Tests Planning Tests Running Tests Running Tests Tracking Defects Tracking Defects Specifying Requirements: Identify and validate the functional and performance requirements that need to be tested. Planning Tests: Plan and confirm which tests need to be performed and how these tests must be run. Running Tests: Organize test sets, schedule their execution, perform test runs, and analyze the results of these runs. Tracking Defects: Add defects that were detected in the application and track how repairs are progressing QUALITY CENTER

QC – Testing Process QUALITY CENTER Business Components: The Business Process Testing module enables subject matter experts to drive the quality optimization process. Dashboard: This enables IT teams to track application readiness in real-time and manage project risk. QC also includes one of the following phases depending on the license:

QC – Specifying Requirements QUALITY CENTER Requirements describe what needs to be tested in an application. Requirements are defined in QC by creating requirements tree (graphical representation of requirements specification). Requirement Specification Module helps in  grouping and sorting requirements in tree  monitoring task allocation  monitoring progress in meeting requirements  generating detailed reports and graphs Major tasks under Requirement Specification Module are  Defining Requirements  Viewing Requirements  Modifying Requirements  Converting Requirements

QC – Specifying Requirements QUALITY CENTER Defining Requirements  Login to QC -> Requirements -> View -> Requirements Tree - > New Requirement  Child requirement can also be added for a particular requirement.  Unique Requirement ID (ReqID) is generated every time a requirement is added.

QC – Specifying Requirements QUALITY CENTER Viewing Requirements  Login to QC -> Requirements -> View -> Requirements Tree  Choose View -> Numeration, to assign hierarchical numbers to each requirement. Numeration is not related to ReqID assigned to each requirement.  Choose View -> Requirements Grid, to display requirements in non-hierarchical view.  Use Set Filter/Sort button to filter the requirements grid.

QC – Specifying Requirements QUALITY CENTER Modifying Requirements  Login to QC -> Requirements -> View -> Requirements Tree  Copy, Rename, Move and Delete operations can be done on existing/added requirements

QC – Specifying Requirements QUALITY CENTER Converting Requirements  Login to QC -> Requirements -> View -> Requirements Tree.  Select any existing requirement, then choose Requirements - > Convert to Tests -> Convert Selected Requirement.  3 Steps dialog box opens up and go through 3 steps to convert requirements into tests.  Use test plan tree to view tests.

QC – Planning Tests QUALITY CENTER Developing Test Plan Tree: After defining requirements, one needs to determine testing goals which done by building test plan tree and adding subjects. Designing Test Steps: For each subject in the test plan tree, define tests that contain steps. For each test step, specify actions to be performed and expected result. Calling Tests with Parameters: Increasing flexibility of test step by adding parameters. Creating and Viewing Requirements Coverage: Linking tests with requirements to ensure compliance throughout testing process. Generating automated test script with help of QTP and Winrunner.

QC – Planning Tests QUALITY CENTER Developing Test Plan Tree  Test Plan Tree enables tester to divide application into units or subjects according to functionality.  Test Plan Tree is graphical representation of test plan, displaying tests according to hierarchical relationship of their functionality.  Login to QC -> Test Plan -> Add subject folder to test plan tree.  Add test to subject folder, Create New Test dialog box opens. Select Test Type as MANUAL. (Select QUICKTEST_TEST to create QTP test or WR-AUTOMATED to create WinRunner Test). Add Test Name and click OK.  Required Fields dialog box opens. Select values for Level, Reviewed and Priority. Click OK.  Add Test Description in the Description box under Details tab.

QC – Planning Tests QUALITY CENTER Designing Test Steps  Test Steps are detailed, step-by-step instructions that specify how to execute a test.  Test Step includes actions to be performed and expected results.  Login to QC -> Test Plan -> Subject -> Test  Add test step by clicking on Design Steps tab, Click New Step. Design Step Editor box opens.  Define test step in Design Step Editor, add Step Name, Description and Expected Result. Click OK. (Add as many test steps as required for that subject).  Design Steps tab displays all design steps added for selected subject.

QC – Planning Tests QUALITY CENTER Calling Tests with Parameters  Template Test: Reusable test that can be called by other tests. Template test can include parameters  Parameter is a variable that replaces a fixed value.  Example, login test during start of an application.  Login to QC -> Test Plan -> Subject -> Test -> Design Steps. Click on Call to Test button. Select test that you want to call. Click OK.  Parameters of Test dialog box opens and displays the parameters contained in called test.

QC – Planning Tests QUALITY CENTER Creating and Viewing Requirements Coverage  Linking between tests and requirements is essential to ensure compliance throughout testing process.  In Test Plan module, one can create requirements coverage by selecting requirements to link to a test. Login to QC -> Test Plan -> Subject -> Test -> Req Coverage  In Requirements Module, one can create tests coverage by selecting tests to link to a requirement. Login to QC -> Requirements. Click on View -> Requirements Coverage. Select Test Coverage tab on right pane.  After creating test coverage, one can use Coverage Analysis view in Requirements module for analysis. Login to QC -> Requirements. Click on View -> Coverage Analysis.

QC – Planning Tests QUALITY CENTER Generating Automated Test Scripts  Automation scripts can be generated with the help of QTP or Winrunner.  Login to QC -> Test Plan -> Subject -> Test -> Design Steps. Click on Generate Script button.  Choose QUICKTEST_TEST to generate QTP test. You must have QTP add-in installed from Add-Ins page in order to have QUICKTEST_TEST option.  Choose WR-AUTOMATED to generate Winrunner test. You must have Winrunner add-in installed from Add-Ins page in order to have WR-AUTOMATED option.

QC – Running Tests QUALITY CENTER Test Lab module helps in creating test sets and choosing which tests to include in each set. Test set is a group to tests designed to achieve specific goals. Control execution of tests in test set by setting conditions and scheduling date & time for executing tests. Test can be run Manually as well as Automatically.

QC – Running Tests QUALITY CENTER Defining Test Sets  After designing test steps in Test Plan module, Create Test Set Tree under Test Lab.  Test Set Tree enables to organize testing process by grouping Test Sets in folders and organizing them in different hierarchical levels.  Login to QC -> Test Lab. Choose View -> Test Set Tree. Add New Folder and then add new test set.  Click Execution Grid tab on right. Click Select Tests, Test plan tree is displayed. Select tests to add to Test Set.

QC – Running Tests QUALITY CENTER Scheduling Test Runs  Login to QC -> Test Lab ->Test Set. Click Execution Flow tab on right pane.  Execution flow helps to specify date and time to execute a test and set conditions for it.  Dashed Line arrow indicates test with no conditions.  Solid Line arrow indicates test with condition. Blue Solid Line indicates condition set as ‘Finished’. Green Solid Line indicates condition set as ‘Passed’.  Time Dependency icon indicates time dependent tests.

QC – Running Tests QUALITY CENTER Scheduling Test Runs  Adding Execution Conditions.  Adding Time Dependency.  Execution Flow.

QC – Running Tests QUALITY CENTER Running Tests Manually  When running tests manually, follow test steps and perform operation on application. Then compare expected result with actual outcome and record the results.  Login to QC -> Test Lab ->Test Set -> Execution Grid. Click Run button. Manual Runner dialog box opens.  Click on Begin Run. Parameter Values dialog box opens if your step require parameters for execution. Give values to parameters and click OK.  Manual Runner Step Details dialog box opens. Display Manual Runner in Compact form and perform each step.  Record actual outcome and then Pass or Fail the test. Defect can also be logged at the time of test run.

QC – Defects QUALITY CENTER Defect is deviation from requirements. QC helps in tracking defects through following stages  New -> When defect is detected  Rejected -> When defect is not considered for repair  Open -> When defect is considered for repair  Fixed -> When defect is repaired  Reopened -> When retest of defect fails  Closed -> When retest of defect pass More stages can also be added using customization. Defects can also be linked to Tests. New Open Fixed Closed Reject Reopen

QC – Defects QUALITY CENTER Adding New Defect  Login to QC -> Defects. Click New Defect. New Defect dialog box opens.  Give details for Defect. Click Submit.  Unique Defect ID will be generated and defect will be added to Defect Grid.

QC – Defects QUALITY CENTER Matching Defects  Enables to eliminate duplicate or similar defects.  Keywords in fields Summary and Description are matched.  Login to QC -> Defects -> Defect Grid. Select any Defect and click on Find Similar Defects button. Similar Defects dialog box opens.  Similar Defects are sorted by the percentage of detected similarity.

QC – Defects QUALITY CENTER Updating Defects  Defects should be updated as and when action is done on that defect.  Login to QC -> Defects -> Defect Grid. Click on any Defect. Defect Details dialog box opens. Mailing Defects  Defects can be mailed to another user. This helps in updating others with defect repair activity.  Login to QC -> Defects -> Defect Grid. Click on Send by button. Send dialog box opens.

QC – Defects QUALITY CENTER Linking Defect to Tests  Defect can be linked to a test in Test Plan. Defects can also be linked to requirements.  Login to QC -> Test Plan -> Subject -> Test. Choose Linked Defects tab. Click on Link Existing Defect. Defect to Link dialog box opens. Favorite Views  Favorite view is view of QC window with settings user applied.  User might be interested to see defects raised by him/her and have status as ‘Open’ and ‘Fixed’. Then user can set Filter for this and can add it to favorites.

Thank You!!