Feedback from joining and first COD shift M.Radecki on behalf of CE ROC COD-7, Lyon, France.

Slides:



Advertisements
Similar presentations
The gLite Support System Giuseppe LA ROCCA INFN Catania
Advertisements

LCG WLCG Operations John Gordon, CCLRC GridPP18 Glasgow 21 March 2007.
Last update 01/06/ :23 LCG 1Maria Dimou- cern-it-gd Maria Dimou IT/GD Site Registration policy & procedures
Mardi 30 mars 2010 Lavoisier : a way to integrate heteregeneous monitoring systems. Cyril LOrphelin IN2P3/CNRS Computing Centre, Lyon, France.
Africa & Arabia ROC tutorial Model for L1-L2 user support based on x-GUS Mario Reale GARR - Italy ASREN-JUNET Grid School - 24 November 2011 Africa & Arabia.
Forschungszentrum Karlsruhe in der Helmholtz-Gemeinschaft Wofgang Thöne, Institute For Scientific Computing – EGEE-Meeting August 2004 Welcome to the User.
INFSO-RI Enabling Grids for E-sciencE SA1 Operations Manual P. Strange RAL, CCLRC UK.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROD model assessment ROC SEE By E. Atanassov,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Grid Infrastructure and Operations Maite.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks From ROCs to NGIs The pole1 and pole 2 people.
Opening the Portal – Walpole Public School District's Success USR06 Lynn Rowan, Software Support Specialist Walpole Public Schools.
EGEE-III INFSO-RI Enabling Grids for E-sciencE COD June 2009 COD-20 Hélène Cordier COD-20, CNRS-IN2P3, CSC.
1 Reportnet for Noise: Feedback from member countries Colin Nugent Eionet National Reference Centres for Noise meeting Copenhagen October 2009.
SEE-GRID-SCI SEE-GRID-SCI Operations Procedures and Tools Antun Balaz Institute of Physics Belgrade, Serbia The SEE-GRID-SCI.
Monitoring in EGEE EGEE/SEEGRID Summer School 2006, Budapest Judit Novak, CERN Piotr Nyczyk, CERN Valentin Vidic, CERN/RBI.
11/30/2007 Overview of operations at CC-IN2P3 Exploitation team Reported by Philippe Olivero.
INFSO-RI Enabling Grids for E-sciencE EGEE 1 st EU Review – 9 th to 11 th February 2005 CERN.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America Grid Monitoring Tools Alexandre Duarte CERN.
Certification and test activity IT ROC/CIC Deployment Team LCG WorkShop on Operations, CERN 2-4 Nov
Agenda Basic concepts and demo in service portal (search KB articles)
Enabling Grids for E-sciencE INFSO-RI Tools for CIC Operations, Bologna, 24th May Monitoring workflow in EGEE GOC DB is used to get the list.
8 th CIC on Duty meeting Krakow /2006 Enabling Grids for E-sciencE Feedback from SEE first COD shift Emanoil Atanassov Todor Gurov.
Grid Monitoring and Operations SAM Development Team CERN IT/GD Tier2 Admin Workshop 03 Dec. 2006, Mumbai.
EGEE-II INFSO-RI Enabling Grids for E-sciencE Real Life Examples Tickets – Real life examples Mário David LIP - Lisbon.
Taiwan COD Experience Joen Yi Jian, Shu-Ting Liao, Min Tsai ASGC EGEE 4 Conference: Oct 25, 2005.
Certification and test activity ROC/CIC Deployment Team EGEE-SA1 Conference, CNAF – Bologna 05 Oct
Operations Working Group Summary Ian Bird CERN IT-GD 4 November 2004.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CIC portal Requirements from users WLCG service.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Ops Portal New Requirements.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Deliverable DSA1.4 Jules Wolfrat ARM-9 –
Vendredi 19 février 2016 CIC portal development status and TODO list Gilles Mathieu, Osman Aidel, Cyril L’Orphelin IN2P3/CNRS Computing Centre, Lyon, France.
SAM Database and relation with GridView Piotr Nyczyk SAM Review CERN, 2007.
Mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS.
Operations model Maite Barroso, CERN On behalf of EGEE operations WLCG Service Workshop 11/02/2006.
INFN GRID Production Infrastructure Status and operation organization Cristina Vistoli Cnaf GDB Bologna, 11/10/2005.
INFSO-RI Enabling Grids for E-sciencE Operations Parallel Session Summary Markus Schulz CERN IT/GD Joint OSG and EGEE Operations.
John Gordon Grid Accounting Update John Gordon (for Dave Kant) CCLRC e-Science Centre, UK LCG Grid Deployment Board NIKHEF, October.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Pole 2 wrap up Vera, Helene, Malgorzata, David, Fotis, Diana.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI Operations Portal Development Update on Requirements Cyril L'Orphelin IN2P3/CNRS.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Best Practices and Use cases David Bouvet,
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operational Procedures (Contacts, procedures,
II EGEE conference Den Haag November, ROC-CIC status in Italy
SEE-GRID-SCI Grid Operations Procedures Antun Balaz Institute of Physics Belgrade Serbia The SEE-GRID-SCI initiative.
1/3/2006 Grid operations: structure and organization Cristina Vistoli INFN CNAF – Bologna - Italy.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks ROC model assessment AP ROC ShuTing Liao.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI GLUE 2: Deployment and Validation Stephen Burke egi.eu EGI OMB March 26 th.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks CYFRONET site report Marcin Radecki CYFRONET.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks COD-16 (Transition to EGEE-III) Report to.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks COD-17
CERN LCG1 to LCG2 Transition Markus Schulz LCG Workshop March 2004.
EGEE is a project funded by the European Union under contract IST ROC-IT User Support in the EGEE infrastructure Riccardo Brunetti INFN-Torino.
INFSO-RI Enabling Grids for E-sciencE GOCDB2 Matt Thorpe / Philippa Strange RAL, UK.
Enabling Grids for E-sciencE EGEE-II INFSO-RI ROC managers meeting at EGEE 2007 conference, Budapest, October 1, 2007 Admin Matters Vera Hanser.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI COD activity in EGI-InSPIRE Marcin Radecki CYFRONET, Poland & COD Team 9/29/2016.
EGEE-III INFSO-RI Enabling Grids for E-sciencE COD EGEE09 Barcelona Pole-2 Restructuring of Procedures Vera Hansper.
Nordic NE ROC Face 2 Face Meeting
Service Availability Monitoring
PPS All sites Meeting: - CODs and PPS - Monitoring Tools
PL-Grid – an example of NGI support structure Marcin Radecki
Grid Operations Procedures
Lavoisier : a way to integrate heteregeneous monitoring systems.
Cyril L’Orphelin (CC-IN2P3) COD-19, Bologna, March 30th 2009
ROD model assessment ROC FR
R-COD model readiness in FR
Pole 3 – Dashboard Assessment COD 20 - Helsinki
SAM Alarm Triggering and Masking
EGEE Operation Tools and Procedures
Site availability Dec. 19 th 2006
Presentation transcript:

Feedback from joining and first COD shift M.Radecki on behalf of CE ROC COD-7, Lyon, France

Agenda Tools Procedures Handling tickets (hard cases)

Tools Very helpful toolbox. –GSTAT,GGUS, Certificate lifetime monitor no problems –SFT results not updated during weekend –CIC-portal new portal is really powerful! Lavoisier Service –unavailable temporarily, –sometimes status displayed didn’t match with GSTAT –Own scrpits for checking : if a site is in TOP LEVEL BDII (BDII:2170) if GRIS on SE is working (SE:2135)

Procedures New COD team registration –CIC manager need to register as a COD member also Operations Manual (OM) – life can hardly be embraced by any procedure… –not working web references (8) –OM should reflect CIC portal functionality p.10 diagram says: –„Close ticket”  „Quarantine” – should be expressed in terms of „Site OK”  „Quarantine”, –„Solve ticket” – no such functionality in CIC-portal sec. 6.4: set „Quarantine” if a problem was „bigger”, but ROCs always set „Site ok.” –Site OK  Quarantine –Quarantine  Site OK. –sec. 7.2: Infinite downtimes „close ticket and contact the associated ROC” Do we really close the ticket? What’s the message for ROC? –Assigning priorities: Looks like not only #CPU is taken into account but also severity of the problem „CA rpms  high priority”

Handling tickets (hard cases) Ticket masking –if a ticket reports more critical problem it masks the others related to that site i.e. expiration date of the other tickets is set (extended) according to the expiration date the masking (more critical) ticket –Proposed masking hierarchy: 1.JL 2.JS 1.GFAL 1.RM (?) –Relation between tickets: A site has JL and GIIS down – which problem to submit? –Sumit the one only and (probably) the origin (in our case GIIS) Procedures to be written in OM: –Uncertified site: close all tickets. –Site with SD: set „Site OK” and extend tickets according to SD end date What if it comes back with the same errors? „1st mail?”

Questions How to/what’s the procedure to define a new ticket template in CIC portal?