Presentation is loading. Please wait.

Presentation is loading. Please wait.

Mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS.

Similar presentations


Presentation on theme: "Mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS."— Presentation transcript:

1 mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS Computing Centre, Lyon, France

2 Contents CIC Portal Usage : who/how Latest Release Portal Characteristics On-going developments

3 08/03/2016ARM Meeting, EGEE’07, Budapest3 How does it look like ? http://cic.gridops.org One section per actor Sub-menu per section News

4 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)4 Multi-views principle Integration Tools CIC Portal Communication tools REGIONAL CENTER SITE USER OPERATOR Monitoring tools VO info User Support Site info

5 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)5 Operational information e.g.: Information about available resources Services provided by Asia-Pacific Federation

6 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)6 Communication tools e.g.: Broadcast tool –Spread information to relevant contacts –Post news –Contact point between sites and VOs

7 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)7 Procedures e.g.: New VO registration –Central repository –Official registration and validation process –Used to build “VO ID cards”, updated by VO managers themselves

8 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)8 Use tools Each actor can use a set of operational tools (provided, integrated or interfaced) REGIONAL CENTER SITE USER OPERATOR VO MANAGER Tools (CIC Portal) Communicate Track, report, diagnose and follow-up problems Manage static information about my VO Report on site activity, submit tests, configure

9 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)9 Some numbers… More than 1000 identified users with special rights –120 VO managers –80 VO staff and experts –60 COD operators and operations managers –800 Site administrators and regional managers Around 120 registered VOs ~240 activity reports (one per site) generated daily 150~200 “broadcasts” sent per month

10 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)10 Connections Ever increasing number of connections COD dashboard is the most visited page 42 connections per day in Dec.2004 950 connections per day in Jun.2007 Currently 1000~1100 daily connections

11 Contents CIC Portal Usage : who/how Latest Release Portal Characteristics On-going developments

12 Technical changes Last technical changes –authentication is now based on full certificate DN instead of CN –Minor changes in general design Work on VO ID cards –changes in Database schema for VO/VOMS information –VO ID card interface improved –Integration of the YAIM VO Configurator to the CIC portal –Downloadable XML dump of VO ID card info

13 08/03/2016The 8th IEEE/ACM International Conference on Grid Computing (Grid 2007)13 YAIM VO configurator Integration complete since 22/08/2007 Backend –YAIM configurator DB integrated to CICDB –data coherency ensured about all officially registered VOs. –YAIM configurator code integrated to CIC portal code as an independent module –CVS synchronization

14 YAIM VO configurator (2) Front end –Update interface for VO manager integrated to VO Id card update form –Web interface hosted at IN2P3, and available as follows: As a page of the RC section in the portal: https://cic.gridops.org/index.php?section=rc&page=yaim https://cic.gridops.org/index.php?section=rc&page=yaim As a page of the VO section in the portal: https://cic.gridops.org/index.php?section=vo&page=yaim https://cic.gridops.org/index.php?section=vo&page=yaim As a standalone version: https://cic.gridops.org/yaimtool/yaimtool.py https://cic.gridops.org/yaimtool/yaimtool.py

15 YAIM VO configurator (3) main issue of having 2 entry points to update this info is solved Failover procedures are to establish –check python configuration on the replica instance of the portal at CNAF –test the application there –validate the process in the same way we did with SAM Admin's Page.

16 Contents CIC Portal Usage : who/how Latest Release Portal Characteristics On-going developments

17 Coming soon….Scheduled downtimes GOC Portal: Downtime Interface [Nick's template] SD description BDII Data Collector CIC db Downtime Listener Broadcast Email SenderRSS Sender Step 1 Step 2 Step 3 Step 4

18 One of the functionality of the interface

19 Progress status StepProgress 1 : Bdii -> CIC db100% 2 : Goc interface90% 3 : GOC -> CIC100% 4 : Broadcasting tool 80% The process will be ready in 2 weeks after the EGEE conference.

20 References References: CIC portal: a Collaborative and Scalable Integration Platform for High Availability Grid Operations Grid 2007 (IEEE), Austin Tx, United-States (September 2007) Geographical failover for the EGEE-WLCG Grid collaboration tools CHEP 2007, Victoria BC, Canada (September 2007)


Download ppt "Mardi 8 mars 2016 Status of new features in CIC Portal Latest Release of 22/08/07 Osman Aidel, Hélène Cordier, Cyril L’Orphelin, Gilles Mathieu IN2P3/CNRS."

Similar presentations


Ads by Google