Testing Process: Tools, Responsibilities, Connectathon Steve Moore Mallinckrodt Institute of Radiology.

Slides:



Advertisements
Similar presentations
June - September Part II: 2010 NA Connectathon Participants Part II: What 2010 NA Connectathon Participants need to know: Connectathon.
Advertisements

The Connectathon Process, Test Plan and Responsibilities of Participants Steve Moore Mallinckrodt Institute of Radiology Technical Project Manager: ITI,
IHE Canada Workshop – Sept What IHE Delivers 1 Kevin ODonnell Toshiba Medical Systems IHE Structure & Concepts.
DICOM Structured Reporting Workshop - March 2000 Structured Reporting and the IHE Year 2 Technical Framework Simon Wail, PhD Marconi Medical Systems.
Connectathon Week Game Plan Lynn Felhofer Sarah Willis-Garcia.
True IT Solutions For You 1 IT Solutions Software Development and Web Design.
1Lou Somers Software Engineering Projects 2IP35 Autumn 2014
June, 2006What IHE Delivers 1 Donald Van Syckle President, DVS Consulting, Inc. IHE Eye Care “Evidence Documents”
Introduction to Computer Administration System Administration
John Perry MIRC Overview Medical Imaging Resource Center MIRC Overview Medical Imaging Resource Center.
IHE & YOU—How Does it Work in the Clinic? Linda Wedemeyer, MD, MS--Ophthalmologist Veterans Health Administration Los Angeles, CA.
Eye Care Domain Connectathon 2014: Preparation & Processes Lynn Felhofer IHE Technical Project Manager.
Connectathon 2009 What Participants Need to Know: Administrative and Logistical Details IHE North America Webinars 2008 Chris Carr RSNA.
February 9th 2005IHE-EU Conference Workshop Connectathon Organization Eric Poiseau Version 1.0 (Integrating the Healthcare Enterprise) IHE in Europe.
Connectathon Preparation Steps Lynn Felhofer – IHE Technical Project Manager Sarah Willis-Garcia – IHE USA.
Connectathon Registration IHE Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)
Integration of DataGrid Software for Testbed 1 Goal: combine the DataGrid middleware and the Globus core services. Phases: Preparation for Integration.
Integrating the Healthcare Enterprise Presentation and short explanation of the developmental tools Eric Poiseau Laboratoire IDM Faculté de Médecine Université.
Afdasfdasfd Adfasdfasfd asd Connectathon Manager Responsibilities and Skill Set Connectathon Manager Training Steve Moore Mallinckrodt Institute of Radiology.
Federal Health Architecture How to Prepare for an HIE Connectathon Adeola Odunlami, Senior Solutions Architect Health and Civilian Solutions Division 1.
Afdasfdasfd Adfasdfasfd asd Software Inventory Connectathon Manager Training Steve Moore Mallinckrodt Institute of Radiology.
Internet testing prior to the Connectathon Welcome!! Please must your line as you enter. We will have Q&A at the end.
Annual Cycle Review for Returning Participants IHE Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)
2-3 Feb 2009Webinar for CAT Participants1 Connectathon Organization Eric Poiseau, IHE Europe Technical Project Manager INRIA Eric Poiseau, IHE Europe Technical.
Integrating the Healthcare Enterprise Presentation of some development tools of some development tools Eric Poiseau IHE Europe Technical Projet Manager.
Afdasfdasfd Adfasdfasfd asd Connectathon Timeline Connectathon Manager Training Steve Moore Mallinckrodt Institute of Radiology.
1 Integrating the Healthcare Enterprise Patient Demographics Query IHE IT Technical and Planning Committee June 15 th – July 15 th Public Comment.
Integrating the Healthcare Enterprise Applying Integration Profiles: Marketing and Product Development Glen Marshall Co-Chair, IHE IT Infrastructure Planning.
IHE’s Educational Webinar Series Thank you for attending 2010 Educational Webinar Series. Dates: Every Monday & Tuesday beginning June 8, 2010 through.
IHE NA Connectathon 2015 Registration Training Presented by Sarah Willis-Garcia Coordinator, IHE USA.
What Happens at IHE Connectathon…. December 3, 2014 IHE Connectathon Overview Session for IHE SDC Testing Partners.
IHE IT Infrastructure: The Value Proposition HIMSS 2003 Joining the IHE in its New Enterprise Initiatives.
February 8, 2005IHE Europe Educational Event 1 Integrating the Healthcare Enterprise Basic Security Robert Horn Agfa Healthcare.
June - September Part II: 2010 NA Connectathon Participants Part II: What 2010 NA Connectathon Participants need to know: Connectathon.
IHE-Europe – Use Case Based Approach to eHealth Interoperability Peter Künecke, SIEMENS Medical Solutions IHE-Europe „vendor“ co-chair Integrating the.
IHE International Meeting Gazelle Project Steve Moore, MIR Eric Poiseau, INRIA.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise Portable Data for Imaging - PDI Robert Horn Agfa Healthcare.
IHE at RSNA 2002 Goals of IHE Booth on Commercial Showfloor: 1.Attract the average radiologist 2.Convince him that IHE in radiology can make a difference.
June 2006What IHE Delivers 1 IHE Workshop Changing the Way Healthcare Connects Flora Lum, M.D. Director, Quality of Care and Knowledge Base Development.
Integrating the Healthcare Enterprise IHE Purpose and Progress Joyce Sensmeier MS, RN, BC, CPHIMS Director of Professional Services Healthcare Information.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise Patient Identifier Cross-referencing Charles PARISOT GE Healthcare.
Integrating the Healthcare Enterprise How to Purchase IHE Conformant Systems John Paganini Guardian Healthcare.
IHE Update DICOM Committee Taipei, April IHE Global Update IHE Technical Framework for Year 5 V5.5 issued for public comment in February Trial.
June 28-29, 2005IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Resources to Facilitate Implementation Kevin O’Donnell Toshiba.
February 9, 2005IHE Europe Participants' Workshop 1 Integrating the Healthcare Enterprise Nuclear Medicine Image - NM Dr. Jerry Wallis (SNM) IHE Radiology.
Requirements for the Testing Cycle IHE Test Cycle Lynn Felhofer / Steve Moore (MIR) Eric Poiseau (INRIA)
Integrating the Healthcare Enterprise IHE Plans for Multi-domain Testing and Demonstrations Steve Moore Technical Project Manager (ITI, Rad)
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Conformance: Connectathons, Integration Statements & RFPs Kevin.
Integrating the Healthcare Enterprise The IHE Process: Developing Standards-based Solutions Kevin O’Donnell Co-chair, IHE Radiology Planning Committee.
1 Radiology/RSNA 2003 Communications and Promotion Chris Carr Director of Informatics Radiological Society of North America.
CARS Special Session on IHE Integrating the Healthcare Enterprise – An Industry Perspective – Frequently Asked Questions Geert Claeys– AGFA (Co-Chairman.
GW ToDo A Task Manager CSCI 6442 Project Spring, 2016.
Key Image Notes Integration Profile Charles Parisot GE Medical Systems IT Planning and Technical Radiology Committees.
September, 2005What IHE Delivers 1 Purchasing & Integrating Radiology Systems Using IHE: A Tutorial & A Real-world Case Kevin O’Donnell, Cor Loef, John.
Summative Assessment Welcome We will wait a few minutes for participants to log on and call in. –Call in: –Pass code: *6 to.
Jonathan L. Elion MD, FACC Co-Chair, IHE Cardiology Planning Committee The Basics of IHE: Concepts and Process.
Connectathon 2009 Gazelle: HL7 V2 EVS, PIX Tests Agents, Automated Testing Project plans for Connectathon 2009 (February 23 rd -27 th 2009 ) November 14.
MIRC Overview Medical Imaging Resource Center. RSNA2006 MIRC Courses Overview of the RSNA MIRC Software Installing MIRC on Your Laptop Using MIRC for.
Portable Data for Imaging Testing and Demonstration Process WELCOME Chris Carr Radiological Society of North America Director of Informatics - Staff Liaison.
Sept 13-15, 2004IHE Interoperability Workshop 1 Integrating the Healthcare Enterprise IHE Plans for Multi-domain Testing and Demonstrations Steve.
IHE Eye Care “Evidence Documents”
PDI Demonstration – Technical Considerations
Steve Moore Mallinckrodt Institute of Radiology
IHE Eye Care Process and Timeline
Connectathon Logistics
IEEE Std 1074: Standard for Software Lifecycle
Introduction to System Administration
Introduction to System Administration
The IHE Process Users IHE Vendors Standards RFP IHE Integration
Joint Application Development (JAD)
Presentation transcript:

Testing Process: Tools, Responsibilities, Connectathon Steve Moore Mallinckrodt Institute of Radiology

HIMSS/RSNAVendor Workshop, April 2003 Technical Project Management HIMSS/RSNA contracts with the Mallinckrodt Institute of Radiology (MIR) MIR provides a point person for continuity and other team members for specific tasks – Software development – Hall monitors at the Connectathon

HIMSS/RSNAVendor Workshop, April 2003

HIMSS/RSNAVendor Workshop, April 2003 Participant Responsibilities MESA tests Documentation and other Connectathon

HIMSS/RSNAVendor Workshop, April 2003 MESA Tools Medical Enterprise Simulators and Analyzers A set of binary applications (C++) and perl scripts that lead each actor through test cases All source code, except TLS, provided Tools run on Windows NT, 2000, Solaris, Linux, other Unix

HIMSS/RSNAVendor Workshop, April 2003 Why Test With MESA Tools? These tools help your engineers prepare for the Connectathon This is a fairness issue for all participants This is a requirement of participation

HIMSS/RSNAVendor Workshop, April 2003 Software Support Private web server for participants with software and test data Separate “bugzilla” web system for tracking MESA bug reports We answer as quickly as possible

HIMSS/RSNAVendor Workshop, April 2003 MESA Changes for Y5 Table driven approach for SWF tests should make those scripts more stable SWF tests allow users to select new patient names and generate different identifiers New test cases for new Integration Profiles

HIMSS/RSNAVendor Workshop, April 2003 Participant Responsibilities (May-July) Application & Registration – Register with the RSNA for Year 5 Software registration form – Describes to MIR staff what you are testing Conference calls, week of 6/30 – Replace the July participant workshop DICOM Conformance Statements

HIMSS/RSNAVendor Workshop, April 2003 Participant Responsibilities (Aug-Sept) Power/space requirements (RSNA) Software/network configuration (MIR) MESA test results (MIR) Be prepared for Connectathon Ask the Project Manager if you are unsure about anything

HIMSS/RSNAVendor Workshop, April 2003 IHE Year 5 Connectathon RSNA arranges network, power and tables in their basement for testing Testing begins Oct 6, 12:00 Supervised testing ends Oct 10, 13:00 Informal testing can continue on Friday All equipment must be operational and staffed until closing time on Friday

HIMSS/RSNAVendor Workshop, April 2003 Connectathon Setup and Staffing Setup must be complete by 12:00 noon on Monday, 10/6 – Vendor responsibility to make early arrangements (Friday, Sunday) Equipment must be staffed and ready for testing for the entire day – Lunch breaks are scheduled – Other short breaks as needed

HIMSS/RSNAVendor Workshop, April 2003

HIMSS/RSNAVendor Workshop, April 2003 Connectathon Test Schedule IHE Europe has developed a web- based tool that allows participants to find test partners and log test results Test periods – Scheduled for multiple systems (SWF) – Open for point to point tests Some new connectathon tests to be added in Y5 based on Y4 experiences

HIMSS/RSNAVendor Workshop, April 2003 Testing Expectations The week goes quickly Prepared teams get the most out of the week Order Fillers are in high demand Participants need to be pro-active and contact test partners

HIMSS/RSNAVendor Workshop, April 2003 How Do I Succeed at the Connectathon? Each actor must test with a minimum of N (usually 3) peers for all defined tests MIR staff members will observe test results and use web system to post scoreboard You should know before you arrive how many tests you need to run and the composition of those tests

HIMSS/RSNAVendor Workshop, April 2003 Contact Information Dave Maffitt (V) (F)