Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP.

Slides:



Advertisements
Similar presentations
GEORGETOWN COUNTY STORMWATER DIVISION Breakfast Series #3 How to Prepare a Stormwater Pollution Prevention Plan January 14, 2009.
Advertisements

Quality Assurance/Quality Control Plan Evaluation February 16, 2005.
Managing a Successful Mechanical System project Following design – what next?
SUBMITTALS PROCESSING Fall 2008 ARCH 330
“TI” Ohhhh….. (TIO) (No TIO is not a person!) What is it all about?
ORGANIZATION. 2 Purchasing & Inventory Assessment Occurrence Management Information Management Process Improvement Customer Service Facilities & Safety.
1 FY 2004 Performance Management Plan Presentation Conduct Fire Prevention Services Team Members: J. P. McCabe, P.E. Fire Marshal, DFM, ORS Samuel A. Denny,
CTC-470 Construction Administration Project Management Concepts.
Replace Roof System Bldg 3600 Naval Air Station, Pensacola, FL W912DY-08-D-0020 TO 0012 Pre Construction Meeting Pre Construction Meeting.
19 th Annual Audit Division Conference October 7-8, 2010 Orlando, Florida Developing a Checklist Robert Orkin Project QA/QC Manager Parsons Brinckerhoff.
Project Closeout Issues A Review of Critical Tasks Required During the Closeout Process.
Project Close Out CTC-470.
Company LOGO C o n s t r u c t i o n R e p o r t P r o f e s s i o n a l C o n s t r u c t i o n M a n a g e m e n t 2006 Prepared by:
Conditions of the Contract for Construction
ISO 9000 Certification ISO 9001 and ISO
WHS Management Plans.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Readiness Stephen Sawch, Assistant Director for Construction Management Conventional Facilities.
Completions Safety, Speed, Efficiency, Real Time Statistics and Progress.
CVE 1000 Construction Engineering The Project Delivery System Prof. Ralph V. Locurcio, PE.
SPDES General Permit for Stormwater Discharges During Construction Activity GP Mike Jurkowski, CPESC, NYSDOT - Summary of Changes From GP
1 BROOKHAVEN SCIENCE ASSOCIATES As-Built Drawings and Commissioning Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional.
1 Resident Management System – Quality Control System Introduction Version 2.38 May 2010.
Christine Krall, SW Region Environmental Winter 2015.
Cindy L. Menches, Ph.D., P.E., The University of Texas at Austin Electri’ International Annual Meeting, July 2007 Characteristics+ Planning Achieving Performance.
Construction Management: At Risk. PROJECT MANAGEMENT STRUCTURE: Contractual Relationships Owner Architect/Engineer General Contractor Sub Construction.
Module 7: Construction Phase
Standards of Practice Course
Commissioning of Fire Protection and Life Safety Systems Presented by: Charles Kilfoil Bechtel National Waste Treatment Plant Richland WA.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 RMS Training Sponsored by the RMS Center July 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 RMS-QCS Introduction July RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
DSA 101 July 2010 Plan Approval Process for the Career Technical Education Facilities Program (CTE)
1 Resident Management System – Quality Control System Introduction Version 2.35 April 2005.
Redevelopment Grant Program Implementation Workshop Spring 2010.
1 RMS-QCS Introduction April RMS & QCS Resident Management System (RMS) P rogram used by Government QA Personnel to support Construction Quality.
High Performance Buildings 2007 Differences in Commissioning Scope ACG, ASHRAE Guideline 0, GSA and LEED Steven (Rusty) Ross PE, CxA, LEED AP SSRCx, LLC.
Building Commissioning: Cx 101 Brock Graham, Gilbane Building Co. Michael Gannon, BVH Integrated Services November 15, 2010.
1 RMS Training RMS BASICS May Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Scoping a Commissioning Job in Terms of Contractor Involvement ???
1 RMS Training RMS BASICS April Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
Agency Construction Management :CM NOT AT-RISK
Managing Construction Chapter 16. Contractor Projects are overseen by a contractor who owns and operates a construction company. Projects are overseen.
Conformance & Documentation Services Copyright © 2009 Sleighter Engineering, Inc.
Responsibility & Authority Module #2 Prepared by Dr. Randy R. Rapp July 2005.
Construction Eng 221 Project Management and Administration.
Specifying Commissioning Derek De Jesús, CxA Commissioning Manager Chinook Systems, Inc. Understanding the Commissioning Process October 14, 2008 ©2008.
1 CONTRACTING. 2 WHAT IS CONTRACTING ? CONTRACTING IS BASICALLY AN AGREEMENT BETWEEN TWO PARTIES, ONE CALLED THE CONTRACTING PARTY AND THE OTHER THE CONTRACTED.
Internal Auditing ISO 9001:2015
CVE 4070 Construction Engineering Project Closeout & Pyramid Solution
OTC Pres Project Del P5 12/08 Page 1 Project Delivery Performance Improvement Report to the Oregon Transportation Commission Jeff Gower, State Construction.
CVE 4070 Construction Engineering Course Review & Critique Prof. Ralph V. Locurcio, PE.
OSHA Safety and Health Program Management Guidelines
1 RMS Training RMS BASICS July Before you start RMS Six basic steps to success: 1.Establish offices (enter descriptions of offices) 2.Enter staff.
McDonough Bolyard Peck Educational Series Building Commissioning Presented by: Doug Wrenn Steve Baxter July
McDonough Bolyard Peck Educational Series HVAC Commissioning Presented by: Doug Wren Steve Baxter September 30, 2003.
An Overview Of The MBP CM Leadership Manual Presented by: Robert J. Carter, CCM Robert M. Pfeiffer, CCM.
Commissioning HVAC Systems: Lessons learned throughout
McDonough Bolyard Peck 1 CEFPI’s 81’st Annual International Conference PROJECT QUALITY MANAGEMENT by Edward M. Kopp and James Yatzeck.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
1 Introduction to MBProject. 2 Part I: MBProject and how it is used. Part II: What MBProject might do in the future. Also, as-built data collection and.
1 Punch list / Close Out - Project Completion Best Practices May 2016.
The Intricacies of the Beginning and the End of a Project CM Leadership Manual Presented by: Todd Scholtz, LEED AP Carlos Sanchez, LEED AP BD+C.
QUALITY ASSURANCE MODULE 3. Definitions Quality Assurance - A process/effort that ensures that processes are followed, that the processes of doing right.
Flooding Walkdown Guidance
Sponsored by the RMS Center
Designers’ Manual Overview and Chapter Contents
Designers’ Manual Appendix Contents
Quality Assurance for Emulsified Asphalt Surface Treatments
Presentation transcript:

Managing Quality with Quality Through the Construction Management Leadership Manual Presented by: Aleksandr Sergek, PE, PMP Allison Justiniano, LEED AP

CM Manual - Living Document A work in progress Supplement existing program or basis for program development To fill your site-specific needs 2

CM MANUAL – TABLE OF CONTENTS 8 Sections 1.Document Control 2.Mobilization and Start-up 3.Contract Administration 4.Quality Management 5. Safety 6. Schedule Management 7. Risk Management 8. Project Closeout & Turnover Glossary Appendix 3

Section 4 Quality Management 4.1 – Quality Assurance 4.2 – Quality Control 4.3 – As-Built Drawings 4.4 – Owner Inspections 4.5 – Regulatory Inspections 4

Section Quality Assurance Pre-Installation Meetings – Prior to each definable feature of work – The first stage of the USACE Three Phase Inspection System 5

6 Personnel Present Submittals Contract Drawings Material Storage Specifications Prep Work/Permits Testing Safety Construction Methods Tolerances Standards & Quality Schedule Section 4 Sample Preparatory Checklist

Quality Inspections Performed periodically to ensure construction is per contract documents 7 What are the last 2 Phases of USACE Three Phase Inspection System? Initial Inspection Final Inspection

Section Quality Assurance Daily Reports – Monitor deficiencies – Track Progress – Tests and Inspections – Record incidents (safety, visitors, etc) 8

Daily Report Project Date Weather/Temp Remarks GC Employees on Site Delinquent Items Materials Received Work Performed Issues Tests and Inspections Safety Comments Prepared By 9

Daily Report What’s wrong with the following statements: “I inspected the E and B Fire pump rooms in the basement” “At 0927 hrs, observed laborer in Area A2 without safety goggles.” “Observed wall E1021.a not installed slab to slab. Per drawing A1005 and A1132, wall E1021.a is a type D-4/S partition and is required to be slab to slab construction. Notified Bob Smith, QC Manager, of the deficiency. The QC Manager stated he will add to the deficiency report. Will verify in 48 hours to ensure this issue is captured.” 13

Section Quality Assurance Photos & Videos – Record progress and issues – Include with daily reports as necessary 14

July 2008 Dec 2008 June 2009 Mar 2009 May 2009 WRNMMC - Bldg A Sep

Webcam – BRAC 133, Alexandria, VA 16

Section Quality Assurance Deficiency Notices – Non-conforming work – Ongoing, unresolved deficiencies 17

18

Section Quality Assurance Commissioning Inspections – Varies by project – Independent commissioning agent contracted by: Contractor Owner CM – Periodic inspections / random sampling of test data 19

Section Quality Control 20 Inspection and Testing – Complete by contractor or third party inspector – Testing/Inspections verified by CM QC Plan – Submitted by the contractor – Outline of QC procedures

Section Quality Control QC Report – Submitted by the contractor and/or subcontractor 21 Testing Activities Preparatory Meetings Deficiencies Delays Costs

Contractor QC Report 22 Phase Preparatory Meetings Initial Meetings Follow-up Remarks & Sign- off

Section Quality Control Deficiency Log – Updated after each inspection or deficiency identified – Record deficiencies identified by CM or contractor – Reviewed at regularly scheduled progress meetings 23

24

Section As-Built Drawings Update on regular basis Reflect: –Change orders –RFI’s –Submittals –Clarifications –Field directives –Actual field conditions/installation –Bulletins –Amendments 25

Section Owner Inspections Responsibility of the CM to schedule and coordinate – Close-in Inspections – Punchlist – Pre-Beneficial Occupancy 26

Section Regulatory Inspections Contractor’s responsibility Examples: –Elevators –Escalators –Fire Alarm –Fire Suppression –OSHA –Building Inspections 27

MBP Quality Control Plan – For internal use – Implemented at the onset of the project – Updated periodically 28

MBP Quality Control Plan Purpose and Scope – Establish annual QC Plan – Period Covered Workload – Scope of Work of Narrative – Contract Organization – Organizational Chart Staffing – Flow Chart Quality Control Responsibilities / Duties – General Responsibilities – Specific Responsibilities – MBP Manual Checklist Reporting – MBP Daily Quality Control Report – Weekly Project Status Report 29 Lessons Learned – MBP Lessons Learned Database QC Plan Checklist Quality Team Signature Page

What can happen without QC… 30

Questions?