TP-2014-0547 WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,

Slides:



Advertisements
Similar presentations
TC SCP REQ STATUS REPORT TO PLENARY #63 Davide Pratone, Chairman, Telecom Italia SCP(14)
Advertisements

Call for test suites Group Name: REQ Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date: Agenda Item: TBD.
WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Methods Of Work Ad hoc Report TP#11 Source: Enrico Scarrone, Telecom Italia, Meeting Date:
WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #12 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
TST WG Progress Report at TP 18 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18,
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Progressing the Work on the MAS TR-0006, TR-0007 Group Name: Management Abstraction and Semantics Source: Tim Carey, ALU,
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Updated:
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
WG 3 Progress Report at TP13 Group Name: oneM2M TP13 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
OneM2M-REQ R03 Proposed simple guidelines for writing use cases and requirements Group Name: oneM2M WG1 / WG2 Source: Joerg Swetina (NEC), Ataru.
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP9 Source: Convenor WPM Joachim Koss, Gemalto M2M,
Group Name: oneM2M WG1 Requirements Source: Phil Hawkes, Rapporteur “Benefits of oneM2M technology” TR,
MoW&M&P Report Group Name: TP19 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
App-ID Discussion Group Name: ARC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 31 July 2014 Agenda Item: TBD.
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
Work Programme Management Ad hoc Group Report Group Name: one M2M TP12 Source: Convenor WPM Joachim Koss, Gemalto M2M,
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Ontology Architectural Support Options Group Name: MAS WG Source: Catalina Mladin, Lijun Dong, InterDigital Meeting Date: Agenda Item: TBD.
Access Control Status Report Group Name: ARC/SEC Source: Dragan Vujcic, Oberthur Technologies, Meeting Date: 09/12/2013 Agenda Item:
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
Access Control Status Report Group Name: ARC/SEC Source: Dragan Vujcic, Oberthur Technologies, Meeting Date: 09/12/2013 Agenda Item:
MoW&M&P Report Group Name: TP18 Source: MoW Convenor, Enrico Scarrone, Telecom Italia, Meeting Date:
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
REQ#2 ARC#2 Election Process Group Name: REQ WG, ARC WG Source: Victoria Gray, ETSI, Meeting Date:
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 18 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP18, Item.
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Call for input from WGs on things to test Group Name: TST Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
Authorization Architecture Discussion Group Name: SEC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 28 MAY, 2014 Agenda.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
Status of Active Work Items Summary Group Name: TP Source: Roland Hechwartner, WPM Convenor Updated: source: TP_WPM R08-New_Work_Item_Status_Report.
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Overview of oneM2M Home Appliances Information Model
Status of Active Work Items Level of Completeness
WG2 - ARC TP#29 Status Report
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
Status of Active New Work Items
Presentation transcript:

TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO, TTA Meeting Date: to , Busan, South Korea. Agenda Item: TP#13, Item 13, Reports from Working Groups

TP Issues for DECISION in TP © 2014 oneM2M Partners TP – CR to TS-0011 (Definitions TS) to rename the TS to “Common Terminology”, based on public review comments REQ R01 (Deutsche Telekom, Rapporteur)

TP Issues for DISCUSSION in TP © 2014 oneM2M Partners TP – none

TP Items for INFORMATION © 2014 oneM2M Partners TP – WG1 is currently updating Requirements TS-0002 to indicate fulfillment of requirements in Rel-1. Several contributions received at this meeting Overview in REQ R06, which also contains public review comments – was discussed extensively (and still requires further work) in REQ. – Consolidation started, received already feedback from MAS – Still needs help / feedback from ARC and SEC The document will be sent out to ARC and SEC to invite comments for a joint conf-call before TP#15 WG1 will prepare CR to TS-0002 for TP#15 Potentially a final joint session at TP#15

TP Highlights – WG1 had 4 regular sessions + 2 ad-hocs – 3 contributions for TR-0013 “Home Domain Enablement” Revisions expected – 2 contributions for TR-0001 “Use Cases” Industry automation use case from Hitachi – agreed UC on smart vehicle (Toyota et al.) – agreed – Since Phil Jacobs could not continue rapporteurship of TR-0001 (Use cases) Catalina Mladin (Interdigital) kindly offered to become rapporteur. © 2013 oneM2M Partners TP

TP Next Steps – TS-0002 Requirements WG1 continue to check Rel-1 coverage of requirements and work on received public comments. Joint WG1/2/4 confcall on Rel-1 coverage. – TR-0013 Home Domain Enablement Continue working on TR Expecting normative work to start at TP#15 – TR-0001 Use Cases Use case TR is getting big. Maybe consider splitting use cases TR into separate documents © 2014 oneM2M Partners TP

TP Next Meetings / Calls Conference Calls – REQ:1 conf-call between now and TP#15 – REQ, ARC, SEC:1 joint conf-call between now and TP#15 – dates TBD ! Face-to-Face – REQ#15.0: TP 15, Miami, Florida, USA January 2015 Plan for joint REQ, ARC, SEC session – WG1 work ramps up! © 2014 oneM2M Partners TP

TP