ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.

Slides:



Advertisements
Similar presentations
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
Advertisements

Data Acquisition Risanuri Hidayat.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
HCAL RBX PRR 2 March H C A L RBX Monitoring RBX Production Readiness Review Monitoring, Fieldbus and DCS John E. Elias HCAL Electronics Coordinator.
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status.
Mainz: Contributions to the LArg-Calorimeter Purity monitoring of the liquid argon and temperature measurement in the three cryostats - Old electronics.
CERN Ivan Romera MPE-Technical meeting Status on CERN-ITER collaboration for Machine Protection Acknowledgments: J.Burdalo, R.Schmidt, S.Wagner, M.Zaera.
DCS LEB Workshop ‘98, Rome, Detector Control System, H.J.Burckhart,1 Detector Control System H.J Burckhart, CERN u Motivation and Scope u Detector and.
ACES 2011 The third common ATLAS CMS Electronics Workshop for LHC upgrades March 9-11, 2011, CERN, Geneva, Switzerland Hardware:  ATMEL ATmega128 microcontroller.
SCADA and Telemetry Presented By:.
Cooling: CEDAR PMT & Electronics Tim Jones Liverpool Group.
3 June 2003U. Frankenfeld1 TPC Detector Control System Status.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
Smart transmitters.
5 March DCS Final Design Review: RPC detector The DCS system of the Atlas RPC detector V.Bocci, G.Chiodi, E. Petrolo, R.Vari, S.Veneziano INFN Roma.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
Towards a Detector Control System for the ATLAS Pixeldetector Susanne Kersten, University of Wuppertal Pixel2002, Carmel September 2002 Overview of the.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
ATLAS ATLAS DCS H.J.Burckhart, Muon Electronics Meeting, December 11th Status of Embedded Local Monitor Board (ELMB) Overview Radiation tolerance.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
Gunther Haller SiD LOI Meeting March 2, LOI Content: Electronics and DAQ Gunther Haller Research Engineering Group.
9th September 2001R. BARILLERE - IT-CO1 Industrial and Custom Front-End solutions for Process Controls.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
Development and Performance of the High Voltage Distribution System for the ALICE TRD A. Markouizos, P. Mantzaridis, P. Mitseas, A. Petridis, S. Potirakis,
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
18-20 December rd ATF2 Meeting, KEK ATF2 Power Supplies1 ATF2 High Availability DC Magnet Power Supplies By Paul Bellomo, Antonio de Lira, David.
André Augustinus 17 June 2002 Technology Overview What is out there to fulfil our requirements? (with thanks to Tarek)
André Augustinus 10 October 2005 ALICE Detector Control Status Report A. Augustinus, P. Chochula, G. De Cataldo, L. Jirdén, S. Popescu the DCS team, ALICE.
The Scheme of Slow Control System in BESIII Xie Xiaoxi Gao Cuishan
Power Distribution Existing Systems Power in the trackers Power in the calorimeters Need for changes.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATI PRR CERN 4 March the Embedded Local Monitor Board ELMB Design description of the Embedded Local Monitor.
17/6/2002Ivan Hruska,Francisca Calheiros,Bruno Allongue 1 TILECAL brick development Projected parameters design should fit the volume 160 x 40 x 50mm to.
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
60kW Thermosiphon control system
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
A.Henriques (JCOV meeting 31/5/2001) ATLAS Calorimeter cooling project Goal: u Definition of a common frame work for the cooling of the ATLAS calorimeter.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
ATLAS DCS ELMB PRR, March 4th 2002, H.J.Burckhart1 Embedded Local Monitor Board ELMB  Context  Aim  Requirements  Add-ons  Our aims of PRR.
1 Radiation worries in the cavern L.Jirdén
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
EtherCAT based RF Interlock System for SwissFEL LLRF 2015 Abstract As part of the overall development effort for SwissFEL's RF and LLRF systems, the RF.
AGROFARM WEATHER MONITOR USING LabVIEW. INTRODUCTION Innovation in agriculture field Implementing instrumentation tech. in agricultural field The quantity.
Progress in the Development of Evaporative Cooling Systems for the ATLAS Inner Silicon Tracker G. Hallewell 1 and V. Vacek 2 1 Centre de Physique des Particules.
R. Kluit Nikhef Amsterdam ET Nikhef Electronics Technology TGL Ruud Kluit 118-Apr-16.
Lecture Notes / PPT UNIT III
Martin van Beuzekom, Jan Buytaert, Lars Eklund Opto & Power Board (OPB) Summary of the functionality of the opto & power board.
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
UNICOS: UNified Industrial COntrol System CPC (Continuous Process Control) Basic course SESSION 3: PLC basics UCPC 6 UNICOS-Continuous Process Control.
ProtoDUNE SP – Slow control temperature readout setup test
SCADA for Remote Industrial Plant
ATLAS MDT HV – LV Detector Control System (DCS)
Ideas and design concepts, and challenges
Project guide B. SUBBULAKSHMI M. E Assistant Professor C. A. R
Cypress PSoC 3 vs. TI UCD90160 Power Supervision Applications
GlueX Electronics Review Jefferson Lab July 23-24, 2003
Radiation- and Magnet field- Tolerant Power Supply System
Presentation transcript:

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept u Measurements and Results u Future

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart2

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart3

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart4

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart5 Hierarchical levels of DCS Supervisor Level operator consoleshift operator, sub-system expert serverdata base, DAQ, External system Subsystem control level SCADA Local Ctrl StationGas, HV, endcap SCADA FE I/O Device Control FE I/O stand-alone systemalignment, gas analyser Fieldbus nodechamber, power supply PLCcooling, gas mixer Sensors, actuators

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart6 Requirements I/O system u Radiation (10 11 neutrons/cm 2 over 10 years outside of calorimeter) u analogue effects (e.g. loss of gain) u Single Event Upset (e.g. program corruption) u Magnetic field (1.5T in Muon, 0.1T electronics) u Access restriction u I/O points distributed over whole detector volume ( up to 100m distances) u Standardized connections to SCADA u HW: CAN, LAN u SW: CANopen, OPC, TCP/IP

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart7 CAN Fieldbus Reasons for selecting CAN: u robust u excellent error detection and recovery u open u cheap u good industry support (chips, products) u CERN recommendations

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart8 Applications of CAN Classes of applications: u Subdetector specific developments u TileCal (Clermont-Ferrand, Barcelona) u Muon (NIKHEF) u Industrial instrumentation with CAN interface u electronics crates u power supplies (HT, LT) u General purpose u modular system LMB u industrial modules

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart9 Local Monitor Box (LMB) Reasons for development of LMB: u radiation tolerance u operation in magnetic field u electrical characteristics (isolation, grounding) u high channel density u packaging u lowest possible power u high production volume (price) u common SCADA SW, only configuring needed

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart10 LMB Design Features u Radiation Tolerance u selected COTS u over-design performance, allow for degradation u operate components at lower values than specified u install at protected and accessible places u replace after n years u Operation in magnetic field u no coils, chokes, transformers, DC/DC u remote power u Limited access u remote diagnostics u remote loading of programs and reset

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart11 Concept of LMB u Modular system made out of building blocks u CAN node u I/O unit (e.g. ADC, bit I/O) u signal conditioning (e.g. range, excitation current) u add-on features (e.g. interlocks) u Different packaging (e.g. stand-alone, plug-on board, embedded on existing PCB) u Prototyping in ATLAS (in collaboration with sub- detectors), production in industry u Standard industrial interface (CAN/CANopen)

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart12 LMB block diagram

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart13 Block diagram CAN node

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart14 LMB Front-end PT100 board

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart15 LMB housing

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart16 LMB modules

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart17 Implementation of LMB u Prototype series produced ( modules) and given to all ATLAS sub-detectors ( + others) u Existing building blocks: u CAN controller module u front end I/O board u multiplexed ADC 16+7 bit, channels u digital I/O ( in preparation) u signal adaptation board u PT100 (4-wire connection) u PTx, NTC (2-wire connection) (LAr, BNL) u voltage, current adapters u interlock circuit (Pixel, Wuppertal)

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart18 Radiation tests in TCC2 Objectives: long-term stability of operation in a radiation environment behavior of components e.g. opto-couplers, EEPROM

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart19 Radiation test opto-couplers

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart20 Radiation measurement results u Opto-couplers critical u choose different type u increase circuit gain u Multiplexer problem at 50Gy u Current increase of micro-controller at 200 GY u 3 memory corruptions in SRAM (SEU) ==> more tests needed at well-known conditions (particle type, energy spectrum)

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart21 Pixel Cooling Prototype Hardware set-up: u 400 temperature sensors u 64 other ADC channels (flow, pressure, etc) u Feedback loops (ADC, DAC) u use LMB for ADC, industrial CAN modules for other functions

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart22 Pixel cooling measurement

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart23 Pixel cooling measurement

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart24 LAr Precision Temperature Measurement

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart25 LAr Precision Temperature measurement

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart26 LAr Precision Temperature measurement

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart27 Performance and features of LMB u Resolution 16 bit usable (0.8mK) u absolute accuracy 4*10 -5 (3mK) u long term stability 50ppm over one month u radiation tolerance looks achievable u weak components eliminated u more tests to be done u works in magnetic field (0.9T) u in-field programmable u CAN standard (device profile?) u low cost (2US$ per ADC channel)

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart28 Future LMB developments Additional I/O module types: u Digital I/O u DAC u Bus converters (e.g. JTAG, I 2 C) u Dedicated functions with custom programs in micro-controller

ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart29 Summary u CAN fieldbus is ATLAS’ standard to connect SCADA system to I/O system u LMB concept very suited for distributed DCS u Modularity u Necessary performance has been achieved u Projected price is “very reasonable” u LMB adopted as baseline by ATLAS’ subdetectors (also being tested by non-ATLAS groups, more users welcome)