ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 1 Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status.

Similar presentations


Presentation on theme: "ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 1 Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status."— Presentation transcript:

1 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 1 Hardware Status and Plans of the Embedded Local Monitor Board Hardware Status and Plans of the Embedded Local Monitor Board

2 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 2 Introduction  to monitor voltages, currents, temperatures,..  to control power supplies, cooling system,...  to read and write status bits  to check in-system programmable devices via serial control e.g. JTAG and I2C via serial control e.g. JTAG and I2C There is a need for a general-purpose Detector Front-End I/O Control System which can be embedded in the detectors.

3 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 3 Introduction to ELMB

4 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 4 Development of the ELMB is motivated by  Radiation Problems Total Ionising Dose TID CMOS MUX Non-Ionising Energy Loss NIEL Optocouplers Single Even Effects SEE Memory bit errors  Magnetic Field (1.5T to 0.1T)  Magnetic Field (1.5T to 0.1T) DC-DC converters  Access restriction - should work 24h and 365 days/year  I/O points distributed over the whole detector volume <100m  Standardised connections to the SCADA Hardware: CANbus / LAN Software: CANopen, OPC, TCP/IP

5 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 5 and furthermore...  Reduced design effort by individual institutes  Common Open Embedded Software templates, libraries  Spares and maintence during the detector lifetime (15 years)  Low power consumption cables, local power supplies  Commercial low cost in ATLAS several thousands will be needed  Common effort People from many subdetectors involved in HW and SW.

6 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 6 ELMB block diagram

7 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 7 ELMB block diagram Alternative to the ADC?

8 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 8 ELMB front side 50mm 66 mm DIP-SW ID BAUD ISP CAN CAN optos ADC optos

9 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 9 ELMB back side ADC 2*50 pin Bergstac connector ADC Analog MUX

10 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 10 ELMB specifications  )  General-purpose plug-on module (50 x 60 mm 2 )  CANbus interface (Full-CAN controller)  CANopen communication protocol  Powerful 8-bit RISC Microcontrollers  In System Programmable also via CAN bus second microcontroller with dedicated tasks  Optional 64 inputs of 16-bit ADC with 7 bit gain  General I/O with 18 I/O, 8 Out and 8 IN (or ADC), 3 wire SPI  Flexible power supply circuits incorporated (4 )  Est. cost is $2 / ch for ADC +CAN

11 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 11 Measurements of the ELMB Current Consumption

12 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 12 Measurements

13 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 13 2.5 to 4V operation of the 5V ELMB

14 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 14 Power ELMB  CAN controller ~20mA @ 5V (CAN specs)  Microcontrollers Digital I/O 5V 33mA 3.3V 15mA  ADC ~10mA @ 5V  OK for operation of the 5V ELMB with digital I/O in a 3.3V system with voltage doubler ADP3607

15 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 15 ELMB ADC

16 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 16 Crystal CS5523 Resolution 16 + 7 Bits CMR DC, 50Hz 120 dB Linearity ± 0.0015% FS Offset ± 2 LSB Stability 20 nV / º C Gain 1 ppm/ º C Delta-Sigma ADC 2 Hz to 100 Hz ±25 mV to ±5 V differential Not Accurate has to be calibrated!

17 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 17 ELMB ADC 1uV

18 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 18 ELMB ADC

19 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 19 High precision temperature principle After calibration ~3 mK precision at ATLAS LAr calorimeter

20 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 20 ELMB Motherboard for prototypes and tests

21 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 21 ELMB motherboard for tests in DIN rail housing

22 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 22 Motherboard  Signal adapaters for PT100, NTC and voltages  18 pin DIL sockets  Plug-in on back-side  One for every 4 inputs  Many type of sensors can be mixed

23 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 23 ELMB Radiation Tolerance Critiera ELMB Radiation Tolerance Critiera according to the ATLAS POLICY ON RADIATION TOLERANT ELECTRONICS ELMB: ----- * Will be used in MDT and in TGC. * Contains CMOS devices, bipolar devices, and optocouplers. * Foreseen radiation constraint in MDT barrel 1: 330 Gy - TID: 4.7 Gy x 3.5 x 5 x 4 = 330 Gy 33 krad in 10 years; - NIEL: 3.0E10 n/cm 2 x 5 x 1 x 4 = 6.0E11 n/cm 2 (1 MeV eq.) in 10years; - SEE: 5.4E9 h/cm 2 x 5 x 1 x 4 = 1.1E11 h/cm 2 (>20 MeV) in 10 years.

24 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 24 Quant ComponentTechn. TID (Gy) NIEL (n/cm 2 ) SEE Comments 1 ATMEGA103-6ACCMOS - - - NEW 1 AT90S2313-10SCCMOS~300 10 13 - If not programmed during irradiation 1 SAE81C91CMOS~300 10 13 - 1 PCA 82C250TBipolar~300 10 13 - 3 MIC5203-5.0BM4TSBipolar - - - NEW 1 MIC2754MBM5TSCMOS - - - NEW 1 ADP3607AR CMOS - - - NEW 2 HCPL-0601Opto - - - NEW 5 BAV70W diodeBipolar~300 10 13 - 4 BAT54W diodeBipolar - - - NEW 1 74HC1G66GWCMOS - - - NEW 1 CSTCC8.00MGQuartz - - - NEW 2 Quartz 32kHz SMDQuartz~300 10 13 - 1 CS5523-ASCMOS -- - NEW, better specs 16 MAX4582CEE CMOS -- - NEW, Analog Devices TID failed (75Gy) 1 AD680JRBipolar~300 10 13 - 1 MAX871EUK CMOS -- - NEW 1 NC74S14M5 PCMOS - - - NEW 1 74HC74ADT CMOS - - - NEW 4 NC7SZ00P5 CMOS - - - NEW 3 HCPL-0731Opto~300 >3 10 12 - Siemens NIELfailed at 3 10 11 n/cm 2 1 LMC6064 CMOSCMOS - - - NEW

25 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 25 Measurements on optocoulers

26 ATLAS ATLAS DCS B.Hallgren, CERN EP/ ATD ATLAS DCS Workshop 2-3 Oct 2000 26 Summary Status of H.W.  The printed circuit board of the ELMB has been tested and is ok! (Only fixation holes 1.6mm instead of 2.4mm)  20 pc is in production (15 Oct 2000)  Printed circuit board of the Motherboard is ready  20 prototypes will be available end of Oct 2000  Radiation tests are planned for February 2001  A first series of the ELMB will be produced to the Summer of 2001. Some components are on allocation!