THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.

Slides:



Advertisements
Similar presentations
6-April 06 by Nathan Chien. PCI System Block Diagram.
Advertisements

Chapter 2Test Specification Process. n Device Specification Sheet – Purpose n Design Specification – Determine functionality of design n Test List Generation.
Elements of a Microprocessor system Central processing unit. This performs the arithmetic and logical operations, such as add/subtract, multiply/divide,
Data Acquisition Concepts Data Translation, Inc. Basics of Data Acquisition.
A.R. Hertneky J.W. O’Brien J.T. Shin C.S. Wessels Laser Controller One (LC1)
EET Advanced Digital Chapter 8 Mass Storage.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 12/5/2003 Multi-channel Data Acquisition System Mid-Term Presentation.
DSP online algorithms for the ATLAS TileCal Read Out Drivers Cristobal Cuenca Almenar IFIC (University of Valencia-CSIC)
FF-1 9/30/2003 UTD Practical Priority Contention Resolution for Slotted Optical Burst Switching Networks Farid Farahmand The University of Texas at Dallas.
1 Project supervised by: Dr Michael Gandelsman Project performed by: Roman Paleria, Avi Yona 26/4/2004 Multi-channel Data Acquisition System Final_A Presentation.
1 Fast Communication for Multi – Core SOPC Technion – Israel Institute of Technology Department of Electrical Engineering High Speed Digital Systems Lab.
Kabuki 2800 “a real-time digital audio effects system for performance” team “Big Country” presents ECEN4610 Preliminary Design Review 14 September 2006.
Instrument TrainingIDPU - 1 UCB, Dec 6, 2006 THEMIS INSTRUMENT TRAINING IDPU.
MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
TRIO-CINEMA 1 UCB, 2/08/2010 STEIN Intro Davin Larson Space Sciences Laboratory University of California, Berkeley.
ISUAL Spectrophotometer Electronics C. Ingraham. 2NCKU UCB Tohoku CDR 9 July, 2001 Spectrophotometer Electronics C. Ingraham SP Electronics Functions.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
Timothy QuinnFIELDS iCDR – EGSE Solar Probe Plus FIELDS Instrument CDR Electrical GSE Timothy Quinn UCB 1.
COMPUTER ORGANIZATIONS CSNB123 NSMS2013 Ver.1Systems and Networking1.
Part A Presentation High Speed Digital Signal Lab Students: Lotem Sharon Yuval Sela Instructor : Ina Rivkin.
DLS Digital Controller Tony Dobbing Head of Power Supplies Group.
GBT Interface Card for a Linux Computer Carson Teale 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes Sept. 2008EFW INST+SOC PDR253 Data Controller Board FPGA Dorothy Gordon UC Berkeley.
TIM Phase A 1 SSL, 8/15/2007 Electric Field and Waves Instrument (EFW) Technical Interchange Meeting EFW Digital Electronics Digital Control Board (DCB)
J. Christiansen, CERN - EP/MIC
Somervill RSC 1 125/MAPLD'05 Reconfigurable Processing Module (RPM) Kevin Somervill 1 Dr. Robert Hodson 1
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
A Front End and Readout System for PET Overview: –Requirements –Block Diagram –Details William W. Moses Lawrence Berkeley National Laboratory Department.
Lecture 16: Reconfigurable Computing Applications November 3, 2004 ECE 697F Reconfigurable Computing Lecture 16 Reconfigurable Computing Applications.
THEMIS Instrument CDR 1 UCB, April 19-20, 2004 Boom Electronics Board (BEB) Engineering Peer Review Apr. 20, 2004 Hilary Richard.
Management of the LHCb DAQ Network Guoming Liu * †, Niko Neufeld * * CERN, Switzerland † University of Ferrara, Italy.
TRIO-CINEMA 1 UCB, 2/08/2010 Cinema Stein Interface FPGA (CSI) [Part II] Karthik Lakshmanan CINEMA - EE Team Space Sciences Laboratory University of California,
THEMIS/SRR ESA- 1 UCB, 06/08/2003 THEMIS Electrostatic Analyzer (ESA) instrument David W. Curtis Space Sciences Laboratory University of California, Berkeley.
THEMIS SRR 1 UCB, June 8-9, 2003 Solid State Telescope Davin Larson SSL.
ATtiny23131 A SEMINAR ON AVR MICROCONTROLLER ATtiny2313.
Lecture 12: Reconfigurable Systems II October 20, 2004 ECE 697F Reconfigurable Computing Lecture 12 Reconfigurable Systems II: Exploring Programmable Systems.
THEMIS IDPU FSW 11/29/ UCB THEMIS IDPU FSW V4 Mission Profile Tests Peter Harvey Michael Ludlam.
SDR 7 Jun Associated Electronics Package (AEP) Curtis Ingraham.
THEMIS Instrument PDRGSE- 1 UCB, October 15-16, 2003 IDPU Ground Support Equipment Preliminary Design Review F. Harvey University of California - Berkeley.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Flight Software Summary Peter Harvey Space Sciences.
TRIO-CINEMA FSW- 1 SSL, 8/10/2010 Flight Software Seyoung Yoon and Sameet Ramakrishnan Space Sciences Laboratory Kyung Hee University University of California,
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
P. Mokashi IES Team Meeting, SwRI 29 May IES (SwRI) Develop sequences (flight and EQM test) Develop tables, macros and patches if necessary Test.
GoetzPre-PDR Peer Review October 2013 FIELDS Time Domain Sampler Peer Review Keith Goetz University of Minnesota 1.
SST- Solid State Telescope ESA - Electrostatic Analyzer Science Measurement and Operational Requirements.
13-1 MAVEN PFP ICDR, May 23 – 25, 2011 Particles and Fields Package Critical Design Review May , 2011 GSE Timothy Quinn.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB Flight Software Design Peter Harvey University of California 1.
THEMIS Instrument PDR 1 UCB, October 15-16, 2003 ESA & SST (ETC) Interface Board Preliminary Design Review Robert Abiad University of California - Berkeley.
THEMIS Instrument CDR 1 UCB, April 20, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley.
Timothy Edward Quinn FIELDS iPDR – GSE Solar Probe Plus FIELDS Instrument PDR GSE Timothy Edward Quinn UCB 1.
PROGRAMMABLE LOGIC CONTROLLER
TRIO-CINEMA C&DH- 1 KHU, 10/19/2009 Command & Data Handling System (C&DH) Peter Harvey David Curtis David McGrogan Space Sciences Laboratory University.
TRIO-CINEMA 1 UCB, 2/08/2010 ACS Dave Auslander, Dave Pankow, Han Chen, Yao-Ting Mao, UC Berkeley Space Sciences Laboratory University of California, Berkeley.
NCKU_UCB_TohokuISUAL-IFR : DCM (version 2.0) July 9, 2001Tong-Long Fu 1 Data Compression Module ( DCM ) Tong-Long Fu Laboratory of RF-MW Photonics, Department.
8th Cross-calibration Workshop CIS data delivery report Kinsale – October 2008.
Status of CIS Calibration Work Iannis Dandouras and the CIS Team presented by: Harri Laakso 3 rd CAA Cross-Calibration Meeting MSSL, October 2006.
THEMIS Instrument CDR 1 UCB, April 20, 2004 Actel Reliability Critical Design Review Robert Abiad University of California - Berkeley.
Solar Probe Plus – FIELDS Main Electronics Package
Particles and Fields Package (PFP) SWEA Pre-CDR Peer Review
FGM CDR FGM Electronics (FGE) Ronald Kroth MAGSON GmbH Berlin Germany.
University of California - Berkeley
PAD SELECTION QUALITY FLAG STATUS
INSTRUMENT DATA PROCESSING UNIT (IDPU) REQUIREMENTS
ISUAL Associated Electronics Package
ACS UC Berkeley Space Sciences Laboratory
GPM Spacecraft Ethernet Study
Upgrading the Digital Component of the Bunch Current Monitors
Arduino म्हणजे काय?.
Chapter 13: I/O Systems.
Presentation transcript:

THEMIS CDR 1 UCB, June 16, 2004 ESA & SST (ETC) Interface Board Critical Design Review Robert Abiad University of California - Berkeley

THEMIS CDR 2 UCB, June 16, 2004 Overview Overview of ETC Interface with particle instruments Processing of particle data Passing data back to DCB (main processor)

THEMIS CDR 3 UCB, June 16, 2004 Connections Instrument and DCB interfaces ESA commanding –ETC acts as translator –ESA & SST data collected –ETC collects data and processes it ESA & SST spin sectoring Other signals –SST commanding from the DCB –ESA & SST analog housekeeping wires to the DCB –SST clock from the DCB

THEMIS CDR 4 UCB, June 16, 2004 Connections DCB ETC SST ESA 8MHz EANA_HSK SANA_HSK ECMD_GATE ECMD_DATA ECMD_CLK ETLM_DATA ETLM_CLK STLM_REQ STLM_DAT TLM_DATA ETC_CMD SST_CMD SPINCLK SPIN/32 Shared board POR_L SPINPULSE RESET

THEMIS CDR 5 UCB, June 16, 2004 Requirements Data production Slow Survey - 13 moments/data type (2 species x 2 instruments) Slow Survey - Reduced angle distribution/data type/Nspins Fast Survey - Full angle distribution/data type/Nspins Burst - Full angle distribution/data type/spin

THEMIS CDR 6 UCB, June 16, 2004 Requirements Moments There are 13 moments calculated for 4 different data types Moments are calculated using an entire spin of data  represents the 32 spin angles  represents elevation angle - 4 for SST and 16 for ESA E represents particle energy -16 for SST and 32 for ESA

THEMIS CDR 7 UCB, June 16, 2004 Requirements Moments (cont.) C is the count of particles at a particular field of view. This data comes from the instruments.  is the solid angle. This value is programmed into a lookup table by the processor. WP is a combined weighting and spacecraft potential correction. This value is calculated in the ETC using lookup tables and the equation: Where V is the spacecraft potential and N=0-3

THEMIS CDR 8 UCB, June 16, 2004 Distributions Purpose –Measure full particle angular distributions with equal solid angle resolution. Polar angle measurements are combined to produce equal solid angle bins and to reduce data volume. Full Distributions –ESA sees 512 fields of view in a spin (32 spin phase x 16 elevation angles). This gets reduced to 88 angle bins. –SST sees 128 fields of view in a spin (32 spin phase x 4 elevation angles). This gets reduced to 64 angle bins. –Solar wind mode gives higher angular resolution Reduced Distributions –For survey data covering more of an orbit due to low bandwidth –ESA and SST data reduced to 8 angle bins. –Electron pitch angle distributions Requirements

THEMIS CDR 9 UCB, June 16, 2004 Distributions (cont.) Burst Distributions –Burst are identical to full distributions in angular and energy makeup, but recorded every spin. All data will be converted from X bits to Y bits using a pseudo square-root compression scheme Use lookup tables to do angle translations Requirements  

THEMIS CDR 10 UCB, June 16, 2004 Status FPGA design completed Individual modules simulated System simulations ongoing Debugging in GSE hardware Timing requirements met in Actel Board testing underway Post-Combiner device utilization: SEQUENTIAL Used: 1743 Total: 2012 (86.63%) COMB Used: 3138 Total: 4024 (77.98%) LOGIC Used: 4881 Total: 6036 (80.86%) (seq+comb) IO w/ Clocks Used: 50 Total: 167 CLOCK Used: 2 Total: 2 QCLK Used: 0 Total: 4 HCLOCK Used: 1 Total: 1

THEMIS CDR 11 UCB, June 16, 2004 Electrical Diagram

THEMIS CDR 12 UCB, June 16, 2004 Processor Requirements Table Loading 30 tables totaling 51 KBytes –4  - computed on board –12 distribution angle lookup tables - loaded from ground –4 exponential lookup tables - in EEPROM –6 energy lookup tables - loaded from ground Commanding 1 spacecraft potential command/spin Less frequent setup commands –Number of spins to collect data –Number of angles data is being binned into Maintaining collected data 13 DMA channels to mass memory Inserting headers into data

THEMIS CDR 13 UCB, June 16, 2004 Power Power estimation Actel 305mW + 2 SRAM (25mW/MHz) 50mW + Transceivers 20mW = 375mW

THEMIS CDR 14 UCB, June 16, 2004 Simulation GSE Design loaded into an Altera part along with a microprocessor allows quick runs with a minimal of support Debugging of design DCB/ETC Need GSE to produce data (ready) Need software to run the DCB Debugging of board and system Testing Plan

THEMIS CDR 15 UCB, June 16, 2004 Issues Difficulty in recognizing data errors Availability of instruments Actel reliability