Blade Fold & Prepare for shipment by C5 Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail.

Slides:



Advertisements
Similar presentations
Why are things coloured ?. Beam of white light hits Homers head Yellow light reflects in all directions Blue light reflects in all directions Beam of.
Advertisements

Tagger and Vacuum Chamber Assembly Procedure. Outline. Assembly procedure for tagger and vacuum chamber. Support stands. Alignment.
DS1000B-RM/ DS1500B-RM Battery Replacement Procedure.

Electricity Lesson II Electrical Symbols EE.
MINE CLEARING BLADE (MCB) DEADLINING COMPONENTS
Servicing Welch DRYFAST ULTRA Pump Models 2032
Optical Manufacturing Solutions 1 Probe Assembly.
Honda 450 Installation Manual.
A-dec 300 Dual Mount on 500 Installation. Agenda ► General Information ► Recommended tools ► Installation ► Follow through install guide ► Hands-on install.
RL brake caliper Installation instructions Included parts: Solid billet aluminum caliper brackets (qty 2) 9/16 grade 8 bolts (qty 2) 9/16 grade 8 washers.
1 STEPMILL 7000 PT ASSEMBLY INSTRUCTIONS PART NUMBER
ES1000C/1500C Battery Replacement Procedure. 1.Pull off the front panel.
Model 12 Intek Horizontal OHV
What is a fastener? A device to locate or hold parts.
ASSEMBLY INSTRUCTIONS. 2 ASSEMBLY INSTRUCTIONS TOOLS REQUIRED: SIDE CUTTING PLIERS PRY BAR 7/16” & 9/16” WRENCH 3/16” ALLEN WRENCH T-15 TORQUE.
1 Light 1 C 70” Project Layout AFF. AFF is the abbreviation for 2 1.After first fire 2.Above finished floor 3.Above flat floor 4.At first floor 5.Average.
Approved Training Manual’s Lesson Plans And Courseware STAR MARIANAS AIR, INC. Initial New Hire – Flight Crew Part III – Aircraft Ground Training Section.
Service Seminar Memory Craft Table of Contents MC10001 Top Cover Removal…………………………………………………………………..…………1 Belt Cover Removal……………………………………………………………..……………2-4.
Institute of Marine and Coastal Sciences Glider Packing Instructions: Page 1 Step 1: Make sure the red stop plug is plugged into the glider and the green.
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
After Receiving this error code, Follow these steps to correct the problem… Click for next slide.
+ USING THE POWER CHARGER AND BATTERY MINI-DV CAMCORDER Connect the charger to the power cord Attach the battery to the charger Plug it in and watch for.
© 2011 Pearson Education, Inc. All Rights Reserved Automotive Technology, Fifth Edition James Halderman IN-VEHICLE ENGINE SERVICE 27.
McPherson Strut Service and Diagnosis
Jacto Incorporated, 9650 SW Herman Road, Tualatin, Oregon (800)
WSPS Cutter WSPS Deflector Flash Suppressor Gun Barrel Recoil Dampener Chamber Access Door Gun Drive Motor Flex Chute Gun Cradle Utility Hydraulic Line.
BIS Internship Summary Powerpoint Created by BIS Student Cylor Morgan (used with permission)
This presentation will cover your LCD screen with several solid colors, one at a time. This makes it fairly easy to see stuck (always on or off) pixels.
1 FREE CLIMBER 4400 ASSEMBLY INSTRUCTIONS PART NUMBER
Lesson 14: Weight And Balance. Importance Of Weight And Balance Forward CG Increases tail down force which increases effective weight (real weight + tail.
Jeff Guzzetti Lubrication and End Play Inspection Lubrication and End Play Inspection.
Ice Storm School Year Your missions and tasks for the RCX robotics tournament.
Idea Development TTTTo have a Better Understanding of How Mechanically a Helicopter Flies IIIIntrigue of part design AAAA chance to better.
Moment Connection Requires Bolts Outside the Flanges
Using Stress Analyzer for Tensile Testing © 2012 Project Lead The Way, Inc.Principles Of Engineering.
PS500B/800B Battery Replacement Procedure. 1.Remove the two screws at the bottom of the front panel. 2.Push down then remove the front panel.
PS1500B Battery Replacement Procedure. 1.Pull off the front panel.
RICH1 Gas Enclosure Installation. Experimental Area Meeting at CERN on 21st June 2006 Bill Cameron (Imperial College London) on behalf of the RICH1 team.
Model 12 Intek Horizontal OHV
The BaBar Upgrade Load transfer of the Barrel and Endcap Calorimeters Richard F Boyce 21 October 2003.
PS2200B/3000B Battery Replacement Procedure. 1.Disconnect the wire connecting the UPS and the battery pack. 2.Pull off the battery pack front panel.
Easy Reach 7.0 Honda Element Packing List QtyDescriptionPacked 115ft 10ga Red Wire 16ft 10ga Black Wire 140amp Breaker 23/8 Yellow Ring Terminals 25/16.
Initial Pilot Ground School
UH-60 Load Out on C-5 Aircraft
© 2009 Aviation Supplies & Academics, Inc. All Rights Reserved. Principles of Helicopter Flight Chapter 20 Helicopter Design and Components.
Sébastien MICHALMarch Sébastien MICHALMarch 2009 EES 1 GROOVE EES 1 laid on table to be milled EES 1 laid on table to be milled –Move horizontally.
New Support Structure 4x4 Beams Existing Stairs per Mr Walter Kellner Cherenkov 32 deg shifted back 4.0 inches to clear existing structure Cherenkov 40.
Courtesy Eric Witherspoon, Sonex plans #815 Photo 1: What it is. Photo 2: How it works. Sonex Wing Stand Answer to photos 3 and 4: Want leading.
Genuine N1. Conversion Installation manual LC 120 5D 2003
Produced By James Benson
Instructions for Diaphragm Replacement Cat. Nos. 2052B-01, 2054B-01
Electricity Symbols.
Small Engine Disassembly
Bilge Pump Service Project Model Service Kit
IN-VEHICLE ENGINE SERVICE
DESCRIPTION AND GUIDE TO OPERATIONS
Easy Reach 7.0 Honda Element 2003
Easy Reach 7.0 Honda Element 2003
DRILL September 17, 2007 Write answers in complete sentences:
How to Install a Garage Door.
Disassembly and Assembly of A07A-W1/W2 Electronic Governor Actuator for AD Fuel Injection Pump
Using Stress Analyzer for Tensile Testing
Electrical Wiring Single Pole Switches.
M400, M400N, M400Z 21/2”-10”.
Step 1:Disassemble battery case
Oregon Robotics Tournament and Outreach Program
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Step 1:Disassemble battery case
Presentation transcript:

Blade Fold & Prepare for shipment by C5

Blade Fold Prep for shipment. –Blade fold Tail rotor Main rotor –Struts Main Tail

Prep for shipment.(con’t) –Stabilator –Step fairings Install tow plates

M/R Fold Alignment of Swashplate –Line up yellow index –Inbd T/R horizontal (If The swashplate is not lined up you will not be able to put in the support pole )

Take all commands from the guy on the head

M/R Fold Fwd left (red) Fwd right (black) Aft left (blue) yellowAft right (yellow)

Take all commands from the guy on the head

T/R Fold Remove 12 OTBD RET plate bolts Remove balance washers –Install both on star plate and hang as they came off Disconnect P/C rods at pitch beam& deice Rotate Pad

Struts Connect HYD cart before opening kneeling valve!

Struts Main –Hyd cart. –Lower stage only. –Record exposed strut. (eliminates servicing) –Raise cargo floor to 30 inches.

Struts Connect HYD cart before opening kneeling valve!

Struts Tail –Remove tail access panel. –Record exposed strut. –Lower until no silver showing. –If tail loaded first upper stage may need to be lowered requiring complete servicing.

Struts Connect HYD cart before opening kneeling valve!

Tow plates Remove step fairing Install & torque bolts on tow plate 1 left & 1 right Rotate WSPS

STAB Remove tail cone!!!!! Remove STAB and rack it

Antenna Remove FM whip Stow lower anti-collision light

FOD CONTROL BAG ALL PARTS Attach bag to ACFT or in fold box –Step fairing screws and stab bolts end up missing –T/R star plates attach and label to acft –Tools