Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal 2013 2013 1.

Slides:



Advertisements
Similar presentations
City of Tybee Island 2007 Master Plan Summary Report Area Character Maps and Area Development Recommendations.
Advertisements

Washington Street Redesign Andrew Brunn, Kamila Misiak, Sarah Thomas The Long Term Solution.
Tacoma Link Expansion Infrastructure, Planning and Sustainability Committee Tacoma City Council--Nov. 13, 2013.
Human Powered Delray All Streets should be complete streets February 5, 2015 FDOT Transportation Visioning.
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
Examples of Context Sensitive Solutions in an Urban Environment ITD Project Development Conference April 7, 2005 Doug Camenisch, P.E. Parametrix.
Virginia Street Corridor Plan. From our Tier One University, world renowned recreation and our Midtown entertainment area to abundant cutting edge business.
Contact: Beth Morris
Slide 1. Slide 2 Introduction How did you get to school as a child?
MNDot Proposes I35E/Cayuga Road Project  Establishes visual quality advisory committee  Meetings commenced February 2011 and continued until fall of.
Tysons 1 Operational Analysis of Dulles Toll Road Ramps to Tysons Board Transportation Committee Meeting September 17, 2013 Seyed Nabavi Fairfax County.
Plan Purpose:  To provide pedestrian environments that are safe, attractive, and accessible to community institutions, employment and retail services.
VISION FOR A KEARNY TOD February 27, 2008 Rob Lane Regional Plan Association.
Efficiency through technology and collaboration Road Diet (Roadway Reconfiguration) Every Day Counts 3 Innovative Safety Initiative.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Austin Strategic Mobility Plan Apr 19, 2010 Program Overview.
Virginia Street Bus RAPID Transit Extension Presentation to RTC July 17, 2015 Project Purpose Extend RAPID to UNR Improve pedestrian safety & access Create.
Schools Jobs Revenues Services Recreation Environment Transportation Transportation Connectivity Housing Public Safety Pontiac’s.
August 2004 Hickory by Choice Linking Land Use and Air Quality Planning.
Northeast Ohio Areawide Coordinating Agency Kamm’s Corners Development Corporation.
Multimodal Corridor Plan BCC Discussion Item Transportation Planning Division August 19, 2014.
What is Sustainable Transportation? CEE 8207 Project Presentation 9 July 2015 Mark Guida, Drew Britten, Marcus Snyder, and Nick Monsu.
The Health Impact Assessment (HIA): Promising Best Practices in Transportation Eloisa Raynault | | Transportation, Health and.
County of Fairfax, Virginia Department of Transportation Richmond Highway Transit Center Feasibility Study Briefing with the Fairfax County Transportation.
Land Use Study for the Community of Winchester July 9, 2012.
Effective Transportation Planning City of Seattle, WA.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
1 Item 12: Report on Draft Bicycle and Pedestrian Plan for the National Capital Region Michael Farrell TPB Staff Presentation to the Transportation Planning.
Outdoor Learning Area School Parking School Playground Existing Recreation. Facilities School Parking Neighborhood Tree Buffer Basketball Courts Abandoned.
TOD Technical Assistance Panel June 21, rd STREET, San Pablo CA.
The Main Street Bike Lane Project LADOT Bike Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Central Corridor LRT Review of Washington and Northern Alignments Jan Lysen and John Siqveland December 10, 2009 Image: MPR News Q.
Village of Villa Park Comprehensive Plan Update CPAC Meeting December 2 nd, 2008.
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
LITTLE BOHEMIA NEIGHBORHOOD ASSOCIATION 35E Bike Path Enhancement CIB Proposal.
Titusville to Edgewater Bike Loop PD&E Study FDOT Project Number: Volusia County, Florida FDOT Project Number: Brevard County,
Pierce Butler Lexington Parkway Bicycle Connection Presented by: Mr. Michael Recycles Bicycles Sponsored by: Mr. Michael Recycles Bicycles District 11.
 Rice Street Traffic Study Proposal Presentation to the Saint Paul CIB Committee March 31, 2015.
Urban Bicycle Networks Throughout Virginia I. Introduction This multimodal investment network is the incorporation of four urban bicycle studies and plans.
A PRESENTATION BY THE DISTRICT 1 COMMUNITY COUNCIL POINT DOUGLAS ROAD RECONSTRUCTION.
Minnesota State Planning Conference September 28, 2011.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
A PRESENTATION BY THE DISTRICT 1 COMMUITY COUNCIL SIDEWALK TO BATTLE CREEK REC.
Martin J. Walsh Mayor Michael Dennehy Commissioner Public Hearing January 20, 2015.
Union Park District Council Streets & Utilities CIB Proposal Pedestrian Safety & Traffic Improvements in the Snelling-Selby Area.
FOOTHILL ELEMENTARY TRAFFIC PROBLEM SOLVING May 19, :30 p.m.
C ENTRAL E STUARY P LAN A V ISION F OR O AKLAND’S W ATERFRONT Central Estuary Plan A VISION FOR OAKLAND’S WATERFRONT Specific Plan and Environmental Assessment.
Bottineau Rezoning Study University Neighborhood Network Mary Kaiser, Phil Kelley, Ashley Kobberdahl.
Vacation of East 6 th Street From Mounds Blvd to Maria.
BROOKLYN BRIDGE PARK micah sherman daniel martinez.
Voorhees Town Center Vision
Rock Creek East II Livability Study
SMART URBAN FUTURES PRESENTATION
Willow Meadows Civic Club Meeting September 13, 2011
MASTER THOROUGHFARE PLAN AND STREET DEVELOPMENT STANDARDS
Nolanville Main Street Sidewalk & Bicycle Connectivity
SMART URBAN FUTURES PRESENTATION
Sustainability Inform kids, “More than 600 “new urbanist” communities are planned or in construction across North America.”
Streetcars, a better way to go!
Emily Guenther Zach Olson Laura Scott Cameron Wein
M14A/D Select Bus Service
Minnesota State Planning Conference September 28, 2011
American Planning Association APHA Built Environment Institute
National Organization of Minority Engineers Leadership Summit
Histon Road LLF Resolutions and Programme
Presentation transcript:

Union Park District Council Ayd Mill Road Task Force St. Paul Capital Improvement Budget Proposal

 Background 2

  1965: Opened as I-35E to I94 connector, but NOT connected  1993: EIS process started  2002: Connection to I-35E opened  2005: EIS Completed, with Record of Decision issued for “4-lane Extended to St. Anthony.”  2005-present: No action.  2010: EIS expires. New action requires a Supplemental EIS. 3 (Very) Brief History

 Ayd Mill Road Today  Four lanes.  A speed limit of 45 mph.  A connection to I-35E on the south end.  A northern terminus on Selby between Pascal and Saratoga.  Several entrances/exits closed with temporary barricades. 4

 Ugly… but with potential 5

 6 Temporary Barricades

 Current North-End Connect Hamline to St. Anthony Selby to Snelling 7 7 stoplights thru residential area and Concordia U4 stoplights through bustling retail area Congestion

 8 Shortage of Parks No parks

 9 EIS-Proposed Extension (2005)  Roughly 1/3-mile, in effect re-creating Albert Avenue between Selby and St. Anthony Aves.  Behind Concordia U athletic fields  Just west of Higher Ground Academy  Across I-94 on new bridge to St. Anthony Ave.  Just east of US Post Office  Through nonresidental area

 The Proposal 10

 Summary This study uses a community process to identify a preferred disposition of the north end of Ayd Mill Road, prior to the legally-required Supplemental Environmental Impact Study. 11

  Enhance livability in north end neighborhoods.  Improve car, bicycle and pedestrian connectivity.  Encourage pedestrian and bicycle activity.  Increase multi-modality and sustainability.  Move some traffic (and associated congestion, accidents and pollution) out of residential areas. Why Change Ayd Mill Road? 12

  Support redevelopment at Selby and Snelling.  Support redevelopment near Snelling and I-94.  Foster use of the light rail system.  Correct the long-noted absence of parks in area.  Aesthetically improve the area. Why Change… (Continued) 13

  Changes in 2002 made the north end particularly unlivable.  Some of the trickiest resolution problems are in the north end. Why Just the North End? 14

  It’s overdue: Since 2002 traffic at the north end has become too congested, too dangerous to residents.  New development at Snelling and Selby.  Imminent opening of the Green Line LRT.  Likely new development near Snelling and I-94.  The reconstruction of the Hamline Avenue bridge. Why Now? 15

  Directed by DPED with City Council and DPW.  Including a Community Process, preceding data collection.  Including Data Collection and Analysis conducted by DPW and reviewed and approved by outside consultant. Study Components 16

  Using “ Context Sensitive Solutions ” approach.  Facilitated by a nationally-recognized Consultant.  Credible, engaging all stakeholders, including representatives from the south end.  Investigating New Design Ideas as well as long- identified ones.  No preconceived outcome. Community Process 17

  Reduce accidents, noise, congestion and pollution at the north end.  Reduce cut-through traffic on north end residential streets.  Restrict truck traffic on Ayd Mill and in neighborhoods.  Provide a bicycle and pedestrian trail along Ayd Mill.  Add green space for neighborhood use. The Preferred Solution MUST: 18

  Traffic calming on Ayd Mill Road and in neighborhoods.  Alternatives to removal of the Pascal Avenue bridge.  Noise and pollution remediation along Ayd Mill Road.  Aesthetic and safety improvements in affected north end streets and intersections.  Increased transit options.  Bike and pedestrian connections to Light Rail. Add’l Issues to Study 19

 20 Park Opportunity  2008 UPDC proposal  Expanded Community Garden space to include Hamline Ramp and “Ashland Park.”  Conceptual plan includes:  Picnic space  Playgrounds  Open space for recreation  Walking paths  Edible plants and trees that attract wildlife.

 21