Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.

Slides:



Advertisements
Similar presentations
CERN IT Department CH-1211 Genève 23 Switzerland t Mobile services: Sunrise SWAP Rodrigo Sierra IT/CS.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
Ryerson Community School and Vocal Music Academy News and Important Dates.
2012 CALENDAR. JANUARY 2012 Sunday 日 Monday 月 Tuesday 火 Wednesday 水 Thursday 木 Friday 金 Saturday 土
Earth Sciences Contact: Dept Office The Department Office is open 9:00am until 5:00pm Monday - Friday.
Saturday May 02 PST 4 PM. Saturday May 02 PST 10:00 PM.
Whole School Attendance Whole School Attendance 94.64% Overall School Absence 5.36%
MONDAYTUESDAYWEDNESDAYTHURSDAYFRIDAYSATURDAYSUNDAY WEEK WEEK WEEK WEEK WEEK CALENDAR PROJECT.
On Sunday, it was 59° at 10:00. From 8:00 until 10:00 it had cooled off by 4 degrees. What was the temperature at 8:00?
LHC Machine Status Report Roberto Saban LHCC June 4 th 2014.
What day is today? What`s the date?. Sunday Monday Tuesday Wednesday Thursday Friday Saturday What day is today?
CV activities on LHC complex during the long shutdown Serge Deleval Thanks to M. Nonis, Y. Body, G. Peon, S. Moccia, M. Obrecht Chamonix 2011.
UPS network perturbations in SX2 Vincent Chareyre EN-EL-SN ALICE Technical Coordination Meeting 7 May 2010.
RWA, 8/12/2006 Present Preliminary Production Plan All still preliminary, as we are re-establishing production. January 9 th,2007: –Delivery of 2 ring.
LS1 : EL Upgrades & Consolidation Chamonix– February 8 th 2012 F. Duval on behalf of EN/EL The goal of LS1 is to implement everything needed for a safe.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
Technical Support Activities in PH-ADO-PO
ECRs and ES for the LHC Last presentation on the 26 th of August 2015 (LMC 232) S. Chemli for EN-MEF-DC LMC xxx.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
EN-CV interventions during YETS
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
Cable Layouts, Connectors for the LHC GAS SYSTEMS GAS COORDINATION MEETING, OCTOBER 2005 PH / DT1 GS.
Non Leap YearLeap Year DateDay NumberMod 7Day NumberMod 7 13-Jan Feb Mar Apr May Jun Jul
Kelowna Secondary Grade 10/11 Parent Ambassadors December 5 th, 2013.
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
1.It will help them feel like part of a group and also it will make the school’s sports team feel encourage. 2.To gain knowledge 3. Because they are comfortable.
Cooling & Ventilation feed-back M. Nonis – EN/CV.
LHC-YETS Coordination meeting #9 24 th November, 2015.
Overview of the main events related to TS equipment during 2007 Definition Number and category of the events Events and measures taken for each machine.
On behalf on EN-EL October 1 st, 2015 YETS Works EN-EL [ CF excluded ]
E. Calvo (BE/BI-QP) 12/10/2015 LHC BI fibre infrastructure.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Infrastructure activities planned on ATLAS during YETS 2015 Thanks to all the experts who contributed Bruno Saint Sulpice, Denis Dumas, Serge Deleval,
Overview Extraction tests: TT40 and TT60, week 21 –controls and data, interlocking, extraction, MKE6 transfer function and energy tracking, high intensity,
Overview of the LHC Year End Technical Stop
LHC progress Tuesday 28 th April 2015 Coordination: Mike Lamont, Wolfgang Hofle.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
Beam Instrumentation during LS1 Ray Veness on behalf of the BE/BI group.
EN-EL Activities for LS2 LIU, Consolidation, Maintenance, Operation Nicolas Bellegarde on behalf of EN-EL.
R2E relocation & shielding LS1 preparation Anne Laure Perrot EN/MEF- LE Discussion with OP colleagues, 5 th July 2012.
Injectors & LHC report S. Baird and M. Bernardini on behalf of OSS members 20/09/2013LSC - EN-MEF-OSS1.
D.Macina TS/LEATOTEM Meeting25/02/2004 Roman Pot test at the SPS Test of the Roman Pot prototype in the SPS proposed in December 2003 (CERN/LHCC ):
Proposal for rerouting of buried electrical networks and optical fibres at Point 1 LS2 Committee meeting S. Bertolasi on behalf on EN/EL WP17.2 HL-LHC.
CALO News Pascal Perret LPC Clermont 22 January 2012.
My Plan to Go to Around the world By: Benedict/5C.
LHC schedule status K. Foraz EN-MEF 12/04/2013LSC - K. Foraz1.
R2E relocation & shielding activities: status report Anne Laure Perrot EN/MEF- LE On behalf of the R2E coordination team LS1 Committee – meeting #48, 27.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
YETS & LS2 Works EN-EL / Power distribution
Framework Schedule from EYETS 2016 to LS2
SPS Winter stop Planning meeting (N06) 05/01/2011
YETS & LS2 Works EN-El on LHC / Power distribution
TE-MSC activities in SPS during LS2
Dates for Stop Smoking Courses 2013
Injector De-cabling Project
LHC-EYETS 2016/17 Coordination meeting #18
YETS & LS2 Reminder G. Girardot 20 juin 2017.
LHC-TS3 Coordination meeting #3
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
BLM planning 24/02/2014.
BLM planning 03/03/2014.
FY 2019 Close Schedule Bi-Weekly Payroll governs close schedule
JUNE 2010 CALENDAR PROJECT PLANNING 1 Month MONDAY TUESDAY WEDNESDAY
BLM planning 03/02/2014.
LHC coordination meeting 12th December 2017
Presentation transcript:

Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini

Shutdown dates and access constraints Maria Barberan - BE-BI_YETS - LHC Coordination2 LHC- YETS: From Monday 14th to Friday 4th March « Piquet » phone during YETS Weekly LHC coordination meetings Tuesday 8h30, room Contact person BE-BI Gherard Shneider YETS LHC schedule YETS LHC Access Constraints

3 LHC machine Schedule for YETS, EDMS , INDICO LHC back to OP on 4 th March Powering tests from 5 th to 16 th March Experiments closed on 16 th March Machine check out from 17 th to 20 th March YETS schedule overview – as 1 st Dec.

4 EDMS: Test Secours (10min) All points on 17 th December (6am) Works on the Automatism & Circuit Breaker LHC5 + CMS 21 st – 24 th December No Access in the Surface & Underground Areas LHC1 + ATLAS25 th January (ATLAS ok) LHC2 + ALICE9 th February LHC35 th February LHC46 th January LHC5 + CMS 5 th January LHC614 th January LHC715 th January LHC8 + LHCb7 th January PM1821 st January Prevessin13 th February (Saturday) Meyrin + Adm.2 nd or 3 rd January Meyrin W. + ISR23 rd January BA8023 rd February BA8124 th February BA th February PS + B9 th & 10 th January BA111 th February BA219 th January BA312 th February BA4 + CNGS13 th January BA510 th February BA620 th January BA74 th February AUG Test Auto Transfer Test Previous & final works from 28 th January until 1 st February (access possible) No access LHC1 + ATLAS + LHC18 + SPS6 + SPS7 on 30 th January (Saturday) Electrical Activities LHC machine Schedule for YETS, EDMS , INDICO

Activities presented by BE-BI 5 Maria Barberan - BE-BI_YETS - LHC Coordination

AFP: BPM and DOROS electronics 6 Intervention date: 26 th January Duration: ? Cable campaign EN-EL: W1 – W3 TE-VSC works for AFP: W2 – W6 Maria Barberan - BE-BI_YETS - LHC Coordination

BPM: DOROS installation in IP2 & IP8 7 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date TBC: From W7 – W9 Duration: ? Cable campaign EN-EL: W5 – W6

BGV: Installation of tent 8 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date: W1 – W2 Duration: 10 days No Access LSS4 : From W8

BGV: Re-installation of a cooling line 9 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date: W5 – W6 Duration: 10 days No Access LSS4 : From W8

BWS: Change of ferrites 10 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date: in stand-by  more information on Mid-January Duration: 2 days TE-VSC works for BWS: in stand-by  more information on Mid-January No Access LSS4 : From W8

BSRTR: Change of BSRTR Mirror exchange 11 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date: W51 Duration: 2 days TE-VSC works for BSRT: W51 - W1 – W2 No Access LSS4 : From W8

Installation of BSRT coronagraph and Maintenance 12 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date: W3 – W7 Duration: 5w No Access LSS4 : From W8

BQS: Installation of Schottky electronics 13 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date TBC: From W7 (check with EN-EL) Duration: ? Cable campaign EN-EL: W3 – W7 No Access LSS4 : From W8

Install new BCTWs on BCTs 14 Maria Barberan - BE-BI_YETS - LHC Coordination Intervention date TBC : From W51 – W7 Duration: ? No Access LSS4 : From W8

BPM collimator 5 th axis Maria Barberan - BE-BI_YETS - LHC Coordination15 Dismantling BLM: Dismantling BPM: Re-installation: P1L P1R P5L P5R 16 th Dec.16 th Dec.17 th Dec.17 th Dec. 4 th Jan.5 th Jan. 18 th - 22 nd Feb.1 st - 3 rd Mar.12 th – 17 th Feb.24 th – 26 th Feb.

BE-BI activities during YETS Maria Barberan - BE-BI_YETS - LHC Coordination16