TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou.

Slides:



Advertisements
Similar presentations
Julien PALLUEL BE/CO/FERadiation To Electronics ‘1st Combined Workshop & School-Days’ June 2nd/ 3rd Julien Palluel BE/CO/FE.
Advertisements

DC/DC Switching Power Converter with Radiation Hardened Digital Control Based on SRAM FPGAs F. Baronti 1, P.C. Adell 2, W.T. Holman 2, R.D. Schrimpf 2,
TE / CRG / Paulo Gomes The Control System for the LHC tunnel cryogenics, p. 1 CERN Portuguese Teachers Programme, 7 Sep 2011 Dr. Paulo Gomes on behalf.
, a rad-tol FPGA-based WorldFIP agent E. Gousiou, P.Alvarez, E.van der Bij, G.Penacoba, J. Serrano | CERN TWEPP 2011 nan FIP.
Development of a Linux- based small-size controller using PoE technology T. Masuda, T. Fukui, R. Tanaka SPring-8 ICALEPCS2005, Oct , Geneva, Switzerland.
Beam Loss Analysis Tool for the CTF3 PETS Tank M. Velasco, T. Lefevre, R. Scheidegger, M. Wood, J. Hebden, G. Simpson Northwestern University, Evanston,
Introduction AD620 Instrumentation Amplifier
1. Commissioning of cryogenic crates using Mobile Test Bench 1. The Mobile Test Bench 2. Cryogenics crates and equipment – types of transducers and actuators.
Vegard Joa Moseng BI - BL Student meeting Reliability analysis summary for the BLEDP.
LECC 2006 Ewald Effinger AB-BI-BL The LHC beam loss monitoring system’s data acquisition card Ewald Effinger AB-BI-BL.
TS-LEA, CERN, 1211 Geneva 23 1 T. Wijnands TS/LEA, C. Pignard AB-CORADWG-RADMON day – 1 December 2004 LHC Power Converters & Radiation T. Wijnands TS/LEA.
Oliver Bitterling  Introduction to the QPS  Radiation damage in electronic systems  Construction of radiation tolerant systems  Radiation test and.
COMPONENT TEST H4IRRAD 15 TH NOVEMBER 2011 G. Spiezia, P. Peronnard, G. Foucard, S. Danzeca, P. Gander, E. Fadakis (EN/STI/ECE)
SCADA and Telemetry Presented By:.
Stephen Pemberton TE-MPE-EE 1 DQLPUR Prototype Testing Initial Results: Thermal Tests Voltage Drop Off Tests.
Cryogenic Systems Juan Casas (TE-CRG-CI) In behalf of the CRG team R2E and Availability Workshop - Cryogenic Systems - JCC
2012 H4IRRAD test campaigns Summary of results S. Uznanski CERN, Geneva, Switzerland Radiation Working Group meeting Oct 16, 2012.
LHC Beam Screen Heaters: System overview, consolidation needs and project planning 4 February TE-CRG/JCC (Beam Screen Heater Review) 1.
Electronics for PS and LHC transformers Grzegorz Kasprowicz Supervisor: David Belohrad AB-BDI-PI Technical student report.
DCS TCSG November 10th 1999, H.J.Burckhart1 Status of the general purpose I/O system LMB u DCS Architecture u LMB u Local Monitor Box (LMB) u Concept u.
BepiColombo/MMO/PWI/SORBET PWI meeting - Kanazawa 24/03/2006M.Dekkali MMO PWI Meeting Kanazawa University 24 th March 2006.
21/01/02 - ECAL Cooling - Arnaud Hormiere ST/CV 1 Development of ECAL COOLING PLANT Application to a Super Module.
Calorimeter upgrade meeting - Wednesday, 11 December 2013 LHCb Calorimeter Upgrade : CROC board architecture overview ECAL-HCAL font-end crate  Short.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
Seminar ON SMART SENSOR Submitted by : SUBIR KUMAR GHOSH Roll No. IN-14/04 Electrical & Instrumentation Deptt. B.E 7th Semester JORHAT ENGINEERING COLLEGE,
The Radiation Tolerant Electronics for the LHC Cryogenic Controls: Basic Design and First Operational Experience J. Casas, G. Fernandez Peñacoba & M. A.
N A S A G O D D A R D S P A C E F L I G H T C E N T E R I n t e g r a t e d D e s i g n C a p a b i l i t y / I n s t r u m e n t S y n t h e s i s & A.
Temporary irradiation facility at the CNGS beam D. Mcfarlane, T. Wijnands,
LHC Cryogenics Control: INTEGRATION OF THE INDUSTRIAL CONTROLS (UNICOS) AND FRONT-END SOFTWARE ARCHITECTURE (FESA) APPLICATIONS Enrique BLANCO Controls.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
NanoFIP Progress Report Eva. Gousiou BE/CO-HT & the nanoFIP team RadWG 23Nov11.
Apr, 2014 TE-EPC-CCE Radiation Tests
Nov 28, 2013 Power Converters Availability for post-LS1 LHC TE-EPC-CCE.
Acquisition Crate Design BI Technical Board 26 August 2011 Beam Loss Monitoring Section William Vigano’ 26 August
LHC Collimators low level control rack test experience in CNGS A Masi, LHC Collimators low level control rack test experience in CNGS LHC Collimators low.
BLM AUDIT 2010Ewald Effinger BE-BI-BL BLM tunnel installation and data acquisition card (BLECF) Ewald Effinger AB-BI-BL.
André Augustinus 16 June 2003 DCS Workshop General Purpose Monitor.
A complete DC/DC converter ASIC for LHC upgrades S. Michelis, F. Faccio, G. Blanchot, I. Troyano CERN PH-ESE S.Saggini University of Udine, Italy Twepp.
1 BROOKHAVEN SCIENCE ASSOCIATES Power Supply Status George Ganetis Power Supply Status ASAC Review October 22-23, 2009.
FPGAs in ATLAS Front-End Electronics Henrik Åkerstedt, Steffen Muschter and Christian Bohm Stockholm University.
Numerical signal processing for LVDT reading based on rad tol components Salvatore Danzeca Ph.D. STUDENT (CERN EN/STI/ECE ) Students’ coffee meeting 1/3/2012.
R2E Availability October 15 th 2014 Experience from Past LHC and Injector Operation and scaling to the future G. Spiezia.
S. Bota – Calorimeter Electronics overview - July 2002 Status of SPD electronics Very Front End Review of ASIC runs What’s new: RUN 4 and 5 Next Actions.
The Control System for the LHC tunnel cryogenics Controlling Cool Accelerators Controle da Criogenia de Aceleradores de Partículas Dr. Paulo Gomes CERN.
R2E Availability October 17 th 2014 ADC and Common development options G. Spiezia.
M. TWEPP071 MAPS read-out electronics for Vertex Detectors (ILC) A low power and low signal 4 bit 50 MS/s double sampling pipelined ADC M.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
1 Radiation worries in the cavern L.Jirdén
LHC Electronics irradiation tests in the CNGS side gallery September 2009 – partial results D.Kramer for the RADWG 30/9/09report to LMC Thanks to B.Todd,
ATLAS DCS Workshop on PLCs and Fieldbusses, November 26th 1999, H.J.Burckhart1 CAN and LMB in ATLAS u Controls in ATLAS u CAN u Local Monitor Box u Concept.
TE-MPE-CP, RD, 28-Sep Problems with QPS DAQ Systems During LHC Operation, 1 st Results from 2010 CNRAD Tests R. Denz TE-MPE-CP.
PCAR Precision In Practice 1 Precision In Practice Achieving the best results with precision Digital Multimeter measurements Paul Roberts Fluke Precision.
February 4 th, Quality assurance plan: production, installation and commissioning N.Vauthier TE-CRG Technical Review on Beam Screen Heater Electronics.
Fan Assembly Driven by Magnetic Fields
Macom RF switches radiation-test results
nanoFIP 5th WorldFIP Insourcing Meeting Progress Report
2007 IEEE Nuclear Science Symposium (NSS)
Calorimeter Mu2e Development electronics Front-end Review
Cryo equipment strategy in the R2E context
Outline Introduction to LHC Power Converters Remaining Inventory Observed Availability New inventory – FGClite Cumulative & SEE Effects Maintenance.
Development, manufacturing and commercialisation of precision equipment for science
6th WorldFIP Insourcing Meeting
Compact readout unit for the EP-RADMON radiation monitoring sensors
Henning E. Larsen, INFN 12 July 2006
Irradiation test of Pressure Transducers for the LHC machine
Maintaining Data Integrity in Programmable Logic in Atmospheric Environments through Error Detection Joel Seely Technical Marketing Manager Military &
Combiner functionalities
Report on ATF2 Third Project Meeting ATF2 Magnet Movers ATF2 Q-BPM Electronics Is SLAC ILC Instrumentation Group a good name?
MICROFIP-Do we need further tests? 28th June 2011
Radiation Working Group RADWG
Presentation transcript:

TWEPP Paris, 09 Radiation Tests on the complete system of the instrumentation electronics for the LHC Cryogenics at the CNGS test facility Evangelia Gousiou CERN TE CRG

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

The Cryogenic Instrumentation Electronics o ~ electronic boards assembled in ~800 crates, all around the LHC tunnel and in “protected areas”. Conditioners: measure temperature, pressure, He level Actuators: AC and DC electrical heaters o All electronics will be subject to radiation (ionizing, non-ionizing dose and SEE). o Manufactured mainly with COTS that have been prequalified, since space or military technologies were incompatible with the project budget. ->-> Replacements foreseen during maintenance campaigns.

Conditioner Channels Architecture Conditioner card (holds 2 independent channels) ASIC ADC FPGA MUX ASIC ADC FPGA Temp. Sensor Pressure Sensor

ASIC ADC FPGA MUX ASIC ADC FPGA Conditioner Channels Architecture ASIC ADC FPGA MUX ASIC ADC FPGA Conditioner card (holds 2 independent channels) ASIC ADC FPGA MUX ASIC ADC FPGA MUX FPGA WFIP Communication card (for up to 7 cards) WorldFIP AGENT SRAM Temp. Sensor Pressure Sensor

ASIC ADC FPGA MUX ASIC ADC FPGA Conditioner Channels Architecture ASIC ADC FPGA MUX ASIC ADC FPGA Conditioner card (holds 2 independent channels) ASIC ADC FPGA MUX ASIC ADC FPGA MUX FPGA WFIP Communication card (for up to 7 cards) WorldFIP AGENT SRAM WorldFIP FIELDBUS Temp. Sensor Pressure Sensor

ASIC ADC FPGA MUX ASIC ADC FPGA Conditioner Channels Architecture ASIC ADC FPGA MUX ASIC ADC FPGA Conditioner card (holds 2 independent channels) ASIC ADC FPGA MUX ASIC ADC FPGA MUX FPGA WFIP Communication card (for up to 7 cards) WorldFIP AGENT SRAM WorldFIP FIELDBUS Features for high accuracy o Continuously auto-calibrated system: Comparison with a reference on each measurement for gain drift correction. Voltage polarity inversion on each measurement for offset correction. Excitation current inversion for compensation of thermocouple effects. Features for high accuracy Temp. Sensor Pressure Sensor

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

Radiation tolerance strategy Components Selection o Rad-hard ASIC, Voltage Regulator developed at CERN o Anti-fuse FPGA o WorldFIP agent using signal transformer rather than optical insulators o Radiation tests on COTS in dedicated test facilities

Radiation tolerance strategy Mitigation Techniques o Triple module redundancy on FPGA logic o Frequent refreshment of WorldFIP agent’s SRAM memory to reduce error probability o Overdesign of power supplies and thermal dissipators 1s 20ms WorldFIP FIELDBUS 1s WorldFIP Communication Card Conditioner Card FPGA SRAM Components Selection o Rad-hard ASIC, Voltage Regulator developed at CERN o Anti-fuse FPGA o WorldFIP agent using signal transformer rather than optical insulators o Radiation tests on COTS in dedicated test facilities

Radiation Test Campaigns LHC Tunnel Electronics o Tests in dedicated test facilities for all the components (ITN-Portugal, UCL-Belgium, PSI-Switzerland, CERN-Switzerland). Protected Areas Electronics o Radiation levels underestimated -> -> Electronics not designed to stand radiation. The test campaign at CNGS aims at Validating the performance of the complete systems for both cases (tunnel and protected areas).

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

Why CNGS? o Tests of complete systems (crates) o Exposure to LHC-like radiation field o Good knowledge of radiation levels from simulations and real time monitoring o Free of charge!

The CNGS Test Facility Proton Beam 2ndary Beam Graphite Target Particle Shower Neutrino Beam Main Tunnel Service Gallery CERN Gran Sasso (Italy) Ducts

Graphite Target Particle Shower Main Tunnel Service Gallery CERN Ducts The CNGS Test Facility DUT Proton Beam 2ndary Beam Neutrino Beam Gran Sasso (Italy)

Gran Sasso (Italy) We are provided with o Mains o WorldFIP Communication o Real Time Rad Monitors o 2 x 48pins Connectors Proton Beam 2ndary Beam Graphite Target Particle Shower Neutrino Beam Main Tunnel Service Gallery CERN Ducts DUT The CNGS Test Facility Ctrl Room … … 2km

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

Equipment to Test o 2 Cryogenic Instrumentation Crates fully equipped with Conditioners, Actuators, Communications and Power Supply Cards: o 25 Cards (=50 channels) of LHC tunnel electronics o 8 Cards (=16 channels) of “protected areas” electronics

Test Setup o Testing conditions: Fixed loads to conditioner channels Fixed set points to actuator channels 4 thermometers in different locations o On line measurements on DUT: WorldFIP data as in the LHC control system Current Consumption and Voltage Levels

Testing Periods o 1 month dry run tests to confirm electronics and measurements reliability. + o 1.5 months at low dose radiation station: o 1.5 months at high dose radiation station:

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

Protected Areas Electronics o Cumulative effects failures: -> Failing component: Solid state relay ->-> Solutions for the LHC: Moving of electronics, shielding of protected areas. o Same results for 6 channels and reproduced in two different CNGS locations AC Heater Actuators Overview

Protected Areas Electronics 1MeV (cm -2 ) 2e10 4e10 6e10 8e10 1e11 1.2e11 1.4e11 TID (Gy ) Power on load

Protected Areas Electronics 1MeV (cm -2 ) 2e10 4e10 6e10 7.3e10 1e11 1.2e11 1.4e11 TID (Gy ) Power on load

Protected Areas Electronics FPGA Solid State Relay Mains Set point Failing Component 1. AC Heater Actuators

Protected Areas Electronics FPGA Solid State Relay Mains Set point Failing Component 1. AC Heater Actuators

Protected Areas Electronics o Cumulative effects failures: -> Failing component: DC-DC converter; plans for tests in dedicated test facilities. 4 o Same results for 12 channels and reproduced in two different CNGS locations. 2. Insulated Temperature Conditioners Overview (I)

Protected Areas Electronics TID (Gy ) Current Consumption (A) 70 2

o Single Event Upsets: -> Failing component: Digital Isolator ->-> Mitigation Technique for LHC: soft reset automatically forced by the control system; No influence on proper operation of the machine. Protected Areas Electronics o Same results for 12 channels and reproduced in two different CNGS locations Insulated Temperature Conditioners Overview (2)

Protected Areas Electronics FPGA Digital Isolation Amplifier PT 100 Analog Isolation Amplifier measurement ctrl signals ……………………….. = Sensor Resistance ASIC ctrl signal 4 wire measurement 2. Insulated Temperature Conditioners SEE occurrence

Protected Areas Electronics FPGA Digital Isolation Amplifier 50 Ω Analog Isolation Amplifier ASIC 100μA 1 1 5mV 100μA = 50 Ω 2. Insulated Temperature Conditioners SEE occurrence

Protected Areas Electronics FPGA Digital Isolation Amplifier 50 Ω Analog Isolation Amplifier ASIC 100μA 1 1 5mV 0,5mV 100μA = 5 Ω 0 10μA 0,5mV o A soft remote Reset brings the situation back to normal. o Cross section calculation: 2. Insulated Temperature Conditioners SEE occurrence

Tunnel Electronics Overview o Tunnel electronics have received till now a cumulated dose of:..and the tests are still ongoing! o No Single Event Errors! o Still within specs in output accuracy! >10

51 48 TID (Gy) Resistance (Ω) Tunnel Electronics 50

Tunnel Electronics % Design Specs -0.3% 48 TID (Gy) Resistance (Ω) 50

Tunnel Electronics Overview o No SEE! o Still within specs in output accuracy! o BUT! Gain drifts already observed and corrected by auto calibration features. o Tunnel electronics have received till now a cumulated dose of:..and the tests are still ongoing! >10

Tunnel Electronics Sensor Voltage Reference Voltage V ref = G*I*R ref V sens = G*I*R sens

Tunnel Electronics Sensor Voltage Reference Voltage V ref = G*I*R ref V sens = G*I*R sens

Tunnel Electronics Sensor Voltage Reference Voltage V ref = G*I*R ref V sens = G*I*R sens V ref R sens =R ref V sen 50

Outline o Overview of the Cryogenic Instrumentation Electronics o Radiation tolerance strategy o CNGS Test Facility o Test Setup o Test Results o Conclusions

Conclusions o CNGS testing has provided quantitative knowledge about the radiation tolerance of our complete system. o Confirmation of LHC tunnel electronics reliability. o Identification of protected areas electronics weaknesses. o First approach of possible solutions.

Conclusions o CNGS testing has provided valuable knowledge for all our electronics o Further tests on specific components need to be performed o Optimism in the case of tunnel electronics o Multiple solutions for the protected areas electronics problems o Thank you for your attention

o CNGS testing has provided valuable knowledge for all our electronics o Further tests on specific components need to be performed o Optimism in the case of tunnel electronics o Multiple solutions for the protected areas electronics problems Conclusions o Thank you for your attention

TWEPP Paris, 09 Extras

Voltage & Current Measurements o In order to probe and gain access to the Current Consumption and Voltage Level signals, modification needed to be done on the Power Supply Card The Power Supply Card receives the mains and provides channels of DC Voltage for all the Cards in a Crate A 1Ω robust resistance inserted in series in the tracks of the Power Card I V 1 Ω1 Ω

Voltage & Current Measurements o In order to probe and gain access to the Current Consumption and Voltage Level signals, modification needed to be done on the Power Supply Card The Power Supply Card receives the mains and provides channels of DC Voltage for all the Cards in a Crate A 1Ω robust resistance inserted in series in the tracks of the Power Card I V 1 Ω1 Ω

Cryogenic Instrumentation Conditioner Channels Architecture High Accuracy main features o Auto-calibrated System: high precision resistor measured every time a variable measurement is taken and correction of amplifier offset by amplifier input inversion as well as correction of cable TC effects by current inversion. ASIC ADC FPGA MUX WorldFIP FIELDBUS MUX FPGA Conditioner Card (holds 2 independent channels) WFIP Communication Card (holds up to 7 Cards) WorldFIP AGENT SRAM ASIC ADC FPGA MUX ASIC ADC FPGA Pressure Sensor PT 100 Pressure Sensor ASIC

Cryogenic Instrumentation Conditioner Channels Architecture High Accuracy main features o Auto-calibrated System: high precision resistor measured every time a variable measurement is taken and correction of amplifier offset by amplifier input inversion as well as correction of cable TC effects by current inversion. ASIC ADC FPGA MUX WorldFIP FIELDBUS MUX FPGA Conditioner Card (holds 2 independent channels) WFIP Communication Card (holds up to 7 Cards) WorldFIP AGENT SRAM ASIC ADC FPGA MUX ASIC ADC FPGA Pressure Sensor PT 100 Pressure Sensor high precision resistor ASIC V sens = G*I*R sens

Conditioner Card (holds 2 independent channels) ASIC PT 100 Cryogenic Instrumentation Conditioner Channels Architecture High Accuracy main features o Auto-calibrated System: high precision resistor measured every time a variable measurement is taken and correction of amplifier offset by amplifier input inversion as well as correction of cable TC effects by current inversion. ASIC ADC FPGA MUX WorldFIP FIELDBUS MUX FPGA WFIP Communication Card (holds up to 7 Cards) WorldFIP AGENT SRAM ASIC ADC FPGA MUX FPGA Pressure Sensor Pressure Sensor high precision resistor V sens = G*I*R sens V ref = G*I*R ref ASIC

Conditioner Card (holds 2 independent channels) ASIC PT 100 Cryogenic Instrumentation Conditioner Channels Architecture High Accuracy main features o Auto-calibrated System: high precision resistor measured every time a variable measurement is taken and correction of amplifier offset by amplifier input inversion as well as correction of cable TC effects by current inversion. ASIC ADC FPGA MUX WorldFIP FIELDBUS MUX FPGA WFIP Communication Card (holds up to 7 Cards) WorldFIP AGENT SRAM ASIC ADC FPGA MUX FPGA Pressure Sensor Pressure Sensor amplifier input inversion V + sens = V off + G*I*R sen ASIC

Conditioner Card (holds 2 independent channels) ASIC PT 100 Cryogenic Instrumentation Conditioner Channels Architecture High Accuracy main features o Auto-calibrated System: high precision resistor measured every time a variable measurement is taken and correction of amplifier offset by amplifier input inversion as well as correction of cable TC effects by current inversion. ASIC ADC FPGA MUX WorldFIP FIELDBUS MUX FPGA WFIP Communication Card (holds up to 7 Cards) WorldFIP AGENT SRAM ASIC ADC FPGA MUX FPGA Pressure Sensor Pressure Sensor amplifier input inversion V + sens = V off + G*I*R sen V - sens = V off + G*I*R sen ASIC

Conditioner Card (holds 2 independent channels) ASIC PT 100 Cryogenic Instrumentation Conditioner Channels Architecture High Accuracy main features o Auto-calibrated System: high precision resistor measured every time a variable measurement is taken and correction of amplifier offset by amplifier input inversion as well as correction of cable TC effects by current inversion. ASIC ADC FPGA MUX WorldFIP FIELDBUS MUX FPGA WFIP Communication Card (holds up to 7 Cards) WorldFIP AGENT SRAM ASIC ADC FPGA MUX FPGA Pressure Sensor Pressure Sensor TC effects V I+ sens = G * (I*R sens +V TC ) V I- sens = G * (-I*R sens +V TC ) ASIC V TC + -