Value Engineering (VE)

Slides:



Advertisements
Similar presentations
Organization of Primary Entities
Advertisements

Bob Smith, P.E. Region 1 Benjamin Acimovic, P.E., Region 1
Calista AVCP Regional Energy Plan. Preliminary Planning and Stakeholder Involvement Resource Inventory and Data Analysis Develop and Review Draft Energy.
Value Engineering How DOT’s uses this valuable tool in project development What is it When is it used How do we use it.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
Aug. 22, 2007 Americas CF&S Kick Off Meeting 1 Overview of Value Engineering Program T. Lackowski.
Governor’s Center for Efficient Government. Mission The mission of the Governor's Center for Efficient Government is to promote fair and transparent best.
1. 2 RE Case Study What was the Project Objective? When did it all Start? What was the Plan? How did Negotiations take place? What were the Benefits of.
CEM-512 Value Engineering Highway Project: South Interchange.
Defense Contractor Financial Management presented to EPMC by Dr. Tony Perino.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Alternative Project Delivery Mechanisms The J. K. Spruce Experience Katherine Yates Assistant General Counsel.
Continuous Value Enhancement Process
1 THE OFFICE 2 OFFICE PROJECT COLLABORATION SYSTEM.
Procurement and Tendering Presentation to [NAME OF CLIENT] [YOUR NAME] [DATE]
PROCEDURES FOR SELECTING THE CONTRACTOR
Adjusting EPLC to your Project Colleen Robinson & Teresa Kinley Friday, February 6, 2009.
TOOL TO DESIGN FOR CONSTRUCTION WORKER SAFETY An Article Written by Gambatese, Hinze and Haas 1997.
The Analyst as a Project Manager
Lecture(3) Instructor : Dr. Abed Al-Majed Nassar
Financing Process 11/03/05.
Performance Monitoring All All Contracts require basic monitoring once awarded. The Goal of contract monitoring is to ensure that the contract is satisfactorily.
Euseden INTERNAL AUDIT & ASSURANCE SERVICES.
FPSC Safety, LLC ISO AUDIT.
DOE OFFICE OF INDIAN ENERGY Renewable Energy Project Development and Finance Framework: The 5 Step Process 1.
Pre-Project Planning Lessons from the Construction Industry Institute Construction Industry Institute Michael Davis, P. Eng, PMP Ontario Power Generation.
Introductions Mike Dement Multi Management Services
LS Engineering Associates Corporation LS Engineering Associates Corporation CORPORATE PORFILE Engineering Services ■ Bridge Inspection ■ Bridge Design.
Achieving Value: The How and Why of Value Engineering Paul Johnson, CH2M HILL Presented at the PNWS – AWWA 2008 Annual Conference Vancouver, Washington.
2005 AASHTO Value Engineering Conference Using VE in Design Build Presented by: Jerry R. Blanding Innovative Contracting Engineer FHWA – NRC July 21, 2005.
Public Works Contracting Marsha Reilly Office of Program Research House of Representatives recommended.
This Presentation is a Copyrighted Property of Waller S. Poage, AIA, CSI, MAI, CVS – All Rights are Reserved Session CDT 01 – Fundamentals Lesson CDT 1.3.
9 Closing the Project Teaching Strategies
THE ECONOMICS OF RE-CREATING EDUCATIONAL ENVIRONMENTS HOW TO ACHIEVE HIGH PERFORMANCE SCHOOLS.
Engaging with stakeholders: Adding value to the energy system 32nd Annual Conference of the International Association for Impact Assessment Porto Pedro.
What is Value Analysis? Value Engineering a.k.a. Architorture”
From Research Prototype to Production
Module 10 Session 10.4 Visual 1 Module 10 Organizing Procurement Session 10.4 Procurement of Services: Use of Consultants and Developing Terms of Reference.
Evaluating Investments in Information Technology Shannon Crump December 9, 2002 ISM 6021.
Developing and opening a new facility. Stages in hospitality facility development There are five (5) steps in the development of a hospitality facility:
PERT Overview Federal Perspective Annual PERT Workshop February 7-9, 2012 Nevada Site Office Evelyn Landini, Contracting Officer Brookhaven Site Office.
Commissioning of New and Existing Buildings Alexander P. Boucher, P.E., CEM, LEED BD+C.
Army National Guard Readiness Center Arlington, VA Arne Kvinnesland Construction Management AE Senior Thesis Final Presentation, Spring 2010 The Pennsylvania.
Sept., 2007 European CF&S Kick Off Meeting 1 Plan for a Value Engineering Study T. Lackowski.
5-1 Lesson 5 | Common Issues & Challenges. Describe how RSAs address project schedule (time), project cost, and agency liability concerns. Explain the.
Chapter 6: THE EIGHT STEP PROCESS FOCUS: This chapter provides a description of the application of customer-driven project management.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
Contractor Alternate Design Serving the Public’s Best Interest.
1 Introduction to Value Analysis Caltrans Delivers Value By Renee Hoekstra, CVS RH & Associates, Inc. for Caltrans.
SOLUTION What kind of plan do we need? How will we know if the work is on track to be done? How quickly can we get this done? How long will this work take.
Pre-Construction Activities to include: - Provide effective overlap period and oversight of effort - Estimates during - CPM Schedule - Identify lead-time.
At Lewis Field Glenn Research Center Industry Briefing Solicitation No. NNC04Z70010R Construction Services Contract June 15, 2004.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
Fundamentals of Project Control Chapter 11 Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
Glendale Community College Why LEED? Why Commissioning? Blair Seibert, AIA, LEED AP, CSBA VERDE CONCEPTS Los Angeles.
CONSTRUCTION MANAGEMENT AT RISK Prepared by: Nancy Fouad Carey Attorney AGC Alabama Birmingham Section Meeting November 5, 2012.
Establishing (or Enhancing) PMO Effectiveness Nicolle Goldman, PMP March 28, 2007.
Leadership for Project and Program Success How professional Construction Management saves time, saves money and delivers quality projects.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Imagery For The Nation Cost Benefit Analysis October 24, 2007.
Fort Stanwix National Monument Energy Audit Contract
EnMS Management Review
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Identify the Risk of Not Doing BA
(Additional materials)
Value Management.
Term Project: Challenges in supplying Energy to Central Region
The emphasis of Construction Management and Preconstruction Services in the AEC industry Preconstruction Services Construction Management.
#BIM TOP BENEFITS OF IMPRESSIVE BIM CONSTRUCTION MANAGEMENT FIRMS & BIM PRECONSTRUCTION SERVICES #BUILDINGINFORMATIONMODELING BIM Engineering U.S.,L.L.C.
Presentation transcript:

Value Engineering (VE) Presented by Gene Layne, CCM

Common Names for VE Value Engineering Value Management Value Methodology Value Analysis VE

What is Value Engineering? “ … an organized effort directed at analyzing the functions of systems, equipment, facilities, services, and supplies for the purpose of achieving the essential functions at the lowest life cycle cost consistent with the required performance, reliability, quality, and safety.” Source: Office of Management and Budget “Price is what you pay. Value is what you get.” ~ Warren Buffet

History of Value Engineering Evolved during World War II General Electric took lead after WW II Expanded to design & construction in 1960’s Government and private sector by 1970’s Numerous VE programs active today

the FHWA VE Summary Reports. Facts about VE Summary Of Past VE Savings Federal-Aid and Federal Lands Highway Programs the FHWA VE Summary Reports.   FY 2009 FY 2008 FY 2007 FY 2006 FY 2005 Number of VE Studies 427 388 316 251 300 Cost of VE Studies Plus Administrative Costs $17.08 M $12.47 M $12.54 M $8.15 M $9.80 M Estimated Construction Cost of Projects Studied $29.16 B $29.93 B $24.81 B $21.53 B $31.58 B Total No. of Proposed Recommendations 3297 3022 2861 1924 2427 Total Value of Proposed Recommendations $4.16 B $6.58 B $4.60 B $3.06 B $6.76 B No. of Approved Recommendations 1460 1323 1233 996 1077 Value of Approved Recommendations $1.70 B $2.53 B $1.97 B $1.78 B $3.19 B Return on Investment 99:1 203:1 157:1 219:1 325:1 the FHWA VE Summary Reports.

Approach to VE Study 3 Phases of a VE Study Value Engineering Study Pre-Workshop: preparation & organization VE Workshop: intensive & focused team during a 3-5 day dedicated effort Post-Workshop: Follow-up, assessment, report, meetings if needed, implementation VE Workshop Pre- Workshop Post- Workshop Value Engineering Study Defined: A Value Engineering (VE) workshop is an organized effort during the design conducted by an independent peer group to assure the design incorporates the necessary functions and essential project characteristics in the most cost effective manner without sacrificing quality, reliability, construction, and long term maintenance and operating costs. Team: Led by a CVS and composed of registered/ experienced peers. Team typically consists of an: architect, structural, civil, mechanical, electrical engineers and perhaps a cost estimator. Required by DGS on projects over $5 million.

VE Program VE Workshop typically takes place near the site VE Workshop - 40 hour, 5-day workshop Agenda by day Open issues

Establishing the VE Team A most critical action! Good experienced team = successful VE Three choices: Select team from people involved in project Select independent team not involved in project. “COLD TEAM” Hybrid: i.e. some insiders/some outsiders

VE Team Composition A VE specialist facilitates the study using the existing design team, owner personnel, and other owner consultants A VE specialist facilitates the study using an independent “cold team” working with the design firm, owner personnel, and other owner consultants A VE team is established without a specialist. The design team and owner conduct the VE Study.

The VE Work Plan Information & Objectives Owner and Designer Interview Study Design Perform Functional Analysis Owner and Designer Interview Presentation Q&A Speculation Creative Suggestion ( Keeping an Open Mind)

The VE Work Plan (cont’d) Evaluation Performance against Criteria Goals & Objectives Development Original first costs Operating Costs Life Cycle Costs

The VE Work Plan (cont’d) Final Report Considerations and Opportunities Final Presentation

Time Line Day 1 Day 2 Interview/Study project Perform Functional Analysis Opportunity suggestion Day 2 Continue functional Analysis Continue studying Drawings and develop more opportunities.

Time Line (cont’d) Day 3 Day 4 Day 5 Cost Estimating and value comparison Develop information for final report Day 4 Finalize Cost comparisons for final report Complete Value Analysis Day 5 Present findings to Owner and Design Team

Functional Analysis Two word abridgement Example Action Verb What is being done? Measurable Noun What is it being done to? Example Screw Driver+ Paint Action Verb = Stir Measurable Noun = Paint VE Analysis in basic terms = Blend liquid VE opportunity = Paint Stick

Functional Analysis (cont’d) Thought Process Paint Stick <$ Screwdriver Screwdriver can perform multiple functions Open paint can Stir paint Scrape surface Remove hardware

Functional Analysis (cont’d) Cable Tray Action Verb = Holds Measurable Noun = Cable Basic Terms = Organizes Cable Alternative product = J Hooks J Hooks are significantly less expensive and mounting every 10 feet reduces labor costs by half.

Interviewing the Owner and Designer Be courteous Never be suggestive Never critique design or offer criticism Listen intently to learn the thought process Never reveal VE opportunity at this stage Always show appreciation for their participation

Cost verses Value (The Analysis) First Costs Budget costs prior to VE study Alternative Costs from VE opportunity R.S. Means Vendor Sub Contractor Quote Considerations Escalation First costs mark-ups

VE Case Study NSU – Classroom and Nursing Building New building on campus 4-story 140,290 SF building Construction budget $36.5 million Likely to be built using the CM at-risk concept.

Project Summary - Electrical

Original Design Budget - Electrical

Alternate Budget - Electrical

Example of Cost Savings by Increasing Wire Size Example 1. A three-phase circuit feeding a 125 H.P. 460 V motor, operating at 75% load, 250 ft. from the load center, running 8,000 hours per year. Draw is assumed to be 75% of 156 full-load amps (FLA). 3/0 wire 4/0 wire Conduit Size 2 in. Estimated Loss (at 75% load and 44°C and 40°C,respective conductor temps.) 708 W 554 W Wire Cost $991 $1232 Conduit Cost $365 Incremental Cost $241 Energy Savings: at 75% load 1,237 kWh/year Dollar Savings: at $0.07 per kWh Payback $86.59/year 2 years, 9 months Dollar Savings: at $0.10 per kWh Payback $123.70/year 1 year, 11 months In this example, the payback is under 3 years, and the savings continue indefinitely into the future.

Project Summary - Architectural

Original Design - Architectural

Alternative Design - Architectural

Original Design Budget - Architectural

Alternative Budget - Architectural

VE Workshop Results

MBP Services related to VE Cost Estimating CPM Scheduling Constructibility Review Claims & Dispute Resolution Commissioning Lessons Learned Earned Value Management Facilities Assessment

Cost Estimating Evaluating Budget Costs Determining Alternative Costs Cost Comparison Realizing Value

CPM Scheduling Understand Projects start to completion dates. Determine new alternates impact on time. Opportunity to offer time savings to the project

Constructibility Review Determine current Design’s Constructibiltiy Opportunity to better Means & Methods Accepted proposals assist with Design correction

Claims Use of past experience on a claim to foresee potential design flaws Risk Mitigation

Commissioning Solid recommendation to enhance the project’s performance Opportunity to make recommendations that enhance the projects Life Cycle

Lessons Learned Propose items from previous Lessons Learned studies Implement this service with new Technology

Earned Value Management Embedded in BIM 4D Ability to see progress through modeling Schedule can be cost loaded

Facilities Condition Assessment Rehabilitation Projects Tax Credit Calculations Tax Credit Verification

MBP and Value Engineering MBP offers Value Engineering Services Advantages Various Discipline Expertise and Certifications Industry Cost Estimating Expertise Industry Time Impact Expertise Disadvantages No Certified Value Specialist (CVS) New Technology

MBP and Value Engineering Future Opportunities TM’s become CVS certified Participate on Design Build Teams in a CM role during Pre-construction Stay up with Technology Incorporate our Lessons Learned Program with vendors.

Technology and Value Engineering BIM Building Information Modeling 4D Technology Energy and Environmental Analysis Cost Estimate Interim estimates are performed Alternative methods can be applied real time during design quickly and efficiently. CPM Schedule Time impact can be identified early in the design process.

The owner and design team determine which VE items get incorporated. Conclusion The owner and design team determine which VE items get incorporated.

Questions & Discussion Thank You! Questions & Discussion Gene Layne, CCM MBP Project Manager 804-330-4875 glayne@mbpce.com