K. Grogg University of Wisconsin RCT shift report 8 – 15 October 2008 K. Grogg Next shifter: C. Lazaridis 17 March 2016 1 RCT shift report.

Slides:



Advertisements
Similar presentations
Configuring APACS & AAN Controllers
Advertisements

GCT Software Jim Brooke GCT ESR, 7 th November 2006.
Trigger Validation Board PVSS panels tutorial 1. TVB components 2 FPGA controls :  FPGA HCAL hadron trigger  FPGA EPPI electron, photon, pi0, Global.
L2 Online Reinhard Schwienhorst DAQ shifters meeting, 03/12/02.
GREN Analysis Notes Jessica Leonard 7 Feb Issue: HCAL Timing ● Depending on run, half to most of data not in correct time sample (“sample of interest”)
David Emschermann DCS Workshop – PI Heidelberg – 22/01/2007 How to power up the TRD David Emschermann Physikalisches Institut Universität Heidelberg updated.
HCAL Trigger Primitive Generator Tullio Grassi University of Maryland September 2004.
06-Dec-2004 HCAL TriDAS 1 TriDAS Status HF Luminosity HF Trigger Slicing.
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS et Université Paris-Sud 11), Orsay, France Olivier Callot 21 September 2005 Calorimeter Configuration.
Wesley SmithAug. 17, 2010 Trigger Budget Review: Travel & COLA - 1 US CMS FY 2011 Budget Review Trigger Travel & COLA Wesley Smith Aug. 17, 2010 Outline.
RUN COORDINATOR’S REPORT March 2006 Thomas Schörner-Sadenius Universität Hamburg ZEUS Monday Meeting DESY, 27. März 2006.
Performance Tests and Control for the TRD-HV A. Markouizos, A. Petridis, S. Potirakis, M. Tsilis, M. Vassiliou Athens University ALICE DCS Workshop CERN.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
DAQ MICO Report Online Monitoring: –Status All histograms are now implemented Still not fully online –Only monitoring from data file (slightly offline,
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
S. Dasu, University of Wisconsin September Regional Calorimeter Trigger Outline: Status of Prototypes Plans for Production Testing Plans for Integration,
1 Outline Firmware upgrade of the HV_LED_DAC boards. HV Status Bits board. Status of the board integration into the LHCb TFC system. CALO HV system and.
1 xCAL monitoring Yu. Guz, IHEP, Protvino I.Machikhiliyan, ITEP, Moscow.
W. Smith, DOE/NSF Review, August, 2006 CMS Trigger - 1 SORT ASICs (w/heat sinks) EISO Bar Code Input DC-DC Converters Clock delay adjust Clock Input Oscillator.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Muon commissioning status and plans G.P. C. De Plano.
PDT’s  Control Board DSP Software (Sten,HH) u Updated so as to include the wire-length in the module data  Readout u All 6 crates in global run. u 90/94.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
HCAL DPG Status1 Olga Kodolova / Frank Chlebana HCAL DPG Status Olga Kodolova for the HCAL DPG October 20, 2011.
28 July 2006 CERN REU Status Report 1 Lindsey Gray, University of Florida RCT Trigger Supervisor and Database Project Status Lindsey Gray Advisors: Dr.
4 Dec 2008G. Rakness (UCLA)1 Online Software Updates and RPC data in the RAT …including Pad Bit Mapping and Efficiency… Greg Rakness University of California,
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
1 EMC Trigger Summery from RunII and discussion for RunIII H.Torii, Kyoto Univ. ERT Lvl-1 meeting.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
26/11/02CROP meeting-Nicolas Dumont Dayot 1 CROP (Crate Read Out Processor)  Specifications.  Topology.  Error detection-correction.  Treatment (ECAL/HCAL.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
STAR Analysis Meeting, BNL – oct 2002 Alexandre A. P. Suaide Wayne State University Slide 1 EMC update Status of EMC analysis –Calibration –Transverse.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
W. Smith, U. Wisconsin, LHC Electronics Conference, October 1, 2003 CMS Calorimeter Regional Trigger - 1 Full Crate Test of the CMS Regional Calorimeter.
Trigger Tests Patrick Robbe, LAL Orsay, 8 Feb 2012.
Yu. Guz 21/04/20061 Database usage by calorimeters Yu. Guz IHEP Protvino.
Common test for L0 calorimeter electronics (2 nd campaign) 4 April 2007 Speaker : Eric Conte (LPC)
Laboratoire de l’Accélérateur Linéaire (IN2P3-CNRS) Orsay, France Olivier Callot 4 July 2002 The L0 Calorimeter Trigger Basic principles Overall organization.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
LHC CMS Detector Upgrade Project RCT/CTP7 Readout Isobel Ojalvo, U. Wisconsin Level-1 Trigger Meeting June 4, June 2015, Isobel Ojalvo Trigger Meeting:
1 Status of Validation Board, Selection Board and L0DU Patrick Robbe, LAL Orsay, 19 Dec 2006.
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL/HCAL sub-detectors.  Introduction.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
CMS Trigger Upgrades Phase-I (1) Muon Trigger Upgrades: – CSCTF (CSC TrackFinder) – MPC (Muon Port Card) Calorimeter Trigger Upgrades: – HCAL TPG – Calorimeter.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
Manqi Ruan Discussing & Support: Roman, Francois, Vincent, Supervisor: Z. ZHANG (LAL) & Y. GAO (Tsinghua)) DQ Check for CERN Test.
S. Dasu, University of Wisconsin February Calorimeter Trigger for Super LHC Electrons, Photons,  -jets, Jets, Missing E T Current Algorithms.
1 J. Varela, CMS Trigger, RT09, Beijing, May 2009 J. Varela IST/LIP Lisbon CMS Trigger Project Manager 16 th IEEE NPSS Real Time Conference May 10-15,
Recent Gain Changes C.Woody HBD Meeting March 23, 2010.
Sridhara Dasu115 April 2002 L1CaloTrigger Algorithms Sridhara Dasu University of Wisconsin Algorithms: Details, Updates and Simulation - 2 x cm -2.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
CP Athena Monitoring Status as of 20/05/08 Revised directory structure (again!). Phi scale configurable in degrees, radians or channels. Existing plots.
1 L0Calo ECS. 2 Introduction L0Calo consists in several boards: –In the cavern: Front-End Boards, Trigger Validation Boards and SPD Multiplicity Boards.
21 November 2003Jacques Lefrancois1 HOSTING ELECTRONICS AND CONNECTIVITY Role of calorimeter system: Level 0 trigger +  reconstruction +e/  id. Level.
The LHCb Calorimeter Triggers LAL Orsay and INFN Bologna.
CLAS12 DAQ & Trigger Status
Online Database Status
HCAL Configuration Issues
SLB Synchronization in H4 Beam (LIP - Lisbon)
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
Trigger M&O Progress -- Florida, Rice, UCLA, Wisconsin
The LHCb L0 Calorimeter Trigger
Pierluigi Paolucci & Giovanni Polese
LIP and the CMS Trigger Upgrade On behalf of the LIP CMS Group
Presentation transcript:

K. Grogg University of Wisconsin RCT shift report 8 – 15 October 2008 K. Grogg Next shifter: C. Lazaridis 17 March RCT shift report

K. Grogg University of Wisconsin 18-crate pattern test n Pattern Test performed on Oct. 9 u Known problems l Crate 5, card 3, 128 bit stuck: not in our hardware; likely a cable / connection problem l Crate 12 still needs to be investigated; possibly electron ordering problem l Crate 7 still has a problem sharing of the fg/HoE bit of card 6, region 1 with Crate 8 cards 4 and 6 u New problems l Crate 4 Isolated electrons have the 2 bit stuck low for all cards (this has been seen before) l Region sum of Crate 2, card 3, region 1 had mismatched ranks for one test è Looks like the 256 and 512 bits were switched n No chance to run pattern tests yet this week because of global run 17 March 2016 RCT shift report 2

K. Grogg University of Wisconsin DCS summary n Racks have been steady all week u New DCS software version has improved the regular archiving of data points n Tuesday and Wednesday RMCs went offline (could still ping, but no information in PVSS) 17 March 2016 RCT shift report 3

K. Grogg University of Wisconsin Shift phone n No shift phone calls this week 17 March 2016 RCT shift report 4

K. Grogg University of Wisconsin Data quality monitoring Run 64758Run Lookup tablesPhysics Electron candidatesECAL Region sumsECAL + HCAL # of events March 2016 RCT shift report 5 When running, got error messages “Invalid HTR data observed on spigot X of DCC with source id XXX” Other DQMed runs with similar results: 64756, 64768, 65948

K. Grogg University of Wisconsin Run 64741: ECAL + HCAL n Used physics LUTs n Electron candidates from ECAL n Region sums from ECAL + HCAL n Run over 30,000 events 17 March 2016 RCT shift report 6

K. Grogg University of Wisconsin Nonisolated electron efficiencies n Efficiency looks good n Inefficiency—a few channels which are masked in hardware but not in emulator 17 March 2016 RCT shift report 7 Run 64741

K. Grogg University of Wisconsin Region efficiencies n Very good agreement between nonisolated electrons and region sums 17 March 2016 RCT shift report 8 Run 64741

K. Grogg University of Wisconsin Region overefficiency n Understood—losing ~ 30% of HCAL TPGs; causes large overefficiency 17 March 2016 RCT shift report 9 Run 64741

K. Grogg University of Wisconsin Run 64903: ECAL + HCAL n Used physics LUTs n Electron candidates from ECAL n Region sums from ECAL + HCAL n Run over 39,000 events 17 March 2016 RCT shift report 10

K. Grogg University of Wisconsin Nonisolated electron efficiencies n Reasonable efficiency, but very low statistics (only ~80 ECAL TPGs) n Overefficiency from same effect as last run 17 March 2016 RCT shift report 11 Run 64903

K. Grogg University of Wisconsin Region efficiencies n New effect—region geometry is correct, but energies between data and emulator do not agree for η = 6, 15 n Same RCT configuration key as for previous run 17 March 2016 RCT shift report 12 Run 64903