Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region.

Slides:



Advertisements
Similar presentations
Projects in the Forest Grove area Presented by: David Kim, ODOT Metro West Area Manager August 13, 2012.
Advertisements

SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Great Western Corridor Feasibility Study
I-96 Reconstruction/Bridge Repair Project City of Livonia and Redford Township Wayne County May 10, 2013 Association of the Council of Western Wayne Yankee.
State Project No /195 Rehabilitation of Bridge Nos and I-84 over Marion Ave Southington, Connecticut Rehabilitation of Bridge Nos.
6TH ANNUAL CONFERENCE.
County of Fairfax, Virginia Sully District Council Meeting November 19, 2014.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
West Contra Costa Unified School District
WELCOME! October 28, 2013 ODOT District 1 & District 2.
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
 Narrow roadway, with no shoulders  Poor pavement condition  AADT 405/150 – Low Traffic Volume  Ideal candidate for P.I.P.
August 18, 2011 State Route 99 Auxiliary Lanes Project Route 32 to East 1st Avenue.
Santa Maria River Bridges Widening. Project Location.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Transportation Infrastructure Bond Corridor Mobility Improvement Account.
ROUTE 7 TRAFFIC FLOW IMPROVEMENTS POTOMAC VIEW ROAD TO AUGUSTA DRIVE LOUDOUN COUNTY DEPARTMENT OF CONSTRUCTION AND WASTE MANAGEMENT A. MORTON THOMAS &
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Clinton Street Bridge over the Maumee River ODOT Project DEF May 14, 2015 Public Meeting.
Route CC bridge replacement over Caulk’s Creek. What is the problem? Large debris consistently collects on the upstream end of the bridge. This causes.
Transpo 2012 The Future of Traffic Incident Management, October 30, 2012 Javier Rodriguez, P.E., ITS Operations Engineer Joe Snyder, TMC Manager FDOT District.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
75 Express Lanes Project From NW 170 Street to I-595 TIM Meeting Wednesday, September 2.
Presenter: Dewayne Johnson, P.E. SE Region Director/Bureau of Traffic Operations Director.
Interstate 95 Corridor Improvement Program June 20, 2012.
WELCOME! July 31, 2012 ODOT District July 31, 2012 PURPOSE OF TONIGHT’S MEETING Introduce the project –Reconstruct I-75.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Project Update: Airport Freeway, I-820 and I-35W Townhall Meeting for State Representatives Stephanie Klick and Jonathan Stickland Monday, May 12.
AWARD OF CONTRACT FOR CONSTRUCTION OF CALIFORNIA OAKS ROAD AT I-15 INTERCHANGE CIP NO City Council Meeting January 18, 2011.
STA Safety Project PID #76439 December 12, 2006.
Fang Yuan, PhD. PE. SEPTEMBER PAPAL VISIT July 1, 2015 Potential Traffic Impacts.
Regional Transportation Committee (RTC) 10-Year Project Milestone Policy Transportation and Trinity River Project Committee October 26, 2015.
1 Destination 2030 Kern Regional Transportation Needs * Information provided by Kern Council of Governments.
County of Fairfax, Virginia Department of Transportation Fairfax County Parkway Corridor Study Board of Supervisors Transportation Committee December 1,
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
Madison Avenue Reconstruction Department of Planning and Development.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
MED SR 18 Corridor Project MED PID October 13, 2015.
I-465 at I-65 Interchange Modification Public Meeting 6:00pm Monday, October 1, 2012 South Grove Intermediate School Beech Grove, Indiana.
I-80 Robb Drive to Vista Boulevard Design-Build Project I-80 Robb Drive to Vista Boulevard Design-Build Project.
I-35W/Highway 62 Crosstown Commons Reconstruction Nathan Aul, Bob Krussow, and Michael Martin.
U.S. ROUTE 202 – SECTION 300 IMPROVEMENT PROJECT East Whiteland Township – Tredyffrin Township Chester County TMACC Information Session January 24, 2011.
DFW Connector Project Main Street Bridge Starting in March 2010 Subject to Change.
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
Major MnDOT Highway Improvement Projects West Metro
Thank you for bringing us to where we are
Highway 110 Project Update
DICKINSON AVENUE RECONSTRUCTION
Project Status Update I-680 Southbound HOV Gap Closure Project Environmental Phase September 2011 PARSONS.
Overview Project Limits Improvements Cost Anticipated Schedule
Highway 14 – Owatonna to Dodge Center District 6 Update
Overview Project Limits Improvements Cost Anticipated Schedule
From North of River Road to North of State Road 681
Malibu Canyon Pole Replacement Project Information
Highway 169 Bridge Replacement & Pavement Resurfacing
I-69 Southwest/I-610 West Loop Interchange Reconstruction
Issaquah-Fall City Road
SE 12th Street Roadway Improvements February 8, 2005.
PROJ. 566(17) LOR PID MAJOR WIDENING
TRANSPORTATION SUMMIT
Harbour Island Force Main Replacement
Commissioners Presentation
PROJECT 3004(18) NORTH CARPENTER ROAD MAJOR RECONSTRUCTION
Metropolitan District | mndot.gov
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Grand Valley Metropolitan Council March 3, 2016 Erick Kind Region Engineer MDOT-Grand Region

Grand Region Boundary o October 1, 2015 o 13 Counties o o 1.5 Million People o 4300 lane miles

US-131 Southbound Weave/Merge Lane, Pavement & Bridge Repairs Project Summary  Project will address road and bridge conditions, along congestion with CMAQ funding  US-131 Concrete Pavement Repairs  Pearl Street to Ann Street (Southbound)  M-11 (28 th Street) to Wealthy Street (North and Southbound)  Bridge Widening and Rehabilitation  US-131 over Richmond Street and Indian Mill Creek (Southbound)  Construct Southbound Weave/Merge Lane  Connect Ann Street On-Ramp to Leonard Street Off-Ramp

US-131 Southbound Weave/Merge Lane, Pavement & Bridge Repairs  Construction Cost: $7.8 Million  Schedule: * Off line foundation work underway  Project Description:  Concrete Pavement Repairs  Pearl to Ann Street (Southbound)  Bridge Widening  US-131 over Richmond and Indian Mill Creek.  Weave/Merge Lane  To Connect Ann to Leonard  Traffic Volume:  53,000 South of Leonard (SB)  8% Commercial  48,000 Between Leonard/Ann (SB) LettingStartCompletion December 2015February 2016*October 2016

Local Agency Project Coordination

US-131 Traffic Control Plan (TCP)  Maximize Work Zone Safety & Minimize Mobility Impacts  Richmond Street Eastbound Directional Detour; Westbound maintained  Maintain Two Lanes On US-131 Southbound – most weekdays  Maintain One Lane On US-131 Southbound US-131 Southbound Traffic During Designated Night and Weekend Closures  US-131 NB & SB: M-11 to Wealthy Street Night and Weekend lane closures  PCMS and DMS Message boards will be utilized  Lane Closure Updates, (List Serve, LCAR), Project Website 

Project Traffic Control Summary All lanes on US-131 will be open until April 23 SB US-131 single lane closure beginning April 23 extending through September SB US-131 double lane closure on weeknight and weekends Richmond Street will be open to both directions of traffic until mid-March Richmond Street will be opened for SB-WB traffic. EB-NB traffic will be detoured starting mid-March

Ramp Closure Schedules The following ramps will be closed during different stages of the project TBD:  Turner Avenue (just north of Ann Street) ramp to southbound US-131  Southbound US-131 ramp to Leonard Street  Eastbound I-196 ramp to southbound US-131  Southbound US-131 ramp to Pearl Street

THANK YOU!