1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities.

Slides:



Advertisements
Similar presentations
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Beneficial Occupancy Readiness Evaluation Plan Update Brian Heneveld, P.E., CIH NSLS-II BORE Coordinator Conventional.
Advertisements

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Electrical Utility Service Dennis Danseglio, P.E. Project Engineer.
1 BROOKHAVEN SCIENCE ASSOCIATES Central Chilled Water Facility – Phase II Alan Raphael MPO Project Manager CFAC Committee Review November 9, 2009 Sub-basement/Pipe.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Authorization Basis Steve Hoey, NSLS-II ESH Manager Project Advisory Committee February 8-9, 2011.
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
David Saenz Far Experimental Hall - June 17, Far Experimental Hall - Hutches Scope Budget Schedule.
Bob Law FAC Oct 24, Sector 20 Project Overview Sector 20 Site Plan Description Organizational Chart Schedule Cost.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
1 BROOKHAVEN SCIENCE ASSOCIATES Nick Simos NSLS2 Ground Motion and Vibration Studies.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities LEED-ESH-Facility Utilization May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Laboratory Office Building (LOB) Design Ove Dyling Assistant Director for Design Management CFAC Review November 9 – 10,
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Update Marty Fallier Director for Conventional Facilities NSLS-II PAC Meeting May 24, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES LOB - Ring Building Construction Coordination Michael P. Bromfield Construction Engineer NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Authorization Basis Plan Steven Hoey, ESH Manager NSLS-II Project Advisory Committee Meeting December 10 – 11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Construction Management Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II EFAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities & Beam Stability Marty Fallier Director for Conventional Facilities NSLS-II Beam Stability Workshop.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Steve Sawch Assistant Director for Construction Management NSLS-II Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Plans for LOBs and Site Master Plan Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CF Role in NSLS-II Operations Marty Fallier Conventional Facilities Advisory Committee Review October 5-6, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Construction Status Michael P. Bromfield Construction Engineer NSLS II Conventional Facilities Advisory Committee.
BROOKHAVEN SCIENCE ASSOCIATES National Synchrotron Light Source II Project Management Jim Yeck Deputy Director (Project Management)
LCC Linear Collider Collaboratio ILC - CFS 12 November 2013 LCWS13 Tokyo University 1 Site-specific CF design from TDR LCWS13, 12 November 2013 Atsushi.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Chris Channing P.E. Sr Project Engineer NSLS-II Conventional Facilities - Thermal Stability May 8, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II ASAC Review Conventional Facilities Briefing Marty Fallier Director for Conventional Facilities National Synchrotron.
Upgraded Injector Test Facility 2015 Users Group Board of Directors Update Akers/Experimental Nuclear PhysicsJanuary 13, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Martin Fallier Director, Conventional Facilities Conventional Facilities Value and Risk Management May 8, 2008.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Status Update Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11,
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities CFAC Cost Review May 9, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Transition to Installation Erik Johnson ASD Deputy Director and Interface Manager NSLS-II CFAC Meeting November 9-10, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Baseline Jim Yeck NSLS-II Deputy Project Director NSLS-II PAC Meeting November 20, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review – Title II Design Status Ove Dyling Assistant Director for Design Conventional Facilities NSLS-II Conventional.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Update Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier Director for Conventional Facilities NSLS-II Conventional Facilities Update May 8, 2007.
MEIC Collaboration Meeting Site Development - Rebecca YaskyOctober 6, 2015.
1 BROOKHAVEN SCIENCE ASSOCIATES CCW Plant Expansion & CCW Piping Thomas F. Joos, PE Lead Civil/Structural Engineer CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Method of Accomplishment Marty Fallier Director for Conventional Facilities.
1 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Overview Marty Fallier, Conventional Facilities Director ASAC Meeting July 18, 2008.
TDR Status of Asian CFS Team Part II: The ILC Baseline Reference Ch.SectionSubsectionsAuthor1 st draft 112: Asian Region Siting Studies Overview Location.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Steve Dierker Director, NSLS-II Conventional Facilities Division NSLS-II User Workshop July 17,
MINU GPP WBS 1. Main Injector Neutrino Upgrades - Infrastructure Project Dixon Bogert APD Department Report – March 7, 2007 Russ Alber - FESS Engineering.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Overview Satoshi Ozaki Director, Accelerator Systems Division NSLS-II Project March 27, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES EFAC Review Conventional Facilities Update Marty Fallier Director for Conventional Facilities May 10, 2007.
1 BROOKHAVEN SCIENCE ASSOCIATES Electrical Procurements Thomas C. Nehring, PE Lead Electrical Engineer Conventional Facilities Advisory Committee - Review.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Briefing Chilled Water and Temperature Stability Chris Channing Sr. Project.
ILC Test Facility at New Muon Lab (NML) S. Nagaitsev Fermilab April 16, 2007.
Consolidation activities for GS-SE Luigi Scibile GS-SE Accelerator Consolidation Workshop, EDMS:
2005/06/22 ALBA Building Project David Carles Engineering Services Division - CELLS.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II Stability Workshop Conventional Facilities Temperature Stability Chris Channing P.E. Sr. Project Engineer National.
1 BROOKHAVEN SCIENCE ASSOCIATES CFAC Review Marty Fallier NSLS-II Conventional Facilities Schedule Review December 13, 2006.
1 BROOKHAVEN SCIENCE ASSOCIATES Accelerator Systems Installation F. Willeke, ASD Director 6 th ASAC October 22-23, 2009.
1 BROOKHAVEN SCIENCE ASSOCIATES CF Coordination with Technical Divisions Ove Dyling Conventional Facilities Advisory Committee Review October 5-6, 2010.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Status Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Accelerator.
1 BROOKHAVEN SCIENCE ASSOCIATES NSLS-II Project Overview Steve Dierker Associate Laboratory Director for Light Sources NSLS-II Project Director Experimental.
Conventional Facilities integration: Approach and Issues Daniel Piso Fernández WP Leader (WP13 Conventional Facilities Integration Support) November 5,
1 BROOKHAVEN SCIENCE ASSOCIATES Beam Stability Overview NSLS-II CFAC Meeting May 8, 2007 S. Krinsky.
Green Labs Symposium | March 15, 2016 Travis Wanat, Senior project manager Department of Facilities Efficient building design and operation Fueling high.
1 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities Schedule Steve Sawch Asst. Director, Construction Management CF Advisory Committee Review of the.
E- source kick-off meeting e- Source RDR- Conventional Facility & Siting Overview Fred Asiri/SLAC.
Conventional Facilities and Siting Global Group (ARCFS)
CBETA Technical Review
Conventional Facility & Siting (CF&S) Overview for the Positron Source
CF Organization & Schedule
Maintenance at ALBA facility: Strategy for the conventional services
Far Experimental Hall Hutches Civil Construction
Far Experimental Hall - Hutches
LCLS Injector System Overview D. H
CF Scope, Management & Organization
Presentation transcript:

1 BROOKHAVEN SCIENCE ASSOCIATES NSLS – II CFAC Review Conventional Facilities Overview Scope & Schedule Marty Fallier Director for Conventional Facilities National Synchrotron Light Source – II Project October 18, 2006

2 BROOKHAVEN SCIENCE ASSOCIATES Outline Conventional Facilities Scope ◦Facility Overview - CF WBS - Facility Program ◦Ring Building ◦Central Lab Office Building ◦Lab Office Building(s) ◦Utilities Schedule Risks and Challenges

3 BROOKHAVEN SCIENCE ASSOCIATES NSLS II Facility Overview

4 BROOKHAVEN SCIENCE ASSOCIATES NSLS LOB Typ 4 RF-LINAC AREA Service Bldg Typ 4 CFN Ring Bldg Future JPsi Future Guest House Conf. Center Underpass Loading CLOB NSLS II Site Plan

5 BROOKHAVEN SCIENCE ASSOCIATES Conventional Facilities WBS

6 BROOKHAVEN SCIENCE ASSOCIATES Building Program

7 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Concept Divided into 5 clusters Service Bldg supports all services within the cluster Six sectors/Cluster CLOB & Service Bldgs contain all Accelerator systems Ring, CLOB, LOB 1 & service bldgs are base scope LOB ’ s 2,3,4 can be added as needed w/o interruption Area of initial Operations

8 BROOKHAVEN SCIENCE ASSOCIATES Ring Building Section

9 BROOKHAVEN SCIENCE ASSOCIATES Experimental Floor Arrangement

10 BROOKHAVEN SCIENCE ASSOCIATES Tunnel Design Roof and wall thicknesses generally driven by shielding criteria except inner wall in area of berm (just structural) Outer wall (ratchet wall) is HD concrete During T-I will study whether precast or poured in place provides best balance of technical and cost performance Tunnel floor thickness driven primarily by vibration criteria Will do modeling to arrive at optimal thickness and section shape Rigidly connected to exp. floor to create monolithic floor Penetrations from above for power and cooling water Penetrations from sidewall for HVAC Supply and Return

11 BROOKHAVEN SCIENCE ASSOCIATES Tunnel Access Egress for life safety achieved by exits at each service building location Large shielded doors for equipment access provided at Service buildings for tunnel entry Mandoors and labyrinth provided at each Service building Vehicle ramp to roll-up door at 2 nd floor of each Service Bldg provides equipment access to electrical mezzanine at top of tunnel RF & LINAC areas integrated with CLOB structure have similar access as Service Bldgs

12 BROOKHAVEN SCIENCE ASSOCIATES Service Bldgs

13 BROOKHAVEN SCIENCE ASSOCIATES CLOB Features Space for 190 Offices, 8 labs Nominally 30 User Offices, 5 User labs from the total Possible 400 seat Conference Center addition w/ vendor area and three breakout rooms Lobby and User Reception area 2 nd floor viewing gallery overlooking experimental floor Bridge to electrical mezzanine and control room & RF/LINAC areas Close Proximity to future: JPSI Building Guest house

14 BROOKHAVEN SCIENCE ASSOCIATES 1st Floor Plan – CLOB

15 BROOKHAVEN SCIENCE ASSOCIATES 2 nd Floor Plan - CLOB

16 BROOKHAVEN SCIENCE ASSOCIATES 3rd Floor Plan – CLOB

17 BROOKHAVEN SCIENCE ASSOCIATES Section at CLOB

18 BROOKHAVEN SCIENCE ASSOCIATES CLOB & Ring Building

19 BROOKHAVEN SCIENCE ASSOCIATES LOB Features Modular design – can be added when needed without interrupting operation 11,000 SF each – Serves six sectors 30 offices w/ conference space, interaction areas, lavs, showers 5 labs intended for shared use Shipping/Receiving/Storage area & chemical storage area Potential for expansion for more offices if needed Egress provided for personnel and large items at each LOB Loading area with exterior roll-up door Roll-up door from each lab onto the experimental floor Designed to minimize impacts to future long beamlines

20 BROOKHAVEN SCIENCE ASSOCIATES Lab – Office Building

21 BROOKHAVEN SCIENCE ASSOCIATES Lab-Office Building

22 BROOKHAVEN SCIENCE ASSOCIATES Utility Support Utilities run underground in center of ring and distributed to five service bldgs (one in CLOB RF/LINAC area) Minimizes pipe runs and pipe size in bldg proper Only needed service piping will be run in experimental area Minimizes potential noise and vibration impacts Services provided at each Beamline include: Electric Power Panel at Ratchet Wall, 75-95kW/Cell, 120/208V Cooling Water, HVAC Supply Air, Exhaust Compressed Air, LN 2, GN 2 DI Water (Copper and Aluminum systems) by Accelerator Group

23 BROOKHAVEN SCIENCE ASSOCIATES Utility Support

24 BROOKHAVEN SCIENCE ASSOCIATES Utility Support Utilities run underground in center of ring and distributed to five service bldgs (one in CLOB RF/LINAC area) Minimizes pipe runs and pipe size in bldg proper Minimizes potential noise and vibration impacts Mechanical Utilities include: Chilled water from expansion of Central CHW Plant Tower water from process cooling water tower Steam & condensate from Central Steam System Potable water, compressed air, sanitary to existing mains Electrical Utilities distributed via substation and load center at each services bldg Communication/Data via underground BNL F/O network

25 BROOKHAVEN SCIENCE ASSOCIATES Utility Support

26 BROOKHAVEN SCIENCE ASSOCIATES Schedule Key schedule objective – Enable start of accelerator installation March 2010 CF is critical path until the main bldg spaces are turned over for accelerator installation Cluster areas of Ring bldg to be released for BO in phases Key durations: Title I Design – 9 months Title II Design – 10 months Site preparation – 6 months Main bldg contract bid & award – 6 months Main bldg contract duration 34 months

27 BROOKHAVEN SCIENCE ASSOCIATES Schedule Title I Design CD-2 Title II Design CD-3 Site Preparation Const. Pre-cast Shield Wall Const. Ring Bldg/CLOB/LOB Bid & Award Construction 1st Cluster ready for Accel. installation Ring Bldg BO CHW Plant Expansion Mech & Elect Utilities Integrated Ctrl & Comm. Standard Equipment Commissioning Activity FY07FY08FY09FY010FY11FY12 FY13

28 BROOKHAVEN SCIENCE ASSOCIATES Risks & Challenges Technical Challenges Constructing massive concrete tunnel with reasonable economy Achieving structural stability Minimizing differential settlement Vibration mitigation Achieving thermal stability – Tight temperature constraints for tunnel Assuring interior/exterior thermal gradients don ’ t affect beam Making tunnel available for accelerator installation in phases Risks Cost sensitivity of achieving all of the above Volatile material/construction markets