LUAS Cross City Brendan O’Brien Roads & Traffic Department.

Slides:



Advertisements
Similar presentations
A34 Corridor Strategy Strategic Route Improvements 25 th November 2004 working together with.
Advertisements

Limerick City Green Routes Corridor Selection Study Presentation to Limerick City Council 14 th February 2008.
Consultation on key routes which run parallel to Oxford Road corridor September 2012 Bus priority package.
CityCo, Piccadilly Hoteliers Forum
January 8, 2014 FMATS College Road Corridor Study FMATS Technical Committee Update.
Harold Park Tram Sheds Development
LUAS CROSS CITY UTILITY WORKS Jim Kilfeather, Project Manager Gráinne Mackin, Director of Communications.
9/7/2012 MBS UU.
Luas Cross City Main Infrastructure Works April 2015.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
1 Think Big – Build Small Presented to White Flint Sector Plan Advisory Committee Nov, 2007 Presented by Natalie Goldberg.
5/19/20151 Segoe Road Proposed Remarking Plan Scott Langer Traffic Engineer City of Madison Traffic Engineering Division Madison, Wisconsin.
Presentation to the AMP Leadership Team Moving forward. April 17, 2013.
Urban Land Use (chapter 21)
Citylink A Partnership Between The Coeur d’Alene Tribe, The State Of Idaho, The KMPO, and Kootenai County.
Tour de France 2014 Chris Harrison. Overview Monday 7 th July 2014 Stage 3: Cambridge to London 159KM Responsibilities ASO event organiser TfL event management.
Route 109 Bridge Reconstruction at Wood Road The Missouri Department of Transportation.
VTA Light Rail System and Safety Enhancements MTC Railroad Crossing Seminar May, 21, 2008.
A Brief Comparison on Traffic System Between London and Shanghai Allen Liu, Shanghai Feb. 16 th 2012.
Center City Access Strategy A Transportation Vision for Growth and Access.
Paul Roberts – TIF Technical Manager Presentation to the TPS – 3 June 2009.
Challenge the future Delft University of Technology Project Waalbrug Improving transport accessibility in Nijmegen TIL5050 – Bernat Goni, Vikash Mohan,
Bicycle Priority Lanes, Bike Lanes in Commercial Areas, & Queuing at Red Lights: Harmony (?) between Desired Behavior, Design, and Actual Behavior Peter.
CENTRAL ACCESS SCHEME FOR THE CITY OF KILKENNY Traffic Considerations The feed back resulting from public consultation did cause us to revisit the traffic.
Joint Transport Forum I Rapid Transit Line 2 Our Future Transport I West of England Sub Region.
Introduction Nablus is the largest city in the West Bank after Jerusalem. 150,000 inhabitants live in Nablus. Nablus has the largest university in the.
TRANSPORT INNOVATION FUND Stephen McFarlane Regional & Local Transport Delivery - DfT.
London 2012 Media Transport Hub – Bloomsbury 26 th October 2011 Ingunn Tilleraas– LOCOG Lead Bus Systems Manager.
Regional Centre Transport Vision 2013 Presentation to Salford City Council Members - 19 August 2008.
PREPOSITIONS LM WEST. on days of the week attached for a place with a river being on a surface for a certain side (left, right) for a floor in a house.
Central London Congestion Charging David Hutchinson GREATER LONDON AUTHORITY International Union of Air Pollution Prevention and Environmental Protection.
Public Consultation A RE YENG REVIEW LINE 2B 13 August 2015.
BRT in India Delhi Case study. What is Delhi HCBS Delhi HCBS is not a BRT system. It is primarily a road infrastructure project. It was not conceived.
Arriva in Southend Kevin Hawkins Commercial Director.
Wolverhampton City Centre Metro Extension. Introduction  Background New Tram and Depot Extension Birmingham City Centre Extension Original Wolverhampton.
Official Plan Zoning Bylaw Land Uses
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Dún Laoghaire Area Committee Meeting 8 th April 2015 Non Statutory Public Consultation Proposed Road Safety Improvement Works at Schools on Cross Avenue.
City of Portland SW 6 th Avenue & Jackson Street Intersection Solution Study 1 Presented By: Josh Crain Robert Acevedo Xiaowei Wu Chengxin Dai.
Steve Beverley SUSTAINABLE TRAVEL MANAGER METROCENTRE, GATESHEAD.
Introduction to Transport
Transport Update Chris Carter Transport Strategy Manager.
Roads & Traffic Department College Green Public Transport Priority measure.
Putting Luas Cross City in context - Public Transport and Sustainable Measures in Dublin Dublin City Council 21 st March 2013 Gerry Murphy.
Transportation in Newcastle City Centre Outline: Policy background Approach to Development Planning Performance Indicators Moving Ahead.
NCT buses to Trinity School 2011/12 All Nottingham City Council funded dedicated school buses are withdrawn from the end of the 2010/11 academic year.
The Main Street Bike Lane Project LADOT Bike Program.
ACTIVE TRANSPORTATION Saint John. ATSJ VISION A City that supports a high quality of life where calm and friendly streets encourage the connection between.
Junctions of Holloway Rd with Drayton Park, Liverpool Road & Palmer Place Holloway Road Palmer Place Liverpool Road Drayton Park N current situation.
Oxfordshire County Council has exciting plans to transform the centre of Oxford’s transport and pedestrian experience.
Portland State University 11 By Maisha Mahmud Li Huan Evaluation Of SCATS Adaptive Traffic Signal Control System.
1 Weekly Supervisor Meeting – Project Waalbrug Project Waalbrug Improving transport accessibility in Nijmegen Bernat Goni, Vikash Mohan, Arjen van Diepen,
Northside Transportation Network Community Meeting November 17 th, 2010 UROC.
I-15 Express Lanes Project January 2012 I-15 Express Lanes Project January 2012.
Submission Document went to cabinet … Planning for the Future Core Strategy and Urban Core Plan (the Plan) is a key planning document and sets out the.
Cycling Scotland Presentation
Garrett Bolella, Tim Chan, Greg Khirallah, Dave Miele, Becca Ruitto.
A64 (T) Hopgrove Roundabout Improvements. Background The roundabouts at Hopgrove are located to the north east of the City of York and form a junction.
30 Stockton Transit Priority Project Chestnut November 10, 2015 Marina Community Association.
FLAG OF SCOTLAND coat of arms of Scotland.
SMART URBAN FUTURES PRESENTATION
A Bus Corridor for George Street in New Brunswick
Changes in the CBD Match the description to the explanation
Community Information Session
SMART URBAN FUTURES PRESENTATION
Your Neighbourhood Consultation on changes to local services
Urban Land Use (chapter 21)
M14A/D Select Bus Service
WELCOMES YOU TO THE COMMUNITY OPEN HOUSE OCTOBER 2018.
GCP Transport Update Meeting for: M11 J11 Park & Ride Engagement Group
Presentation transcript:

LUAS Cross City Brendan O’Brien Roads & Traffic Department

Issues Six Major Car parks Affected by the LUAS Construction and Operation. Parnell Street Reduced from Four Lanes to Two. Access Arrangement for Ilac needs to be in place. New Egress arrangements from Jervis Street Car Parks and Imax Car parks needs to planned. These Car Parks provide over 3,000 Car Spaces for Shoppers.

Removal of Lane to accommodate Luas Stop Shared running around Trinity College :- Operational issues College Green

Highest capacity Public Transport link in the Country 400 Buses an Hour Peak High numbers of Cyclists and Taxis Very Busy at night time especially Weekends Removal of one Lane during Construction. Outside Bus Corridor Hours 2000 vehs Hour Possible extension of Bus Corridor Hours

Two Way LUAS Operation with one shared lane past the Provost House. In Operation Public Transport only Lr Grafton Street

For Periods of Construction this is one way from Grafton Street to Dawson Street Only. Nassau Street Dawson Street

During Construction number of Lanes reduced need to protect Buses. High Volume of Vehicles on Dawson Street going to Merrion Row or Westland Row. Dawson Street

Kildare Street Stephens Green Introduce Two way running on Kildare Street.

Kildare Street Westland Row

Stephens Green North West Corner. Luas construction and operation will reduce lane capacity in half.

LUAS Cross City Roads & Traffic Department will bring forward Traffic Proposals as outlined over the next number of Months. It is intended to put in place Traffic arrangements which will work both in the Construction and Operational Phases of Luas Cross City. Access to car parks, provision for Public Transport and Cyclists will be a key priority. Protect the retail and commercial activities along the route.