Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March.

Slides:



Advertisements
Similar presentations
Update on NRC Low-Level Waste Program – Major Activities Large Scale blending of LLRW -Issued guidance to agreement states for reviewing proposals for.
Advertisements

CURRENT METEOROLOGICAL HAPPENINGS THE SITING AND ACCIDENT CONSEQUENCES BRANCH DIVISION OF SITE AND ENVIRONMENTAL REVIEWS OFFICE OF NEW REACTORS Brad Harvey,
Topical Aspects on Monitoring Airborne Radioactive Effluents from NPPs Wan-tae KIM.
ASME SMR ROADMAP (STP-NU-072)
RETS – REMP Workshop NRC Activities June 25, 2007 Presented by Steve Garry.
Policy & Strategy: Environmental Protection George Oliver RETS/REMP Conference June 25-27, 2007.
Albert Coons April 21, 2009 Emergency Preparedness and New Reactor Licensing Process: An Update on Where We Are Now Federal Emergency Management Agency.
Meteorology Combined License NRC Review Process Meteorology Joseph Hoch Physical Scientist U.S. Nuclear Regulatory Commission June , 2008 Nuclear.
Perspectives on USNRC Study Request Nuclear & Radiation Studies Board April 26, 2010 Ralph Andersen, CHP Senior Director – Radiation Safety & Environmental.
“Regulatory Risk-Informed Activities and Supporting PRA Technical Acceptability” Presented to Nuclear Energy Standards Coordination Collaborative (NESCC)
Groundwater Protection Initiative Status George Oliver RETS/REMP Conference June 25-27, 2007.
1 NRC Regulatory Initiatives National Radiological Emergency Preparedness Conference 2009 April 21, 2009 Bill Dean Deputy Director, Office of Nuclear Security.
Release of Patients Treated with I-131: An Update Michael Fuller Team Leader Medical Radiation Safety Team U.S. NRC.
Implications of Tritium Dose Conversion Factors in Deriving Regulatory Limits for Drinking Water and Effluent Compliance Ken Sejkora Entergy Nuclear Northeast.
Dr. Jose Pires Structural, Geotechnical and Seismic Engineering Branch
NREP 2009 Emergency Preparedness and the New Reactor Licensing Process: An Update on Where We Are Now Dan Barss Division of Preparedness & Response Office.
NRC PERSPECTIVE ON RELIEF AND SAFETY VALVES Charles G. Hammer Component Performance & Testing Branch Division of Component Integrity Office of Nuclear.
The State of the ODCM 2004 RETS/REMP Workshop Jim Key Key Solutions, Inc.
Licensing of Nuclear Power Plants in Pakistan
Licensing Options for the First US Demonstration Fusion Power Plant S. Abdel-Khalik ARIES Meeting, San Diego (February 3, 2008) G. W. Woodruff School of.
1 NRC Plans for NESCC Concrete Specifications, Codes & Standards (SCS) Endorsement NESCC Meeting March 28, 2013 Richard Jervey USNRC Office of Regulatory.
Seismic Instrumentation and Monitoring Needs of US Nuclear Power Plants Dr. Annie Kammerer Seismic Instrumentation Technology Symposium November 2009.
NEI Issues & Current Events George Oliver June 22, th Annual RETS – REMP Workshop South Bend, Indiana.
NRC Endorsement of Standards
R. Brad Harvey, CCM Physical Scientist Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission 11th NUMUG Meeting, St. Louis, MO, October.
Quality Assurance Program National Enrichment Facility Warren Dorman September 19, National Energy and Environmental Conference.
NHUG - Boston - 08/04/20101 Considerations for Operability of Chillers and Chilled Water Systems NHUG Summer Meeting August 4, 2010 Tim Mitchell Component.
Energy Forum 2011, Changing the Energy Paradigm and Outlook for South-Eastern EU Energy Forum 2011 Nuclear Safety Regulation in Romania Recent Developments.
Small Modular Reactor Licensing Design Specific Review Standards 11/29/20121 Joseph Colaccino Acting Deputy Director Division of Advanced Reactors and.
Circuit Rider Training Program (CRTP) Circuit Rider Professional Association Annual General Meeting and Conference August 30, 2012.
Main Requirements on Different Stages of the Licensing Process for New Nuclear Facilities Module 4.5/1 Design Geoff Vaughan University of Central Lancashire,
Project Licensing Status Jim Kinsey Director, Regulatory Affairs NGNP Project.
1 Part 74 Material Control and Accounting (MC&A) Rulemaking Update NMMSS Users Annual Training Meeting Las Vegas, NV – May 20, 2010 Thomas Pham Material.
1 Options to Revise Radiation Protection Regulations SECY Kimyata Morgan Butler, Ph.D. Health Physicist/Project Manager Office of Federal and State.
Regulatory Framework for Uranium Production Facilities in the U.S.
1 Current Issues in Siting Safety Reviews Michelle Hart, Sr. Reactor Engineer Division of Site and Environmental Reviews NRC Regulatory Information Conference.
ANSI-NIST Nuclear Energy Standards Coordination Collaborative David Matthews, Director, Division of New Reactor Licensing Larry Burkhart, Chief, AP1000.
1 RIC 2009 NFPA 805 Regulatory Infrastructure Development Steven A. Laur, PE Sr. Tech Adv. Risk-Informed Initiatives NRC Office of Nuclear Reactor Regulation.
1 10 CFR Part 61: Licensing Requirements for Land Disposal of Radioactive Waste Gregory Suber, Branch Chief Environmental Protection & Performance Assessment.
1 RIC 2009 Perspectives on Digital I&C Licensing in the 10 CFR 52 Environment Thomas R. Fredette, PE NRO/DE/ICE2 March 11, 2009.
1 Impact of Revised 10 CFR 50.46(b) ECCS Acceptance Criteria 2009 Regulatory Information Conference Rockville, MD March 12, 2009 Mitch Nissley Westinghouse.
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
NRC Environmental Reviews for Uranium Recovery Applicants and Licensees James Park (301)
1 Public Meeting with ASME to Discuss Pump Inservice Testing Issues NRC Headquarters OWFN Room 1F22 June 4, 2007.
ISTOG – NRC Update Winter Meeting 2010 – Clearwater, FL Tony McMurtray Chief, Component Performance & Testing Branch Office of Nuclear Reactor Regulation.
Research and Test Reactor Decommissioning Inspections Gerald A. Schlapper, PhD, PE, CHP Health Physicist Division of Nuclear Materials Safety Region I.
Online Radiation Safety Training Programs Tomas Herrera FSME/MSSA/Licensing Branch OAS Annual Meeting Milwaukee, Wisconsin August 27-30, 2012.
1 RIC 2009 Design Acceptance Criteria: Searching for Acceptance Andrea Sterdis Tennessee Valley Authority March 11, 2009.
RIC 2009 Human Factors DAC/ITAAC Reviews Michael Junge USNRC/NRO/DCIP March 11, 2009.
Use and Conduct of Safety Analysis IAEA Training Course on Safety Assessment of NPPs to Assist Decission Making Workshop Information IAEA Workshop Lecturer.
Status Update on the NRC Proposed Rule to Amend 10 CFR Part 61
EPRI Comments Re: NRC “Low-Level Radioactive Waste Disposal”
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
Prescriptive vs Performance-Based Regulatory Approaches
Update on EPA Regulatory and Guidance Activities
10 CFR Part 61 Low Level Waste Disposal Rulemaking Update
Flooding Walkdown Guidance
Mitigation of Beyond Design Basis Events (MBDBE) Rule Implementation
NRC’s LLW Regulatory Program: Update of Emerging Issues
Advance Notice of Proposed Rulemaking 10 CFR Part 20
RCF Plenary Session 21 September 2018
Industry Input on NRC’s Low-Level Waste Program Strategic Assessment
Adding Nuclear Power to the Grid
Research and Test Reactor Decommissioning Inspections
NRC Update of LLW Emerging Issues
NRC Update Nader Mamish, Director Emergency Preparedness Directorate
SMR Regulators’ Forum Pilot Project Report
TRTR Briefing September 2013
RESOLUTION OF GENERIC SAFETY ISSUE 191
Research and Test Reactor Decommissioning Inspections
Presentation transcript:

Proposed Update of Appendix I to Part 50 RIC 2009 Radiation Protection Proposed Update of Appendix I to Part 50 Jean-Claude Dehmel NRO/DCIP/CHPB March 10, 2009

2 Rationale for Update Outdated Appendix I numerical guides for design objectives - dose criteria based on ICRP 2 dosimetry concepts -criteria inconsistent with current Part 20 (ICRP 26/30) -criteria inconsistent with ICRP 60 and 103 recommendations Difficult to defend a dual system of radiation protection Inconsistent with global approach in licensing new plants Inefficient for licensees and NRC staff ICRP 2 no longer taught in health physics university curriculum May undermine public confidence in NRC licensing process Potential challenges in design certifications & plant licensing See recently issued SECY for detailsSee recently issued SECY for details

3 Update of Appendix I to Part 50 Focus in Updating Appendix I Guides & Dose Criteria -align App. I criteria with Part 20 if revised, and, if not, -align App. I criteria with current Part 20 (ICRP 26/30) -reconsider criteria in Sections II.A, II.B, and II.C -update cost-benefit criteria in Section II.D -update definition of dose receptors in Sections II and IV -assess whether Sections I and V need qualifiers, i.e., existing fleet of reactors vs new plants -revise Section I in differentiating applicability between LWR, and Non-LWR and NGNP -review and update NRC guidance and regulatory guides

4 Update of Appendix I to Part 50 Reconsider dose criteria in Sect. II.A, II.B, & II.C -update dose definitions and express doses as ED or TED -keep the 3 & 5 mrem annual total body dose criteria for liquid and gaseous effluents -assess whether gamma and beta air dose criteria should remain -assess whether to omit reporting requirements for organ doses, e.g., skin, and thyroid -assess whether organ dose results be available for inspection, beyond that submitted in yearly reports

5 Update of Appendix I to Part 50 Update cost-benefit criteria in Section II.D -revise the cost-benefit ratio of $1,000 per person-rem to post dollars -assess if effluent treatment systems effectiveness have been maximized in new reactor design certifications and COLs -assess need to evaluate system augmentation in order of diminishing cost-benefit returns -redefine “items of reasonably demonstrated technology” for effluent treatment systems -restructure listings of effluent treatment systems of RG 1.110, as potential system augmentations -revise the associated maintenance, operating, and other costs of treatment systems in RG appendices

6 Update of Appendix I to Part 50 Other Associated Revisions - redefine compliance requirements for “licensed operation” for sites with multiple licensees under Part (a)(1) -assess whether compliance with Part (e) and 40 CFR Part 190 need further elaboration in Part 20 or guidance -update NRC licensing basis and guidance: > NUREG-0800 (SRP), RG 1.206, 1.109, 1.110, et al., > Generic Letter 89-01, NUREG-1301, -1302, and -0543, > other documents, computer codes, etc.

7 Update of Appendix I to Part 50 Thanks for your attentionThanks for your attention Any questions?Any questions?